Identyfikatory
Warianty tytułu
Konferencja
7th International Conference System Safety: Human - Technical Facility - Environment, CzOTO 2018 (7 ; 12-14.12.2018 ; Zakopane, Poland)
Języki publikacji
Abstrakty
Identification and evaluation of risk in the production project in the preliminary phase of its realization has important influence on manager’s decision about the project continuation, the reduction of project realization or the stop of project realization. The method of the quantitative ex-ante risk estimation in the project is proposed in the paper. The aim of the paper is to blow the whistle on importance of the ex-ante identification and estimation of the risk in the production project, as the factor which has positive influence on the project realization and implementation. In the article the following thesis is proposed: the ex-ante identification and estimation of risk in the project contributes to its efficient realization and increase possibility of obtaining the originally defined results.
Słowa kluczowe
Wydawca
Rocznik
Tom
Strony
708--715
Opis fizyczny
Bibliogr. 29 poz., tab.
Twórcy
autor
- Cracow University of Economics, Poland
autor
- Cracow University of Economics, Poland
Bibliografia
- [1] A Guide to the Project Management Body of Knowledge 5th Edition., 2013. PMI, USA.
- [2] Bradley, K., 2002. Ken Bradley’s understanding PRINCE2. SPOCE Project Management Ltd., Poole, UK.
- [3] Filo, G., Lisowski, E., Domagala, M., Fabis-Domagala, J., Momeni, H., 2018. Modelling of pressure pulse generator with the use of a flow control valve and a fuzzy logic controller. MSM 2018: 14th Int. Conf. Mechatronic Systems and Materials, Zakopane, Poland, AIP Conf. Proc., 2029, art. 020015. DOI: 10.1063/1.5066477
- [4] Goroshko, A., Royzman, V., Pietraszek, J., 2014. Construction and practical application of hybrid statistically-determined models of multistage mechanical systems. Mechanika, 20, 489-493. DOI: 10.5755/j01.mech.20.5.8221
- [5] ISO IEC Guide 73:2002, Risk Management-Vocabulary-Guidelines for Use in Standards.
- [6] Kirschbaum, D.M., 2000. Calculated Risk, Good Surprise, Bad Surprise: The Law of Unintended Consequences. Community Risk Management and Insurance, Washington, USA
- [7] Kozien, E., 2017. Identification of stage phase growth in the checklist method using different statistical parameters. 20th International Scientific Conference on Economic and Social Development. Varazdin, Varazdin Development and Entrepreneurship Agency, 538-545.
- [8] Kozien, E., Kozien, M., 2017. Interval analysis as a method of measurement of uncertainity in the check-list method applied to identification of stage phase of companies. 26th International Scientific Conference on Economic and Social Development. Varazdin, Varazdin Development and Entrepreneurship Agency, 210-215.
- [9] Kozien, E., 2018a. Using the risk-list method for risk assessment in the project. 31st International Scientific Conference on Economic and Social Development. Varazdin, Varazdin Development and Entrepreneurship Agency, 152-158.
- [10] Kozien, E., 2018b. Quality of project financed by the European Union structural fund. 12th Int. Conf. “Quality Production Improvement” QPI 2018. MATEC Web of Conferences, 183, art. 04006. DOI: 10.1051/matecconf/201818304006
- [11] Kozien, E., Kozien, M., 2018. Using the fuzzy logic description for the ex-ante risk assessment in the project. 35th International Scientific Conference on Economic and Social Development. Varazdin, Varazdin Development and Entrepreneurship Agency, 224-231.
- [12] Krawczyk, J., Sobczyk, A., Stryczek, J., Walczak, P., 2018. Tests of New Methods of Manufacturing Elements for Water Hydraulics. Mater. Res. Proc., 5, 200-205. DOI: 10.21741/9781945291814-35
- [13] , E., Filo, G., 2017. Analysis of a proportional control valve flow coefficient with the usage of a CFD method. Flow Meas. Instrum. 53, 269-278. DOI: 10.1016/j.flowmeasinst.2016.12.009
- [14] Maszke, A., Dwornicka, R., Ulewicz, R., 2018, Problems in the implementation of the lean concept at a steel works – Case study. MATEC Web Conf., 183, art. 01014. DOI: 10.1051/matecconf/201818301014
- [15] Osocha, P., Duda, P., Weglowski, B., 2004. Determining temperature and stress changes in thick-walled elements of steam lines. Inz. Chem. Procesowa 25, 2249- 2256.
- [16] Osocha, P., 2018. Calculation of Residual Life for P91 Material Based on Creep Rate and Time to Rupture. Mater. Res. Proc. 5, 177-182. DOI: 10.21741/9781945291814-31
- [17] Pietraszek, J., Dwornicka, R., Krawczyk, M., Kołomycki, M., 2017. The nonparametric approach to the quantification of the uncertainty in the design of experiments modelling. UNCECOMP 2017, NTU of Athens, 598-604. DOI: 10.7712/120217.5395.17225
- [18] Pritchard, C.L., 2001. Risk management. Concepts and guidance. ESI International, Virginia, USA.
- [19] Project Management Institute homepage. http://www.pmi.org [access date: 10.11.2018] Radzyminska-Lenarcik, E., Ulewicz, M., 2014. The use of 1-alkylimidzoles for selective separation of zinc ions in the transport process across a polymeric inclusion membrane. Physicochem. Probl. Mi. 50, 131-142. DOI: 10.5277/ppmp140112
- [20] Radzyminska-Lenarcik, E., Ulewicz, R., Ulewicz, M., 2018. Zinc recovery from model and waste solutions using polymer inclusion membranes (PIMs) with 1-octyl-4- methylimidazole. Desalination and Water Treatment, 102, 211-219. DOI: 10.5004/dwt.2018.21826
- [21] Sefton T., Byford S., McDaid D., Hills J., Knapp M., 2002. Making the most of it. Economic evaluation in the social welfare field, Joseph Rowntree Foundation, New York, USA.
- [22] Sanders, J.R. (chair), 1994. The program evaluation standards: how to assess evaluation educational programs. Sage Publications, Thousand Oaks, California, USA.
- [23] Skrzypczak-Pietraszek, E., Piska, K., Pietraszek, J., 2018. Enhanced production of the pharmaceutically important polyphenolic compounds in Vitex agnus castus L. shoot cultures by precursor feeding strategy. Eng. Life Sci., 18, 287-297. DOI: 10.1002/elsc.201800003
- [24] Ulewicz, M., Lesinska, U., Bochenska, M., 2010. Transport of lead across polymer inclusion membrane with p-tert-butylcalix[4]arene derivative. Physicochem. Probl. Miner. Process., 44(1), 245–256.
- [25] Ulewicz, R., Selejdak, J., Borkowski, S., Jagusiak-Kocik, M., 2013. Process management in the cast iron foundry. METAL 2013: 22nd Int. Conf. Metallurgy and Materials, Ostrava, Tanger, 1926-1931.
- [26] Urban G.L., Hauser J.R., 1993. Design and Marketing of New Products, Prentice Hall, Englewood Cliffs, New Jersey, USA.
- [27] Wirkus, M., Roszkowski, H., Dostatni, E., Gierulski, W., 2014. Zarządzanie projektem. Polskie Wydawnictwo Ekonomiczne, Warszawa [in Polish].
- [28] Wlodarczyk, R., Dudek, A., Nitkiewicz, Z., 2011. Corrosion analysis of sintered material used for low-temperature fuel cell plates. Arch. Metall. Mater. 56, 181-186. DOI: 10.2478/v10172-011-0021-0
- [29] Żurek, B., 1999. Risk management with application of assisted software RMS. Proc. 1 st Conference “Project Management – Experiences and Methods”, Gdańsk, Poland.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2020).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-7f9553fb-3df0-4f56-82af-a0bec2244455