Analiza czasowo-kosztowa strat produkcyjnych w wiązanym ciągu technologicznym robót
Konferencja
Konferencja Naukowo-Techniczna Inżynieria Przedsięwzięć Budowlanych (26-28.06.2014 ; Kraków, Polska)
Języki publikacji
Abstrakty
Production downtime results from the technological regime of production processes, established in production diagrams as network nodes. Their direct cause in the lack of harmonization between working teams, diversity of performance of hardware units – working in mixed systems, and different labor construction processes, performed on the same working plots. Time and costs analysis lies in optimizing the downtime of production resources using the “by-pass” production, which allows production labor (R) and hardware measures (S) for the implementation of part of the process. This tool is defined in network nodes, slowing down the production and binding the run of the production front with a two criteria network plan: technologically and organizationally. The technique is based on an algorithm of the limitations of renewable resources of means of production, which assumes the full availability of construction materials, available from storage sites. The paper presents an analysis of fixed and variable investments costs in terms of compensating for downtime.
Przestoje produkcyjne wynikają z reżimu technologicznego procesów produkcyjnych, utrwalonych w diagramach produkcyjnych w postaci węzłów sieciowych. Ich bezpośrednią przyczyną jest brak harmonizacji w pracy brygad roboczych, zróżnicowanie wydajności jednostek sprzętowych – pracujących w mieszanych układach – oraz odmienne pracochłonności procesów budowlanych, wykonywanych na tych samych działkach roboczych. Próba analizy czasowo-kosztowej polega na optymalizacji przestojów środków produkcji przy zastosowaniu by-passu produkcyjnego, który zezwala robociźnie produkcyjnej (R) i środkom sprzętowym (S) na realizację części procesu. Narzędzie definiowane jest w węzłach sieciowych, wyhamowujących produkcję, wiążących bieg frontu produkcyjnego przez plan sieciowy dwukryterialnie: technologicznie i organizacyjnie. Technika bazuje na algorytmie ograniczoności odnawialnych zasobów środków produkcji. Zakłada pełną dostępność surowców i materiałów budowlanych, dostępnych z placów składowych. W pracy przedstawiono analizę kosztów stałych i zmiennych inwestycji, pod kątem podatności na wyrównanie przestojów.
Czasopismo
Rocznik
Tom
Strony
233--240
Opis fizyczny
Bibliogr. 12 poz., wz.
Twórcy
autor
- Departament of Buildings Systems Engineering, Faculty of Civil Engineering, Opole University of Technology
autor
- Departament of Buildings Systems Engineering, Faculty of Civil Engineering, Opole University of Technology
Bibliografia
- [1] Biruk S., Jaśkowski P., Scheduling of a multiple object project with continuous execution of processes on working plots, Scientific Papers of the Higher Military Academy of Land Forces, Warszawa 2010, 114-116.
- [2] Bizon-Górecka J., Methods of risk management in construction, Publishing House of University of Technology and Agriculture, Bydgoszcz 1998, 38-39.
- [3] Chyliński P., Analysis of influence of organizational breaks on realization cost and time of building works with permutation flow problem features, Phd Thesis, Wrocław 2011, 19-32.
- [4] Iwanow A., Szkarowski A., Analysis of investment in construction and environmental engineering, Publishing House of University of Technology in Koszalin 2011, 193-194.
- [5] Jaworski K. M., Methodology of design as construction progresses, Scientific Publishing PWN, Warszawa 2009, 94.
- [6] Kasprowicz T., Engineering of construction project, Publishing House of the Institute for Technology of Exploitation, Warszawa 2002, 151-153.
- [7] Kietliński W., Janowska J., Woźniak C., Investment process in construction, Publishing House of Warsaw University of Technology, Warszawa 2007, 48-49.
- [8] Marcinkowski R., Methods for contractors distribution of resources in engineering and construction business, Publishing House W.A.T., Warszawa 2002, 128-130.
- [9] Marcinkowski R., Połoński M., Pruszyński K., Monitoring and control of time buffers in the mp-kp method, Publishing House: Naval and Geotechnical Engineering, conference publication, Gdańsk 2013, 376-378.
- [10] Mrozowicz J., Methods of building processes organization taking into account coupling of time, Lower Silesian Educational Publishers, Wrocław 1997, 12-13.
- [11] Przywara D., Modeling of time alignment of nodal buffers in two punctual CPM network using the by-pass technique, Publishing House: Naval and Geotechnical Engineering, conference publication, Gdańsk 2013, 388-392.
- [12] Stockes E., Akram S., Construction project management, Publishing House Poltex, Warszawa 2010, 51.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-7fb4482e-c725-4c51-b694-fdc068e53975