PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Utilization of Morrison Mine experience in management and mitigation of micro-seismic risk at the design stage of the Victoria Project

Identyfikatory
Warianty tytułu
PL
Wykorzystanie doświadczeń Kopalni Morrison w zarządzaniu i minimalizowaniu zagrożenia mikrosejsmicznego na etapie projektowania Kopalni Victoria
Języki publikacji
EN
Abstrakty
EN
Owned by KGHM International Ltd (KGHM), the Victoria Project is an undeveloped copper-nickel resource located in the Sudbury Igneous Complex. This region has been historically mined for over 110 years for its sulphide nickel, copper, cobalt, and precious metal ores. Due to the anticipated high stress environment, stiff rock mass and significant depth of the resource (>1800 m below surface), severe mining-induced micro-seismicity, strain bursting and stress induced damage is expected. In order to manage hazard and mitigate the associated risk to personnel and production associated with this mining in this environment, appropriate geomechanics strategies will applied at the design stage of the Victoria Project (including micro-seismic monitoring, dynamic ground control systems, re-entry protocols, production extraction sequencing, and strategic location of LOM and development excavations). This paper describes the expected benefit to the Victoria Project by applying lessons learned from comparable mines currently operating within the Sudbury Basin, including KGHM’s Morrison Mine which seismically-active and developing strategies to manage micro-seismic risk.
PL
Projekt Victoria, będący własnością spółki KGHM, jest to aktywo górnicze rozwijane na bazie złoża miedziowo-niklowego wykształconego w obrębie kompleksu skał magmowych Sudbury. Region ten jest przedmiotem historycznej eksploatacji od ponad 110 lat z uwagi na bogate mineralizacje zawierające nikiel, miedź, kobalt oraz metale szlachetne. Z powodu oczekiwanych wysokich stanów naprężeniowych, mocnych skał oraz znacznych głębokości zalegania zasobów (przekraczającej 1800 m), w przypadku Projektu Victoria należy się spodziewać występowania indukowanych zjawisk sejsmicznych, odprężeń oraz zniszczenia górotworu. W celu zarządzania ryzykiem, a także minimalizacji jego wpływu na bezpieczeństwo pracującej załogi oraz osiągane wyniki produkcyjne, odpowiednie metody monitoringu i prewencji muszą być przewidziane już na etapie projektowania przyszłej kopalni (włączając w to monitoring aktywności sejsmicznej górotworu, obudowę podatną, protokoły dotyczące czasu wyczekiwania, właściwą sekwencję wybierania złoża oraz właściwą lokalizację wyrobisk o znaczeniu kapitalnym). W niniejszym artykule opisano szereg spodziewanych korzyści płynących z wykorzystania doświadczenia innych kopalń prowadzących eksploatację w Zagłębiu Sudbury, włączając w to należącą do KGHM kopalnię Morrison.
Rocznik
Tom
Strony
27--40
Opis fizyczny
Bibliogr. 14 poz., rys., wykr., tab.
Twórcy
  • KGHM InternationalLtd, Victoria Project, Sudbury, Canada
autor
  • KGHM International Ltd, Morrison Mine/Craig Mine, Onaping, Canada
autor
  • KGHM International Ltd., Blaine, USA
Bibliografia
  • [1] Andrieux, P. P., Brummer, R. K., H., Li, O’Connor, C. P., 2009, Elastic versus Inelastic Numerical Modelling of Deep and Highly Stressed Mining Fronts. Deep Mining Conference, Perth.
  • [2] Cochrane, L., 1991, Analysis of the Structural and Techtonic Environments Associated with Rock Mass Failures in the Mines of the Sudbury District. Ph.D. Thesis, Queen’s University.
  • [3] Coulson, A., 1996, Mine Induced Seismicity in Highly Stressed Ground: Case study – Creighton Mine Inco Ltd., Sudbury. M.Sc. Thesis, Queen’s University, Kingston.
  • [4] Hoek, E., Carter, T.G., Diederichs, M.S., 2013, Quantification of the geological strength index chart. 47th US Rock Mechanics Geomechanics Symposium, San Francisco, June Lightfoot, P.C. & Farrow, C.E.G. (2002). Geology, geochemistry and mineralogy of the Worthington Offset dike: towards a genetic model for Offset mineralization in the Sudbury Igneous Complex. Economic Geology, 97: 1419-1446.
  • [5] ITASCA, 2013, FLAC 3D User’s Guide. ITASCA Consulting Group Inc.
  • [6] Kaiser, P. K., McCreath, D. R., & Tannant, D. D., 1996, Canadian Rockburst Support Handbook. Geomechanics Research Centre.
  • [7] Li, C. & Hakansson, U., 1999, Performance of the Swellex bolt in hard and soft rocks. Rock Support and Reinforcement Practice in Mining, Villaescusa, Windsor & Thompson (eds), Balkema, Ratterdam ISBN 90 5809 045 0.
  • [8] Malek F. & Leslie I., 2006, Golden Rocks 2006, The 41st U.S. Symposium on Rock Mechanics (USRMS), 17-21 June, Golden, Colorado, p 10.
  • [9] MDE, 2014, Risk Mitigation for Mining in Burst-Prone Ground at Morrison Mine, Sudbury. Technical Report prepared by Mine Design Engineering Ltd for KGHM International Ltd.
  • [10] Mine Design Enginerering, 2014, Risk Mitigation for Mining in Burst-Prone Ground at Morrison Mine, Sudbury.
  • [11] Read, J, and Stacey, P., 2009, Guidelines for open pit slope design. Collingwood, Vic, Melbourne: CSIRO Publishing.
  • [12] Trifu, C. & Suorineni, F., 2009, Use of Microseismic Monitoring for Rock burst Management at Vale Inco Mines. In: Controlling Seismic Hazard and Sustainable Development of Deep Mines, C. Tang (ed.), 1105-1114.
  • [13] Vakili, A., Albrecht, J., and Sandy, M., 2014, Rock Strength Anisotropy and Its Importance in Underground Geotechnical Design. AUSROCK 2014: Third Australasian Ground Control in Mining Conference / Sydney, NSW, 5–6 November.
  • [14] Watson, J. M., Vakili, A., & Jakubowski, M., 2015, Rock Strength Anisotropy in High Stress Conditions: A Case Study for Application to Shaft Stability Assessments. Studia Geotechnica et Mechanica, 37(1), 115-125.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-7d9d77f7-fe5c-4371-842f-97fa6e7dea8a
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.