PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Workplace design in Indonesian manufacturing small and medium-sized enterprises: Review and further research

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Workplace design is an essential process for the manufacturing industry to realize a low manufacturing cost with high productivity and competitive advantage, as well as high employee performance and well-being. Although research on workplace design in the Indonesian manufacturing industry began more than 20 years ago, workplace conditions in the manufacturing industry, especially in small and medium-sized enterprises (SMEs) in Indonesia, have remained subpar, with high material handling costs. This review article aims to evaluate recent research on workplace design in the Indonesian man-ufacturing SMEs and explore possible directions for further research. The results of this review indi-cate that the research on workplace design in Indonesian manufacturing SMEs is mostly focused on the department area (micro-level), using systematic layout planning methods to improve material han-dling activities. Even though environmental conditions are unfavorable with low levels of occupational safety and health, research that consider these two in the process of designing workplace in Indonesian manufacturing SMEs is still limited. This review also shows the possibility of developing an integrated workplace design by involving environmental ergonomics and occupational safety and health in man-ufacturing SMEs.
Rocznik
Strony
115--126
Opis fizyczny
Bibliogr. 110 poz., rys.
Twórcy
  • Department of Industrial Engineering, Universitas Indonesia
  • Department of Industrial Engineering, Universitas Indonesia
  • suzianti@ui.ac.id
  • Department of Industrial Engineering, Universitas Indonesia
Bibliografia
  • 1. Abdous, M. A., Finco, S., Visentin, V., 2018. Workload evaluation of indus-trial work: Existing methods and practical applications, Proceedings of the Summer School Francesco Turco, 395-401.
  • 2. Abeid, A. H., 2015. Investigation of workplace environment: The case of selected micro and small manufacturing enterprises in Tanzania, Interna-tional Journal of Engineering Research & Technology (IJERT), 4(6), 827-832.
  • 3. Adiasa, I., Suarantalla, R., Rafi, M. S., Hermanto, K., 2020. Perancangan ulang tata letak fasilitas pabrik di CV. Apindo Brother Sukses menggunakan metode systematic layout planning (SLP), Performa: Media Ilmiah Teknik Industri, 19(2), 151–158, DOI: 10.20961/per-forma.19.2.43467 (in Indonesian)
  • 4. Adiyanto, O., Clistia, A. F., 2020. Perancangan ulang tata letak fasilitas produksi UKM Eko Bubut dengan metode computerized relationship layout planning (CORELAP), Jurnal Integrasi Sistem Industri, 7(1), 49-56. (in Indonesian)
  • 5. Adiyanto, O., Paldo, K. M. R., 2019. Perancangan tata letak fasilitas produksi UKM Eko Bubut menggunakan metode automated layout design program (ALDEP), Teknoin, 25(2), 66-79, DOI: 10.20885/teknoin.vol25.iss2.art1 (in Indonesian)
  • 6. Akbilek, N., 2018. Ergonomic assessment and workplace design in dairy pro-cessing industry, Advances in Social & Occupational Ergonomics, AHFE 2017, Springer, Cham, 295-306, DOI: 10.1007/978-3-319-60828-0_30
  • 7. Al-Haq, Z., Antara, N. S., Hartiati, A., 2015. Perancangan tata letak ulang (relayout) pabrik terhadap tingkat produksi produk bakso ayam (studi ka-sus pada pabrik bakso UD. Supra Dinasty Denpasar), Jurnal Rekayasa dan Manajemen Agroindustri, 3(2), 80-91. (in Indonesian)
  • 8. Amalia, R. R., Ariyani, L., Noor, M., 2018. Perancangan ulang tata letak fasil-itas industri tahu untuk meminimalkan material handling dengan algoritma blocplan di UD. Pintu Air, Jurnal Teknologi Agro-Industri, 4(2), 89-100, DOI: 10.34128/jtai.v4i2.54 (in Indonesian)
  • 9. Amri, Meutia, S., Syuaib, M., 2015. Perancangan ulang tata letak pabrik menggunakan metode systematic layout planning (SLP) pada UD. Indaco Bireun, Prosiding SNTI 2015, Lhokseumawe, Aceh, Indonesia, 195–203. (in Indonesian)
  • 10. Anggraini, F., Sunarni, T., 2019. Usulan perbaikan tata letak dengan menggunakan metode fraktal (studi kasus di perusahaan mebel X), Jurnal Metris, 20, 89-102. (in Indonesian)
  • 11. Anisa, N., 2014. Alternatif tata letak fasilitas (mesin) menggunakan cellular manufacturing system di UD. Tri Rejeki Madiun, Jurnal Agri-Tek, 15(2), 1-8. (in Indonesian)
  • 12. Anthara, I. M. A., 2010. Usulan perbaikan tata letak lantai produksi dengan metode CRAFT untuk meminimasi ongkos material handling (studi ka-sus CV. Karya Mekar Bandung), Majalah Ilmiah UNIKOM, 8(1), 107-118. (in Indonesian)
  • 13. Anwar, A., Bakhtiar, B., Nanda, R., 2015. Usulan perbaikan tata letak pabrik dengan menggunakan systematic layout planning (SLP) di CV. Arasco Bireuen, Malikussaleh Industrial Engineering Journal, 4(2), 4-10. (in In-donesian)
  • 14. Arif, M., Sulastri., 2017. Perancangan ulang lay out pabrik tahu Makmur Jaya di Dumai, Prosiding Semnas Teknik 2017, Dumai, Indonesia, 106-116. (in Indonesian)
  • 15. Arios, A. L., 2020. Usulan perbaikan layout produksi garam di CV. X sebagai upaya meningkatkan efisiensi, efektifitas dan penerapan SNI garam, Majalah Teknologi Agro Industri (Tegi), 12(2), 53-57. (in Indonesian)
  • 16. Ariyanti, S., Widodo, L., Zulkarnain, M., Timotius, K., 2019. Design work station of pipe welding with ergonomic approach, Sinergi, 23(2), 107-114, DOI: 10.22441/sinergi.2019.2.003
  • 17. Astuti, M., Poerwanto, E., Trianingsih, A., 2017. Analisis tata letak fasilitas dengan menggunakan metode activity relationship chart pada industri mebel bambu Karya Manunggal Yogyakarta, Prosiding SENATIK 2017, Yogyakarta, Indonesia, DOI: 10.28989/senatik.v3i0.137 (in Indonesian)
  • 18. Baleshzar, A., Tabbodi, M., 2019. The relationship of environmental archi-tecture with the level of job satisfaction and productivity among the em-ployees of Islamic Azad University, Shiraz Branch, Journal of Health Managament & Informatics, 6(1), 22-27.
  • 19. Ben-Gal, I., Bukchin, J., 2002. The ergonomic design of workstations using virtual manufacturing and response surface methodology, IIE Transac-tions (Institute of Industrial Engineers), 34(4), 375-391, DOI:/10.1080/07408170208928877
  • 20. Cahyono, B. D., Simanjuntak, R. A., Oesman, T. I., 2018. Usulan perancangan tata letak parik dengan metode systematic layout planning pada WL Alumunium, Prosiding IENACO 2018, Surakarta, Indonesia, 233-240. (in Indonesian)
  • 21. Castellone, R., Spada, S., Sessa, F., Cavatorta, M. P., 2017. A simple multi-body 2d-model for early postural checks in workplace design, International Journal of Applied Engineering Research, 12(23), 13451-13461.
  • 22. Corlett, E. N., Clark, T. S., 2009. The Ergonomics of Workspaces and Ma-chines: A Design Manual, Taylor & Francis Ltd., London.
  • 23. Czaja, S. J., Nair, S. N., 2006. Human Factors Engineering and Systems Design, Handbook of Human Factors and Ergonomics, John Wiley & Sons, Inc., 32-49, DOI: 10.1002/0470048204.ch2
  • 24. Daya, M. A., Sitania, F. D., Profita, A., 2018. Perancangan ulang tata letak fasilitas produksi dengan metode blocplan (Studi kasus: UKM Roti Rizki, Bontang), Performa: Media Ilmiah Teknik Industri, 17(2), 140-145, DOI: 10.20961/performa.17.2.29664 (in Indonesian)
  • 25. Deros, B. M., Khamis, N. K., Ismail, A. R., Jamaluddin, H., Adam, A. M., Rosli, S., 2011. An ergonomics study on assembly line workstation de-sign, American Journal of Applied Sciences, 8(11), 1195-1201, DOI: 10.3844/ajassp.2011.1195.1201
  • 26. Dewa, K. B., Mulia, A., Yunitasari, D. P., 2018. Perancangan tata letak dan fasilitas menggunakan metode simulasi untuk meminimasi biaya material handling, Prosiding IENACO 2018, Surakarta 295-300. (in Indonesian)
  • 27. Dewi, L. T., Sari, M. H. R. S. R., Dewi, C., Ariyono, V., 2015. Implementasi prinsip ekonomi gerakan untuk pengaturan tata letak fasilitas kerja pada pemrosesan batu alam, Performa, 14(2), 149–156, DOI: 10.20961/per-forma.14.2.11488 (in Indonesian)
  • 28. Dianat, I., Vahedi, A., Dehnavi, S., (2016). Association between objective and subjective assessments of environmental ergonomic factors in manufac-turing plants, International Journal of Industrial Ergonomics, 54, 26-31, DOI: 10.1016/j.ergon.2015.12.004
  • 29. Djunaidi, M., Nugroho, M. T., Anton, J., 2006. Simulasi group technology system untuk meminimalkan biaya material handling dengan metode heuristic, Jurnal Ilmiah Teknik Industri, 4(3), 129-138. (in Indonesian)
  • 30. Dragcevic, Z., Kirin, S., Saravanja, B., 2011. A method of workplace design for sewing operations, Proceedings of the 22nd International DAAAM Symposium, DAAAM International, Vienna, Austria, 379-380.
  • 31. Faishal, M., Pratama, M. A., 2019. Perancangan ulang tata letak fasilitas pe-rusahaan sandal hotel dengan metode ARC untuk mengurangi waste, Jurnal Teknologi, 12(2), 116–122. (in Indonesian)
  • 32. Faishal, M., Putra, M. K., 2019. Perancangan ulang tata letak fasilitas industri sandal dengan metode CORELAP, Jurnal Material dan Proses Manufaktur, 3(2), 116-125, DOI: 10.18196/jmpm.3245 (in Indonesian)
  • 33. Faiz, A. H., Fadhlurrohman, N., Salsabila, Z. F., 2019. Perancangan tata letak fasilitas pada UKM Tajusa Drumband menggunakan pendekatan simulasi guna menurunkan ongkos material handling, Prosiding IENACO 2019, Surakarta, Indonesia, 53-60. (in Indonesian)
  • 34. Fatoni, R., Mayasari, H. D., Sholaika, A. M., Susanto, Y., 2013. Perancangan ulang tata letak pabrik dan analisa keselamatan dan kesehatan kerja (studi kasus CV Okabawes Karya Logam), Prosiding Simposium Nasional RAPI XII, Surakarta, Indonesia, 52-59. (in Indonesian)
  • 35. Febianti, E., Herlina, L., Khoiriah, F., 2011. Relayout fasilitas produksi dengan menggunakan algoritma blocplan, Teknika: Jurnal Sains dan Teknologi, 7(2), 125-133. (in Indonesian)
  • 36. Fulder, T., Pizmoht, P., Polajnar, A., Leber, M., 2005. Ergonomically designed workstation based on simulation of worker’s movements, International Journal of Simulation & Modelling, 4(1), 27-34, DOI: 10.2507/IJSIMM04(1)3.038
  • 37. Gunanti, N. A., Subagyo, A. M., Herwanto, D., Arifin, J., 2021. Optimasi tata letak fasilitas menggunakan algoritma blocplan dan corelap. Journal of Industrial and Manufacture Engineering, 5(2), 107-120, DOI: 10.31289/jime.v5i2.5555 (in Indonesian)
  • 38. Hamzah, A., 2020. Perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning (SLP) dan 5S di CV. Seken Living, IEJST (Industrial Engineering Journal of The University of Sarjanawiyata Tamansiswa), 4(1), 10-21. (in Indonesian)
  • 39. Hendrawan, D., Mulyati, D. S., 2021. Usulan perancangan ulang tata letak fasilitas dengan metode algoritma corelap di CV. X, Industrial Engineering Science, 1(1), 31-38. (in Indonesian)
  • 40. Hermawati, S., Lawson, G., Sutarto, A. P., 2014. Mapping ergonomics application to improve SMEs working condition in industrially developing countries: a critical review, Ergonomics, 57(12), 1771-1794, DOI: 10.1080/00140139.2014.953213
  • 41. Herwanto, D., Suzianti, A., 2020. An Environmental Ergonomics Review of Small Medium Enterprises Workplace Condition in Indonesia, Proceedings of the 3rd Asia Pacific Conference on Research in Industrial and Systems Engineering 2020, ACM, New York, 213-218, DOI: 10.1145/3400934.3400974
  • 42. Hidayat, N. P. A., 2012. Perancangan tata letak departemen finishing pabrik CV. SG-Bandung, Jurnal Teknik Industri, 2(2), 137-146. (in Indonesian)
  • 43. Husen, T. A., Suryadhini, P. P., Astuti, M. D., 2020. Perancangan tata letak fasilitas untuk meminimasi jarak material handling pada UKM XYZ menggunakan metode ALDEP, Prosiding IDEC 2020, Surakarta, Indo-nesia, A08.1-A08.12. (in Indonesian)
  • 44. ILO, 2013. Keselamatan dan Kesehatan Kerja: Sarana untuk Produktivitas. International Labour Office, Jakarta. (in Indonesian)
  • 45. ILO, 2014. Hari Keselamatan dan Kesehatan se-Dunia 2014: Mempromo-sikan budaya keselamatan di usaha kecil menengah di Indonesia. https://www.ilo.org/jakarta/info/public/pr/WCMS_241780/langen/index.htm (in Indonesian)
  • 46. Irmanto, I. N., Darmawan, M. I., Ningsih, Y., 2021. Perancangan ulang tata letak fasilitas pabrik dalam upaya efisiensi material handling di UD. Do-nesi, Jurnal Teknologi Pertanian Andalas, 25(1), 16-24, DOI: 10.25077/jtpa.25.1.16-24.2021 (in Indonesian)
  • 47. Jaya, J. D., Nuryati, Audinawati, S. A. N., 2017. Perancangan ulang tata letak fasilitas produksi UD. Usaha Berkah berdasarkan activity relationship chart (ARC) dengan aplikasi blocplan-90, Jurnal Teknologi Agro-Indus-tri, 4(2), 111–123, DOI: 10.34128/jtai.v4i2.56 (in Indonesian)
  • 48. Kalijaga, M. A., Restiana, R., Fadhlurrohman, N., 2018. Perancangan tata le-tak fasilitas pada UKM A3 aluminium Yogyakarta menggunakan software Flexsim 6.0, Prosiding IENACO 2018, Surakarta, Indonesia, 178-184. (in Indonesian)
  • 49. Kartika, I. M., 2014. Perancangan tata letak area produksi dengan menggunakan ARC pada CV Gading Putih di Semarang, CALYPTRA, 3(1), 1-18. (in Indonesian)
  • 50. Kumalasari, E., Puspitorini, P. S., Putra, A. C., Ernes, A., 2019. Activity relationship chart sebagai perancangan tata letak fasilitas miniplant pada produksi chips porang di Desa Jembul, Prosiding SNP2M UNIM 2018, Mojokerto, Indonesia, 83-88. (in Indonesian)
  • 51. Kurniawan, I. D., Susetyo, J., Simanjuntak, R. A., 2020. Perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning (SLP) dan peta tangan kanan tangan kiri proses perakitan, Jurnal Rekavasi, 8(2), 13-22. (in Indonesian)
  • 52. Launis, M., Vuori, M., Lehtelä, J., 1996. Who is the workplace designer? - Towards a collaborative mode of action, International Journal of Indus-trial Ergonomics, 17(4), 331–341, DOI: 10.1016/0169-8141(95)00058-5
  • 53. Lee, Q., Amundsen, A. E., Nelson, W., Tuttle, H., 1997. Facilities and Work-place Design: An Illustrated Guide, first ed.. Engineering & Management Press, Norcross, Georgia.
  • 54. Linauliyamara, R. R., Nurcahyati, Muqaffi, M. S., 2018. Perancangan tata le-tak fasilitas produksi wajan TS Putra Yogyakarta, Prosiding IENACO 2018, Surakarta, Indonesia, 322-329. (in Indonesian)
  • 55. Lubis, P. S., Dewi, H. A. R. N., Selvi, E., 2022. Redesain tata letak pabrik gula dalam meningkatkan efesiensi dan produktivitas CV. Rizki Abadi, J-MAS (Jurnal Manajemen dan Sains), 7(1), 120-132, DOI: 10.33087/jmas.v7i1.342 (in Indonesian)
  • 56. Marmaras, N., Nathanael, D., 2012. Workplace Design. Handbook of Human Factors and Ergonomics, fourth ed. John Wiley & Sons, Inc., Hoboken, New Jersey.
  • 57. Martha, N. S., Ardiansah, I., 2020. Usulan perbaikan tata letak fasilitas pro-duksi industri kopi studi kasus CV. Tri Anom Agrotektur, Jurnal Rekayasa Sistem Industri, 5(2), 125-133. (in Indonesian)
  • 58. Morena, Y., Siska, M., 2011. Perancangan ulang tata letak fasilitas pabrik pembuatan batu bata (Studi kasus: Kulim, Pekanbaru). Prosiding Seminar Nasional Teknologi Informasi Komunikasi dan Industri (SNTIKI) III 2011, Pekanbaru, Indonesia, 405-413. (in Indonesian)
  • 59. Mubarok, H., Lukmandono., 2017. Perancangan ulang tata letak fasilitas dengan pendekatan metode systematic layout planning guna meningkatkan produktivitas di CV. Putra Perkasa, Prosiding Sntekpan Itats V 2017, Surabaya, Indonesia, 129-134. (in Indonesian)
  • 60. Mufti, D., Ikhsan, A., Putri, T. M., 2019. Workplace Ergonomic Risk Assess-ment Toward Small-Scale Household Business, IOP Conference Series: Materials Science and Engineering, 528(1), 012013. DOI: 10.1088/1757-899X/528/1/012013
  • 61. Mulyati, G. T., Wagiman, Madyana, A. M., 2004. Perancangan tata letak vertikal pembuatan emping melinjo, Agritech, 24(2), 59-64. (in Indone-sian)
  • 62. Muralidaran, V. M., Arun, V., Siddarth, R. S., Krishna, S. A., 2017. Ergo-nomic considerations for design of industrial workstation: A review, International Research Journal of Engineering and Technology (IRJET), 04(10), 276-281.
  • 63. Nelfiyanti, Rani, A. M., Ramadhan, A. I., 2016. Perancangan sistem informasi dan tata letak fasilitas produksi tas CV. Banua dengan menggunakan algoritma corelap, Prosiding Semnastek 2016, Jakarta, Indonesia, 1-6. (in Indonesian)
  • 64. Nugeroho, A. A. U., 2021. Usulan perbaikan tata letak fasilitas pabrik tahu dengan metode systematic layout planning, Jurnal Optimasi Teknik In-dustri (JOTI), 3(2), 65-69, DOI: 10.30998/joti.v3i2.10452 (in Indone-sian)
  • 65. Nurhasanah, N., Simawang, B. P., 2013. Perbaikan rancangan tata letak lantai produksi di CV. XYZ, Jurnal Al-Azhar Indonesia Seri Sains dan Teknologi, 2(2), 81-90, DOI: 10.36722/sst.v2i2.128 (in Indonesian)
  • 66. Oktarini, D., Suryani, F., Madagaskar, Rosyidah, M., 2019. Modernization of facility layout design in earthenware craft industry with green productiv-ity approach, IOP Conference Series: Materials Science and Engineering, 620(1), 012114, DOI: 10.1088/1757-899X/620/1/012114
  • 67. Pambudi, Y. D. S., Sari, I. A., 2019. Alternatif perancangan tata letak mesin produksi di CV. Anugerah Sukses Sejahtera, JISO: Journal of Industrial and Systems Optimization, 2(2), 49-54. (in Indonesian)
  • 68. Patra, O., Ramadhan, R., 2020. Usulan perbaikan tata letak fasilitas departemen produksi dengan algoritma craft (Studi kasus di CV. Grand Manu-facturing Indonesia), Sistemik (Jurnal Ilmiah Nasional Bidang Ilmu Teknik), 08(02), 34–41. (in Indonesian)
  • 69. Pramesti, M., Subagyo, H. S. H., Aprilia, A., 2019. Perencanaan ulang tata letak fasilitas produksi keripik nangka dan usulan keselamatan kesehatan kerja di UMKM Duta Fruit Chips, Kabupaten Malang, Agrisocionomics: Jurnal Sosial Ekonomi dan Kebijakan Pertanian, 3(2), 150-164. (in Indo-nesian)
  • 70. Prasetya, Y. Y., Runtuk, J. K., Hartanti, L. P. S., 2015. Analisis tata letak fasilitas dalam meminimasi material handling (Studi kasus: perusahaan roti Matahari), Jurnal Gema Aktualita, 4(1), 1-10. (in Indonesian)
  • 71. Pratiwi, I., Muslimah, E., Aqil, A. W., 2012. Perancangan tata letak fasilitas di industri tahu menggunakan blocplan, Jurnal Ilmiah Teknik Industri, 11(2), 102-112. (in Indonesian)
  • 72. Putra, Y. P., 2018. Merancang tata letak fasilitas pabrik dengan metode algoritma corelap di CV. Robbani Singosari, Jurnal Valtech, 1(1), 65-70. (in Indonesian)
  • 73. Qisthani, N. N., Sitorus, I. A., Lusianti, H. A., 2021. Perancangan dan simu-lasi tata letak pabrik untuk mengoptimalkan biaya material handling dengan menggunakan algoritma craft dan activity relationship chart pada industri kerajinan bambu, Journal of Industrial Engineering: Scientific Journal on Research and Application of Industrial System, 6(1), 35-41, DOI: 10.33021/jie.v6i1.1433 (in Indonesian)
  • 74. Rajak, S., 2018. Optimasi Tata Letak Fasilitas Produksi Menggunakan Algoritma Genetika. Universitas Islam Indonesia. (in Indonesian)
  • 75. Ramaditya, A. R., Sunardi, Santoso, B., 2017. Analisis kebisingan suara me-sin untuk perancangan tata letak mesin pada CV Mitra Baru Teknik, Tekmapro: Journal of Industrial Engineering and Management, 12(02), 56-66. (in Indonesian)
  • 76. Rengganis, E., Mauidzoh, U., 2021. Relayout penempatan fasilitas produksi dengan menggunakan metode systematic layout planning dan metode 5 S guna meminimalkan biaya material handling, Jurnal Rekayasa Industri (JRI), 3(1), 31-40, DOI: 10.37631/jri.v3i1.289 (in Indonesian)
  • 77. Rokhmani, E. W., Desiyanto, F., Harsadi, D. I., 2021. Perencanaan tata letak fasilitas mesin produksi menggunakan metode activity relationship chart (ARC) di CV. Yasri Cipta Mandiri, Jurnal Pendidikan dan Aplikasi In-dustri (UNISTEK), 8(2), 107-112. (in Indonesian)
  • 78. Rozak, A., Kristanto, A. D., Raharjo, G. S., Saleh, N. A., 2021. Penerapan ARC dan ARD untuk membuat rancangan layout fasilitas pada pabrik kerupuk menggunakan blocplan di CV Arto Moro, Bulletin of Applied Industrial Engineering Theory, 2(2), 145-149. (in Indonesian)
  • 79. Samsudin, L. M., Afma, V. M., Purbasari, A., 2014. Perancangan ulang tata letak pabrik jamur tiram menggunakan metode activity relationship chart untuk meningkatkan produktivitas (Studi kasus CV. Mandiri Tiban III), Profesiensi, 2(1), 19-27. (in Indonesian)
  • 80. San, G. S., Wahjudi, D., 2000. Analisa tata letak pabrik untuk meminimalisasi material handling pada pabrik koper, Jurnal Teknik Mesin, 2(1), 41-49. (in Indonesian)
  • 81. Sanjog, J., Patel, T., Karmakar, S., 2019. Occupational ergonomics research and applied contextual design implementation for an industrial shop-floor workstation, International Journal of Industrial Ergonomics, 72, 188-198. DOI: 10.1016/j.ergon.2019.05.009
  • 82. Santos, M. S. e., 2012. The PhOCoe Model - ergonomic pattern mapping in participatory design processes, Work, 41, 2643-2650. DOI: 10.3233/WOR-2012-0507-2643
  • 83. Santoso, Halim, C., 2012. Usulan tata letak fraktal untuk pabrik baru dari CV Prima Bangun Nusantara, INASEA, 13(2), 100-108. (in Indonesian)
  • 84. Saputra, B., Arifin, Z., Merjani, A., 2020. Improvement of facility layout using systematic layout planning (slp) method to reduce material movement distance (Case study at UKM Kerupuk Karomah), Profisiensi, 8(1), 71-82. (in Indonesian)
  • 85. Sari, S. A., 2012. Desain stasiun kerja proses pelunakkan dan pembengkokkan rotan untuk peningkatan produktivitas di UD. Rukun Rotan-Balearjosari Malang, Industri Inovatif, 2(2), 42-46. (in Indonesian)
  • 86. Sembiring, A. C., Sitanggang, D., Budiman, I., Aloina, G., 2019. Redesign layout of production floor facilities using algorithm CRAFT, IOP Conference Series: Materials Science and Engineering, 505(1), 012016. DOI: 10.1088/1757-899X/505/1/012016
  • 87. Setiyawan, D. T., Qudsiyyah, D. H., Mustaniroh, S. A., 2017. Usulan perbai-kan tata letak fasilitas produksi kedelai goreng dengan metode blocplan dan corelap (Studi kasus pada UKM MMM di Gading Kulon, Malang), Industria: Jurnal Teknologi dan Manajemen Agroindustri, 6(1), 51-60. DOI: 10.21776/ub.industria.2017.006.01.7 (in Indonesian)
  • 88. Shamusideen, K., Ukpomwan, N., 2014. Industrial Workplace Design and Physiological Consideration of Work in Developing Countries, Les Actes de La Deuxième Conférence Internationale Sur : L’application de l’er-gonomie Dans Les Pays En Voie de Développement, Alger, 37–51.
  • 89. Siahaan, R. C., Oktiarso, T., 2018. Perancangan tata letak lantai produksi baru dengan metode systematic layout planning, Journal of Integrated System, 1(2), 161-179. (in Indonesian)
  • 90. Siska, M., Henriadi., 2012. Perancangan fasilitas pabrik tahu untuk memini-malisasi material handling, Jurnal Teknik Industri, 13(2), 133-141. DOI: 10.22219/JTIUMM.Vol13.No2.133-141 (in Indonesian)
  • 91. Siska, M., Retno, D., Sari, M., Hartati, M., Nur, M., 2019. Rancang ulang tata letak fasilitas pabrik dengan metode systematic layout planning dan simulasi arena di industri pallet kayu, Prosiding SNTIKI 11, Pekanbaru, In-donesia, 656-667. (in Indonesian)
  • 92. Siska, M., Risman, F., 2017. Rancang ulang tata letak CV. Sumber Vulkanisir Super menggunakan metode konvensional dan craft, Jurnal Sains dan Teknologi Industri, 14(2), 225-233. (in Indonesian)
  • 93. Siska, M., Sabri, F., 2016. Perancangan ulang tata letak pabrik vulkanisir ban, Prosiding SNTIKI 8 - 2016, Pekanbaru, Indonesia, 341–352. (in Indone-sian)
  • 94. Sitohang, R. B., Anthara, I. M. A., 2017. Usulan perbaikan layout lantai produksi produk spare part saringan oli motor di CV. Grand Manufacturing Indonesia, INAQUE: Journal of Industrial & Quality Engineering, 6(1), 57-66. (in Indonesian)
  • 95. Suhardini, D., Rahmawati, S. D., 2019. Design and improvement layout of a production floor using automated layout design program (ALDEP) and CRAFT algorithm at CV. Aji Jaya Mandiri, IOP Conference Series: Ma-terials Science and Engineering, 528(1), 1-8. DOI: 10.1088/1757-899X/528/1/012062
  • 96. Sutalaksana, I. Z., Widyanti, A., 2016. Anthropometry approach in workplace redesign in Indonesian Sundanese roof tile industries, International Journal of Industrial Ergonomics, 53, 299-305. DOI: 10.1016/j.er-gon.2016.03.002
  • 97. Syaichu, A., Nurhuda, W., 2021. Perencanaan ulang stasiun kerja untuk meminimalkan biaya material handling menggunakan metode ARC (activity relationship chart) dan FTC (from to chart) CV Karsa Galih Kusuma, Jurnal Ilmu-Ilmu Teknik - Sistem, 17(3), 9-19. (in Indonesian)
  • 98. Syarif, A. A., Bedros, R. O., 2017. Rancangan ulang tata letak pabrik dengan menggunakan blocplan (studi kasus di UD. Roti Jamal), Juitech, 01(02), 103-113. (in Indonesian)
  • 99. Tahir, S., Syukriah, Baidhawi, S., 2015. Usulan perbaikan tata letak fasilitas dengan menggunakan algoritma CRAFT, Malikussaleh Industrial Engineering Journal, 4(2), 36-41. (in Indonesian)
  • 100. Tanjung, W. N., Harimansyah, F. H., 2014. Usulan perbaikan tata letak fasilitas lantai produksi produk sepatu perlengkapan dinas harian (Studi kasus pada CV. Mulia), JIEMS: Journal of Industrial Engineering & Management Systems, 7(1), 39-53. (in Indonesian)
  • 101. Teicholz, E., 2004. Facility Design and Management Handbook. McGraw Hill, New York.
  • 102. Trisusanto, D., Bariyah, C., Kristanto, A., 2020. Design of ergonomic work facilities on assembly station of mozaic stone for increasing work produc-tivity, Asia-Pacific Journal of Science and Technology, 25(1), 1-11.
  • 103. Wahyuni, R. S., Safitri, A. A., 2014. Metode CRAFT berbantuan perangkat lunak WinQsb untuk usulan perbaikan tata letak fasilitas V2.0 pada industri dompet CV. X, Jurnal Teknologi dan Rekayasa, 19(3), 15-23. (in Indonesian)
  • 104. Wang, Q., Mei, Q., Liu, S., Zhang, J., 2018. Analysis of managing safety in small enterprises: Dual-effects of employee prosocial safety behavior and government inspection, BioMed Research International, 2018, 1-12, DOI: 10.1155/2018/6482507
  • 105. Wati, P. E. D. K., Singgih, M., 2019. Perancangan ulang tata letak fasilitas dengan memperhatikan aspek ergonomi lingkungan, Jurnal Teknologi dan Terapan Bisnis (JTTB), 2(2), 33-41. (in Indonesian)
  • 106. Wiati, N. M., Zaman, M. Z., Kautsar, F., 2021. Analisis dan perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning, Journal of Industrial View, 3(2), 55-63. DOI: 10.26905/jiv.v3i2.6678 (in Indonesian)
  • 107. Wibawa, T., 2010. Perancangan stasiun kerja dengan pendekatan human cen-tered design (studi kasus pada industri kecil emping melinjo), Jurnal Optimasi Sistem Industri, 3(1), 30-38. (in Indonesian)
  • 108. Wicaksana, B. I. A., Nugroho, Y. J. D., 2017. Pendekatan antropometri dalam perancangan ulang stasiun kerja penyoletan guna mengurangi kelelahan fisik dan psikis karyawan akibat kerja, Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi, 6(1), 1689-1699. DOI: 10.31001/tekinfo.v6i1.387 (in Indonesian)
  • 109. Wijayanti, A. T., Nova, T. S., Suroso, H. C., 2021. Perancangan ulang tata letak fasilitas (re-layout) pada produksi kerupuk di UD. Sekar, Prosiding Seminar Nasional Teknologi Industri Berkelanjutan I (SENASTITAN I), Surabaya, Indonesia, 159-169. (in Indonesian)
  • 110. Yunanto, T. B. C., Donoriyanto, D. S., Tranggono, 2020. Rancangan tata letak fasilitas produksi menggunakan automated layout design program di perusahaan makanan, Juminten: Jurnal Manajemen Industri dan Teknologi, 1(3), 25-36. DOI: 10.33005/juminten.v1i3.79 (in Indonesian)
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2024).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-8af41345-23dd-4159-9b52-6c5551a369b6
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.