Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
Laslau Mare is a mature gas field in Transylvania Basin. The field exploitation began in 1975 and has been operated since then by Romgaz. In 2004 Romgaz entered into an Association agreement with Schlumberger to rehabilitate Laslau Mare field. Association’s main goals for project rehabilitation has been maximization of field potential by increasing gas production and reservoir ultimate recovery factor. The incremental production, defined as the additional gas volume obtained above a production baseline negotiated at project inception is the key objective of Association. According to Project Management Body of Knowledge (PMBOK®) framework from the Project Management Institute (PMI), the project management breaks in processes groups, knowledge area and professional and social responsibility all of them being integrated in a system approach. This paper examines key aspects of the project management system processes, adapted to the oil and gas industry and implemented in our project to meet and exceed project goals.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
577--586
Opis fizyczny
Bibliogr. 6 poz., rys., tab., wykr.
Bibliografia
- [1] Project Management Institute: A Guide to the Project Management Body of Knowledge. PMBOK® Guide.
- [2] SPM Governance Framework: SPM-QAS-GD-001.
- [3] SPM Standard Operating Practices: Management of Changes: IMP-SPM-QAS-SOP-010.
- [4] Badiru A.B., Osisanya S.O.: Project Management for the Oil and Gas Industry: A World System Approach. CRC Press, 2013. DOI: 10.1201/b13755.
- [5] SPM Facilities Engineering and Constructions Front end Engineering: SPM-FEC-SOP-001.
- [6] https://www.inloox.com/company/blog/articles/the-magic-triangle-and-devil-s-quadrangle-understanding-project-management-models/.
Uwagi
PL
Opracowanie ze środków MNiSW w ramach umowy 812/P-DUN/2016 na działalność upowszechniającą naukę (zadania 2017).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-8a93c343-8936-4520-9348-c4f03267ca62