Uma estrutura para categorização de riscos em projetos de trens de alta velocidade (TAV): o exemplo do primeiro TAV do Brasil
Języki publikacji
Abstrakty
High Speed Train projects are exposed to risks of different natures, such as: low participation of private companies in the new railways construction, lack of skilled labor, high technology not available in the internal market, high costs with land acquisition, among others. Such risks if not managed properly can become real problems and compromise the achievement of the project objectives. The risk identification is the process of collection and description of events that can have negative effects on the project. This process should consider the project uncertainty elements in order to generate specific results. In the case of HST projects, examples of uncertainty elements are: politics, economy, environment, human resources and technology. Therefore, this study aims to present a framework for categorizing risks to be used in HST projects. Also, for each category proposed some risk examples are suggested. An overview of the first Brazil HST project is showed and the risk framework is proposed. A discussion on the risks in the first Brazil HST project are presented followed by final conclusions.
Projetos de trens de Alta Velocidade estão expostos a riscos de diversas naturezas como: baixa participação de empresas privadas na construção de novas ferrovias, falta de mão de obra especializada, tecnologia de ponta não disponível no mercado interno, altos custos com aquisição de terrenos, alto impacto ambiental, entre outros. Tais riscos senão forem gerenciados corretamente podem se tornar problemas e comprometer os objetivos do projeto. A identificação de riscos é o processo de coleta e descrição de eventos que podem ter efeitos negativos sobre o projeto. Este processo deve considerar os elementos de incerteza do projeto, a fim de gerar resultados específicos. No caso de projetos de TAV, são exemplos de elementos de incerteza: política, economia, meio ambiente, recursos humanos e tecnologia. Portanto, este estudo tem como objetivo apresentar uma estrutura para classificar os riscos a ser usada em projetos de TAV. Para cada categoria de risco, exemplos de riscos são apresentados. Uma visão geral do primeiro projeto de TAV do Brasil e seus principais riscos são mostrados. Finalmente, tem-se uma discussão sobre os principais resultados do artigo e as conclusões finais.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
37--46
Opis fizyczny
Bibliogr. 12 poz., rys., tab.
Twórcy
autor
- Federal University of Santa Catarina, Rail Railway and Metro Engineering, 2700, Dr. João Colin Street, Joinville, Santa Catarina, Brazil
autor
- Federal University of Santa Catarina, Rail Railway and Metro Engineering, 2700, Dr. João Colin Street, Joinville, Santa Catarina, Brazil
autor
- Federal University of Santa Catarina, Rail Railway and Metro Engineering, 2700, Dr. João Colin Street, Joinville, Santa Catarina, Brazil
autor
- Federal University of Santa Catarina, Mechanical Engineering Department 476, Code Post. Trindade campus. Florianópolis, Santa Catarina, Brazil
Bibliografia
- 1. UIC, International Union of Railways. High Speed Railway System Implementation Handbook. UIC. 2012, 199 p.
- 2. Prince 2. Managing successful projects with PRINCE 2. London: Central Computers and Telecommunications Agency (CCTA). 2010.
- 3. Grubisic, V.V.F. Metodologia de Gerenciamento Integrado de riscos técnicos e gerenciais para o projeto de produtos. PhD thesis. Graduate Program in Mechanical Engineering. University Federal University of Santa Catarina. 2009 [Integrated management methodology of technical and managerial risks for product design. PhD thesis].
- 4. PMI, Project Management Institute. A guide to the project management body of knowledge (PMBOK®Guide). Pennsylvania: Project Management Institute. 2013.
- 5. NBR ISO 10006:2006. Sistemas de gestão da qualidade - Diretrizes para a gestão da qualidade em empreendimento. ABNT, Associação Brasileira de Normas Técnicas [Quality management systems - Guidelines for quality management in company. ABNT, Brazilian Association of Technical Standards].
- 6. Kerzner, H. Project management: a systems approach to planning, scheduling and controlling. London: John Wiley & Sons, Inc. 2009.
- 7. Smith, P.G. & Merritt, G.M. Proactive risk management. Controlling uncertainty in product development. New York: Productivity Press. 2002.
- 8. PMI, Project Management Institute. A guide to the project management body of knowledge (PMBOK®Guide). Pennsylvania: Project Management Institute. 2004.
- 9. Duijne, F.H.V & Aken, D.V. & Schouten, E.G. Considerations in developing complete and quantified methods for risk assessment. Safety Science. 2008. Vol. 46. P. 245-254.
- 10. ANTT. Agência Nacional de Transportes Terrestres. 2015. Available at: http://www.antt.gov.br.
- 11. Nakamoto, B.S. Planejamento e impasses na implementação do Trem de Alta Velocidade (TAV) entre Campinas/SP, São Paulo/SP e Rio de Janeiro/RJ. Dissertation. Faculty of Science and Technology, São Paulo State University, 2012 [Planning and impasses in the implementation of the High Speed Train (HST) between Campinas/SP, São Paulo/SP and Rio de Janeiro/RJ.Dissertation].
- 12. IPEA, Instituto de Pesquisa Econômica Aplicada. Texto para discussão. 2015. Available at: http://repositorio.ipea.gov.br/bitstream/11058/2397/1/TD_1920.pdf.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-873bd32a-9e01-4b3f-b111-b3ed05b9f8e4