PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Approaches to the production flow scheduling and control

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
In the paper different methods of production order scheduling and control that are elaborated by the author and the team are presented. The history starts from the dispatching rules and goes to the distributed control by the local dispatching rule allocation and application them in the software (KbRS, SWZ, etc). In the next stage of the paper the discussion goes to the integration of these approaches. Last stage of the paper the artificial intelligence (Immune Algorithm) application for optimization of the schedule under the condition that any permissible solution is attainable is proposed. This application is only the part of the integrated system and is utilized as a tool for the solution improvement.
Rocznik
Strony
5--13
Opis fizyczny
Bibliogr. 7 poz., rys.
Twórcy
autor
  • Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Silesian University of Technology
Bibliografia
  • [1] COCHRAN, J.K. et al., A multi population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers & Operational research, Vol. 30, 2003, 1097-1102.
  • [2] KALINOWSKI K., The production flow control in presence of disturbances with use of an expert system, PhD thesis, Silesian University of technology, Gliwice, Poland, 2002 (in Polish).
  • [3] KRENCZYK D., Synchronisation Algorithms of Multiassortment repetitive production flow, PhD thesis, Silesian University of technology, Gliwice, Poland (in Polish).
  • [4] KRENCZYK D., KALINOWSKI K., SKOLUD B., Transition scheduling for multiassortment repetitive production, Automatyka 2006/144, 33-38.
  • [5] MANUFUTURE PLATFORM, Strategic research agenda „Assuring the future of manufacturing in Europe June 2006.
  • [6] SKOLUD B., Planning of the multiassortment repetitive production, Mechanika 136, Gliwice 2000, 203 (in Polish).
  • [7] WOSlK I., An immune approach to the open job shop scheduling problem with linear constrains. 4th International PhD Conference on Mechanical Engineering, Pilsen, 2006.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-76efe6ca-751d-4297-9801-f4676499e72f
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.