Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
Organizing manufacturing work in a way that minimizes delays in individual production operations is a key factor in a highly competitive market. One of the key factors to prevent delays is their correct identification and proper definition of methods to reduce their impact on selected parameters of the production process. The study pre-sents the impact of Lean Manufacturing tools (5S, standardization and Total Productive Maintenance) on delays in the manufacturing process. A statistical analysis of the level of delays was performed, which was aimed at showing the essence of using Lean Manufacturing tools to improve the efficiency of the production process. In the example analyzed, the implementation of selected LM tools allowed for a reduction of delays related to fail-ures by approximately 18 hours.
Słowa kluczowe
Wydawca
Czasopismo
Rocznik
Tom
Strony
103--107
Opis fizyczny
Bibliogr. 28 poz., rys., tab.
Twórcy
autor
- Silesian University of Technology Department of Production Engineering ul. Krasińskiego 8, 40-019 Katowice, Poland
Bibliografia
- 1 A.Y. Chang, Y.T. Cheng, „Analysis model of the sustainabil-ity development of manufacturing small and medium-sized enterprises in Taiwan.” Journal of Cleaner Produc-tion, vol 207(10), pp. 458-473, 2019.
- 2 J.M. Rohani, S.M. Zahraee, „Production line analysis via value stream mapping: a lean manufacturing process of color industry.” Procedia Manufacturing, No. 2, pp. 6-10, 2015.
- 3 B. Alkan, D.A. Vera, M. Ahmad, M. Ahmad, R. Harrison, “Complexity in manufacturing systems and its measures: a literature review.” European Journal of Industrial Engine-ering, 12(1), pp. 116-150, 2018.
- 4 J.M. Müller, O. Buliga, K. Voigt, “How SMEs approach busi-ness model innovations in Industry 4.0”. Technological Fo-recastingand Social Change, pp. 2-17, 2018.
- 5 J.M. Müller, D. Kiel, K.I. Voigt, “What Drives the Implemen-tation of Industry 4.0? The Role of Opportunities and Chal-lenges in the Context of Sustainability”. Sustainability, 10, 1, 2018.
- 6 J. Bendkowski, Zmiany w pracy produkcyjnej w perspekty-wie koncepcji „Przemysł 4.0”. Zeszyt Naukowy Politechniki Śląskiej, pp. 21-33, 2017.
- 7 D. Kiel, J.M. Müller, C. Arnold, K. Voigt, “Sustainable Indus-trial Value Creation: Benefits and Challenges of Industry 4.0”. International Journal of Innovation Management, 21, 8, 2017.
- 8 H.S. Birkel, J.W. Veile, J.M. Müller, E. Hartmann, K. Voigt, “Development of a Risk Framework for Industry 4.0 in the Context of Sustainability for Established Manufacturers”. Sustainability, pp. 384, 2019.
- 9 U. Dombrowski, T. Richter, P. Krenkel, “Interdependencies of industrie 4.0 & lean production systems: a use cases analysis”. Procedia Manufacturing, pp. 1061-1068, 2017.
- 10 T. Wagner, C. Herrmann, S. Thiede, “Industry 4.0 impacts on lean production systems.” Procedia CIRP, 63, pp. 125-131, 2017.
- 11 K. Mohan Sharma, S. Lata, “Effectuation of Lean Tool “5S”. Materials and Work Space Efficiency in a Copper Wire Drawing Micro-Scale Industry, Vol. 5, pp. 4678-4683, 2017.
- 12 N.A.A. Rahman, S.M. Sharif, M.M. Esa, “Lean Manufactur-ing Case Study with Kanban System Implementation”. Pro-cedia Economics and Finance, Vol. 7, pp. 174-180, 2013.
- 13 N. Nandakumar, P.G. Saleeshya, P. Harikumar, “Bottleneck Identification And Process Improvement By Lean Six Sigma DMAIC Methodology.” Materials Today: Proceedings, No. 24, pp. 1217-1224, 2020.
- 14 M. Ghosh, “Lean Manufacturing performance in Indian Manufacturing Plan”. Journal of Manufacturing Tech Ma-nagement, No. 24, pp. 113-122, 2013.
- 15 B.V. Chowdary, D. George, “Improvement of manufactur-ing operations at a pharmaceutical company”. Journal of Tech Management, No. 23, pp. 6-75, 2013.
- 16 [16] H.T.S. Caldera, C. Desha, L. Dawes, “Exploring the role of lean think-ing in sustainable business practice” A system-atic literature review. J. Clean. Prod., 167, 1546-1565, 2017.
- 17 S. Thanki, K. Govindan, J. Thakkar, “An investigation on lean-green implementation practices in Indian SMEs using analytical hierarchy pro-cess (AHP) approach.” J. Clean. Prod., 135, pp. 284-298, 2016.
- 18 D.M. Nguyen, T.K. Duong, “Enterprises Characteristics and Lean Out-come: An Empirical evidence from Vietnam Man-ufacturing” Management System in Production Engineer-ing, 2(30), pp. 98-108, 2022.
- 19 R.S. Mor, A. Bhardwaj, S. Singh, A. Sachdeva, „Productivity gainsthrough standardization-of-work in a manufacturing company” Journal of Manufacturing Technology Manage-ment, 30(6), pp. 899-919, 2019.
- 20 Kaizen Institute. Standardization. Global Leader & Pioneer in Kaizen/Lean/Operation Excellence Domain, 2013.
- 21 E. Jiménez, A.S. Tejeda, M Pérez, J. Blanco, E. Martínez, „Applicabilityof lean production with VSM to the Rioja wine sector” Int. J. Prod. Res. ,50, pp. 1890-1904, 2015.
- 22 B.S. Sidhu, V. Kumar, A. Bajaj, „The “5S” strategy by using PDCA cycle for continuous improvement of the manufac-turing processes in agriculture industry,” Int. J. Res. Ind. Eng. J. homepage, 2, pp. 10-23, 2013.
- 23 S. Pawlak, „Analysis of the impact of selected Lean Manu-facturing tools on the parameters of the production pro-cess – case study” Zeszyty Naukowe Politechniki Śląskiej. Organizacja i Zarządzanie, pp. 379-391, 2023.
- 24 S. Bhasin, P. Burcher, „Lean viewed as a philosophy”, Jour-nal of Manufacturing Technology Management, pp. 56-72, 2016.
- 25 S. Singh, A. Agrawal, D. Sharma, V Saini, A. Kumar, S Praveenkumar, „Implementation of Total Productive Maintenance Approach: Improving Overall Equipment Ef-ficiency of a Metal Industry” Inventions, pp. 119, 2022.
- 26 S. Pawlak, K. Nowacki, H. Kania, „Analysis of the impact of the 5S tool and standardization on the duration of the pro-duction process – case study. Production Engineering Ar-chives, 29, pp. 421-427, 2023.
- 27 G. Pinto, F.J.G Silva, A. Baptista, O. Nuno, R. Fernandes, C. Casais, R. Samuel, „TPM implementation and maintenance strategic plan – a case study”. Procedia Manufacturing, Vol. 51, pp. 1423-1430, 2020.
- 28 R. Singh, A. Ashish, M. Gohil, B. Dhaval, D Shah, „Total Pro-ductive Maintenance (TPM) Implementation in a Machine Shop: A Case Study”, Production Engineering, pp. 592-599, 2013.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr POPUL/SP/0154/2024/02 w ramach programu "Społeczna odpowiedzialność nauki II" - moduł: Popularyzacja nauki i promocja sportu (2025).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-8ec8c3de-c63f-4f35-9412-3f6acb7e3ae4
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.