PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Analysis of the quality problems during production process of the stud frame of the stretching station

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The stud frame of stretching station WSH 400/15 was the main subject of the researches presented in this paper. The aim of the article was the quality analysis of the stud frame during its production process. Construction and scheme of production process of stud frame was presented. Analysis of main areas which generate incompatibilities of researched element was made. Proposals of process improvement with the help of relation diagram and affinity diagram were presented.
Rocznik
Strony
2--5
Opis fizyczny
Bibliogr. 9 poz., rys., tab.
Twórcy
autor
  • Institute of Production Engineering, Faculty of Management, Czestochowa University of Technology, Armii Krajowej 19B, 42-201 Czestochowa, Poland
Bibliografia
  • 1. Miner guide, Vol. 5. Pub. Śląsk, Katowice 1976 (in Polish).
  • 2. Installation and operation instruction of the stretching station. WSN – 400/15 (in Polish).
  • 3. Ulewicz R., Borkowski S. 2008. Production management. Production systems. Pub. Humanitas, Sosnowiec (in Polish).
  • 4. Kardas E. 2012. Quality analysis of pig iron produced in one of Polish steelworks. In: Materials Science Forum, vol. 706-709, p. 2146-2151.
  • 5. Borkowski S., Čorejowá T. 2004. Instruments of management problem solving. Pub. Wyższej Szkoły Zarządzania i Marketingu, Sosnowiec (in Polish).
  • 6. Konstanciak M., Jagusiak M. 2011. Improvement of the Production of the Hard-Drawn Wire, In: Improvement of Production Processes. Monography. Ed. Stanisław Borkowski, Marek Krynke. Publish. TRIPSOFT, Trnava, p. 60-71.
  • 7. Lestyánszka Škůrková K., Šesták M. 2009. The capability of turning process by screws production, In: Production engineering. Novosibirsk State Technical University, p. 49-56.
  • 8. Piekara A., Dziuba S.T., Kopeć B. 2012. The use of ishikawa diagram as means of improving the quality of hydraulic nipple. chapter 15. [In:] Toyotarity. Quality and machines operating conditions, Monograph. Ed. S. Borkowski, J. Selejdak, Oficyna Wydawnicza Stowarzyszenia Menedzerów Jakości i Produkcji and Faculty of Logistics, University of Maribor, Celje 2012, p. 162-175.
  • 9. Sygut P. 2013. Process of quality improvement in the company producing building materials. Production Engineering Archives, 1/2013, p. 16-18.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-67fccea4-54f2-435f-9fdb-6d6084fc7c0e
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.