Metodologia identyfikacji przyczyn powstawania następstw wad w budownictwie kubaturowym
Konferencja
Konferencja Naukowo-Techniczna Inżynieria Przedsięwzięć Budowlanych (26-28.06.2014 ; Kraków, Polska)
Języki publikacji
Abstrakty
To rationally prevent defects, you must first have knowledge of the defects, their causes and the associated costs. A key objective of the research presented is to attempt to demonstrate the application of various methods used in production engineering, in the context of today’s economy requirements and transfer knowledge gained from previously completed projects, with the aim of increasing the quality multifamily housing. A study of faults and subcontractors was carried out for the period 2006/2013. Eight construction projects with a total usable area of approximately 117,000.0 square meters and 1,524 apartments were studied. This is one of the first studies, for this period, carried out based on multifamily building projects in Poland.
Aby wykonać racjonalną profilaktykę wad, trzeba mieć wiedzę na temat usterek, ich przyczyn i związanych z tym kosztów. Kluczowym celem badań prezentowanych jest podjęcie próby wykazania zastosowania różnych metod stosowanych w inżynierii produkcji w kontekście współczesnych wymagań gospodarki oraz przekazanie wiedzy zebranej z zrealizowanych projektów powodującej wzrost jakości w budownictwie wielorodzinnym. Badanie występujących usterek oraz podwykonawców przeprowadzono za okres 2006/2013. Przebadano osiem projektów budowlanych o łącznej powierzchni użytkowej ok 117.000,0 m2 i 1524 mieszkań. Jest to jedno z pierwszych przeprowadzonych badań w tym okresie dla budynków wielorodzinnych w Polsce.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
183--193
Opis fizyczny
Bibliogr. 10 poz., tab., wz., wykr.
Twórcy
autor
- Institute of Structural Engineering, Faculty of Civil and Environmental Engineering, Poznań University of Technology
autor
- Institute of Structural Engineering, Faculty of Civil and Environmental Engineering, Poznań University of Technology
Bibliografia
- [1] Josephson P., Hammarlund Y., The causes and costs of defects in construction A study of seven building projects, Autom. Constr., 1999, 681-687.
- [2] Rao S.S., Raghunathan T.S., Solis L.E., A comparative study of quality practices and results in India, China and Mexico, J. Qual. Manag., Vol. 2, No. 2, Jan. 1997, 235-250.
- [3] Chen Y., Kamara J.M., A framework for using mobile computing for information management on construction sites, Autom. Constr., Vol. 20, No. 7, Nov. 2011, 776-788.
- [4] Josephson P., Hammarlund Y., Park C.-S., Lee D.-Y., Kwon O.-S., Wang X., A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template, Autom. Constr., Vol. 33, Aug. 2013, 61-71.
- [5] Zou P.X W., Zhang G., Wang J., Understanding the key risks in construction projects in China, Int. J. Proj. Manag., Vol. 25, No. 6, Aug. 2007, 601-614.
- [6] Kaklauskas A., Tupenaite L., Kanapeckiene L., Naimaviciene J., Knowledge-Based Model for Standard Housing Renovation, Procedia Eng., Vol. 57, Jan. 2013, 497-503.
- [7] Mroczko F., Zarządzanie jakością, Wałbrzyska Wyższa Szkoła Zarządzania i Przedsiębiorczości, Wałbrzych 2011, 1-224.
- [8] Wawak S., Zarządzanie jakością – podstawy, systemy i narzędzia, One Press, 2011, 163-178.
- [9] Wrona A., Wrona M., Zastosowanie wybranych narzędzi six sigma w procesach technologicznych, Vol. 4, 2010, 532-540.
- [10] Paprocki M., Zastosowanie wskaźników metodologii Six Sigma do symulacji i przeprowadzenia eksperymentu współbieżnego rozwoju wyrobów w fazie przygotowania produkcji, Uniwersytet Ekonomiczny w Krakowie, Kraków 2012, 1-16.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-7c573976-5a60-4f22-bb5f-f3674300141d