PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!
Tytuł artykułu

Analysis of Inhibiting Factors in Shipyards in Clusterizing Shipyards on the Northern Coast of Aceh Indonesia Using the Fuzzy AHP Method – A Preliminary Study

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The fishing shipyard in Banda Aceh City is a privately owned shipyard and is managed in a family manner. The shipyard here is active in carrying out maintenance, repair and construction of new ships when there is demand from consumers. The shipyards in Banda Aceh City generally make ships made of wood. The problem that is currently being faced is that there are many abandoned ships due to lack of finance, natural resources, human resources and environment, this is an obstacle to the progress and development of shipyards. The purpose of this study was to determine the inhibiting factors that exist in shipyards in the city of Banda Aceh and find alternative solutions to these problems. The method used in this study was a survey method used to look at existing symptoms and collect data on the factors related to research variables and then analyzed using the Fuzzy AHP method. The results of this study indicate that the financial inhibiting factor is the most influential factor in shipyards with a resulting value of 0.4635, the inhibiting factor of Natural Resources is worth 0.35675, the inhibiting factor of Human Resources is worth 0.2865 and the inhibiting factor from the environment is the inhibiting factor which is the lowest or less influential with a value of 0.14325. The alternative solutions to financial problems are capital loans and investments.An alternative for natural resources is the addition of a minimum stock to anticipate stock scarcity and delays in the delivery of materials and tools. The alternative for human resources is the existence of an office, organizational structure, and division of tasks as well as raising awareness of occupational health and safety.As for the alternatives for the environment, namely the need for buildings or installation of tarpaulins for the areas where ships are built, good land management and studies of other natural impacts.
Twórcy
autor
  • Department of Capture Fisheries, Faculty of Marine and Fisheries, Universitas Syiah Kuala (USK), Jl. Syech Abdurrauf No. 7, Darussalam, Banda Aceh, 23111, Indonesia
  • Department of Capture Fisheries, Faculty of Marine and Fisheries, Universitas Syiah Kuala (USK), Jl. Syech Abdurrauf No. 7, Darussalam, Banda Aceh, 23111, Indonesia
  • Department of Capture Fisheries, Faculty of Marine and Fisheries, Universitas Syiah Kuala (USK), Jl. Syech Abdurrauf No. 7, Darussalam, Banda Aceh, 23111, Indonesia
  • Department of Fisheries, Faculty of Fisheries and Marine Sciences, Teuku Umar University, Meulaboh, West Aceh, Indonesia
  • Department of Mechanical Engineering, Faculty of Engineering, Abulyatama University, Aceh Besar, Indonesia
  • Department of Mechanical Engineering, Faculty of Engineering, Universitas Syiah Kuala (USK), Jl. Syeh Abdurrauf No. 7, Darussalam, Banda Aceh, 23111, Indonesia
Bibliografia
  • 1. Farhum S.A., Paradhita L., Ihsan Y. N. 2020. Utilization of Vessel Multi Aid (VMA) as a smart fishing technology for small scale fisheries.Iop Conf. Ser. Earth Environ. Sci., 564(1), 012081.
  • 2. Demirel H., Balin A., Celik E., Alarçin F. 2018. A fuzzy AHP and electre method for selecting stabilizing device in ship industry. Brodogradnja, 69, 61–77.
  • 3. Cebi S., Akyüz E., Sahin Y. 2017. Developing web based decision support system for evaluation occupational risks at shipyards, Brodogradnja, 68(1), 17–30.
  • 4. Rizwan T., Husaini H., Husin H., Akhyar A., Jalil Z. 2023. Identification shipyard model suitable for kutaraja fishing port in Aceh, Indonesia. Pol. J. Environ. Stud., 32(2), 1755–1766.
  • 5. Putra R.D., KotoJ. 2015. Production process of traditional ship inBintan-Indonesia. Journal of Ocean, Mechanical and Aerosace, 21, 7–11.
  • 6. Kambase N.N. 2020. Ship maintenance and repair services in the tema drydock and shipbuilding yard in Ghana: some challenges, opportunities and prospects. World J. Eng. Technol., 8(3), 296–316.
  • 7. Rizwan R., Setiawan I., Rahimi S.A.E., Dewiyanti I., Purnama N.R., Arif M. 2017. Desain dan studi ekonstruksi kapal purse seine bermaterial kayu di Pelabuhan Perikanan Samudera (PPS) Lampulo. Pros. Semin. Nas. USM, 1(1), 91–99.
  • 8. Syahputra F., Nataya A.H., Mukhlis M., Naufal A., Hayati N., Thaib A., Nazlia S., Handayani L. 2022. Identifikasi kebutuhan bahan material untuk pembuatan kapal kayu tradisional diKampung Jawa, Kota Banda Aceh. Mahseer J. Ilmu-Ilmu Perair. Dan Perikan., 4(2), 15–21.
  • 9. Rizwan T., Ayana R., Muchlis Y., Aprilla R.M., Chaliluddin M.A., Muhammad M., Affan J.M., Amir F. 2020. Studi Klasterisasi industri galangan kapal kayu berdasarkan ukuran kapal perikanan di Banda Aceh dan Aceh Besar dengan menggunakan Metode Analytical Hierarchy Process (AHP).Depik, 9(2), 356–354.
  • 10. Tukan M., Camerling B., Afifudin M.T., Hozairi H. 2019. Analisa kelayakan wilayah untuk pembangunan floating dock sebagai dok alternatif di Kepulauan Maluku menggunakan Fahp-Topsis.Njca Nusant. J. Comput. Its Appl., 4, 116.
  • 11. Septifani R., Santoso I., Pahlevi Z. 2018. Analisisrisikoproduksifrestea menggunakan Fuzzy Failure Mode and Effect Analysis (Fuzzy FMEA) dan Fuzzy Analytical Hierarchy Process (Fuzzy AHP) (Studi Kasus Di PT. Coca-Cola Bottling Indonesia Bandung Plant).Proc. Natl. Colloq. Res. Community Serv., 2, 13–21
  • 12. Suciadi Y. 2013. Pemilihan dan evaluasi pemasok pada P.T. New Hope Jawa Timur dengan menggunakan metode Fuzzy Analytic Hierarchy Process.Calyptra, 2(1), 1–17.
  • 13. Reschiwati, Effrida, Ibrahim I.M. 2021. The role of financial performance of indonesia’s banking firms in influencing the rate of stock return. International Journal of Latest Engineering and Management Research (IJLEMR), 6(3), 20–32.
  • 14. Sihaloho T., Muna N. 2010. Kajian dampak ekonomi pembentukan kawasan ekonomi khusus.Bul. Ilm. Litbang Perdagang., 4(1), 75–101.
  • 15. Mishra P., Mishra P., Purohit R. 2018. Material Delivery Problems In Construction Projects: A Possible Solution.mater. today proc., 5(2), 6497–6501.
  • 16. Rizwan T., Hikmah D., Muhammad M., Chaliluddin M.A., Akhyar A.,Thaib R. 2022. A study on the development of a fishing shipyard in peukan bada district, Aceh Besar using fishbone analysis: a short comunnication. Depik, 11(2), 246–251.
  • 17. F.A. Ekoanindiyo and Y.A. Wedana.2012. Perencanaan tata letak gudang penggunakan metode shared storage di pabrik plastik Kota Semarang. Din. Tek. Ind., 6(1),46–56.
  • 18. Y.R.M.B. Sitompul and V.P.A. Simarmata. 2022. Description of work accident and occupational safety and health activities of paint manufacturing industry PTSU, In West Java 2016–2017.Int. J.Health Sci. Res., 12 (8), 280–289.19. A.A.A. Dharma. 2013. Perencanaan jaringan kerja pada erection block kapal untuk meningkatkan efisiensi waktu pembuatan (studi kasus di PT. Dok dan Perkapalan Surabaya),J. Tek. Mesin, 1(2), 42–51.
  • 20. T. Rizwan, Z. Jalil, A. Akhyar, and H. Husaini. 2021. Oceanographic Factors as the indicators for shipyard industry development in Kutaraja Fishing Port: a preliminary study. J. Ecol. Eng., 22(9), 237–245.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-71eb2e99-ae97-489c-85b2-56524e900ba4
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.