PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Impact of life cycle cost analysis on the pontoon bridge concept selection

Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The article discusses main issues in relation to life cycle cost analysis (LCC) of armament systems. Examples of the application of LCC in civilian bridges have been provided. Furthermore, the structure of LCC for a pontoon bridge used in the Polish Armed Forces has been analyzed and a model for cost estimation with regard to LCC has been presented. The LCC analysis has been carried out for three concepts of a new pontoon bridge made of varying materials and the results of this analyses, as well as the probability of the application of LCC in the process of selecting the new construction of a pontoon bridge for the Polish Army have been explored.
Rocznik
Tom
Strony
61--76
Opis fizyczny
Bibliogr. 21 poz., rys., tab.
Twórcy
autor
  • Military Institute of Engineer Technology, Wrocław
  • Military Institute of Engineer Technology, Wrocław
Bibliografia
  • [1] MIL-HDBK-259, Military Handbook. Life Cycle Cost in Navy Acquisitions, 1983, Global Engineering Documents.
  • [2] MIL-HDBK-276-1, Military Handbook, Life Cycle Cost Model for Defense Material Systems, Data Collection Workbook, 1984.
  • [3] Simiński P.: Fazy życia obiektów technicznych - próba synchronizacji podejścia (pp.186-190) Kwartalnik Bellona 4/2014.
  • [4] STANAG 4728:2015 Ed 2, System Life Cycle Management 16 October 2015.
  • [5] AAP-48, NATO System Life Cycle Processes, Ed. B, March 2013.
  • [6] AAP-20 Programme Management Framework (NATO System Life Cycle Model) Ed. C October 2015.
  • [7] ISO/IEC 15288-2008: System and Software Engineering - System Life Cycle Processes.
  • [8] STANREC 4755:2015 Ed. 1, Reference Documents on Life Cycle Costs 17 June 2015.
  • [9] NO 06-A011:2013 Fazy cyklu życia techniki wojskowej.
  • [10] Decision No. 72/MON of the Minister of National Defence of 23 March 2013 on the procurement of military equipment and services for the Polish Armed Forces, Dz.U. MON, item 78, Warszawa 2013.
  • [11] Kostrow R., Milewski E., Figurski J., Ocena kosztów w cyklu życia systemu uzbrojenia i sprzętu wojskowego. Naukowe aspekty techniki uzbrojenia i bezpieczeństwa, Vol. I, 2008, Chapter 7 – Eksploatacja uzbrojenia.
  • [12] Kowalski K., Wojciechowski P.: Szacowanie kosztów cyklu życia pojazdów bojowych na platformie gąsienicowej, Szybkobieżne Pojazdy Gąsienicowe (30) No. 2, 2012 (pp. 33-44), OBRUM Sp. z o.o. Gliwice, 2012.
  • [13] Kowalski K., Wojciechowski P.: Model cyklu życia systemów uzbrojenia w Siłach Zbrojnych RP, Zeszyty Naukowe WSOWL (pp.110-121), No. 3 (169) 2013.
  • [14] Siwowski T., Propozycja zastosowania zasad zrównoważonego rozwoju w modernizacji mostu. Drogi i Mosty (pp. 55-91) No. 3/2008.
  • [15] Ehlen M., Marshall H., The Economics of New-Technology Materials: A Case Study of FRP Bridge Decking. Report No. NISTIR 5854. National Institute Of Standards and Technology, Gaithersburg, USA, 1996.
  • [16] Ehlen M.A.: BridgeLCC 2.0 user’s manual. Life-cycle costing software for preliminary design of bridges, Gaithersburg, USA, National Institute of Standards and Technology 2003.
  • [17] Daniel R.A.: Environmental considerations to structural material selection for a bridge. European Bridge Engineering Conference, Lightweight Bridge Decks, Rotterdam, 2003.
  • [18] Burman M., Lingg B., Villiger S., Enlund H., Hedlund-Åström A., Hellbratt S.E.:“Cost and Energy Assessment of a High-Speed Ship”, International Journal of Small Craft Technology, RINA – Part B 150(1): pp. 1-10, 2008.
  • [19] Sprawozdanie z realizacji projektu rozwojowego nr OR 00012309, pt.: "Lightweight, resistant to degradative environmental action, hybrid aluminium/composite pontoon for constructing floating bridges of MLC 70/110 class" Military Institute of Engineer Technology, Wrocław University of Technology, PREMO, Wrocław 2012.
  • [20] Założenia taktyczno-techniczne na most pontonowy klasy MLC 70/110 do pokonywania szerokich przeszkód wodnych kryptonim DAGLEZJA-P. Inspektorat Uzbrojenia Ministerstwa Obrony Narodowej, Warszawa, 2013.
  • [21] Kamyk Z.,Śliwiński C.: Etapy rozwoju konstrukcji modelu aluminiowokompozytowego bloku pontonowego, Inżynieria Wojskowa, problemy i perspektywy. (pp.143-154) WITI, Wrocław 2013.
Uwagi
PL
Opracowanie ze środków MNiSW w ramach umowy 812/P-DUN/2016 na działalność upowszechniającą naukę (zadania 2017).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-919febb3-3f99-4585-a9b8-d7dd5bf71518
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.