PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Solving a stochastic time-cost-quality trade-off problemby meta-heuristic optimization algorithms

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Actual time, cost, and quality of execution options for various activities within a considered project cannot be certainly determined prior to construction, there could be three different values of time and cost for each execution option, namely, optimistic value, most likely or normal value, and pessimistic value; and the quality could be described in linguistic terms.The objective of this research is to optimize time, cost, and quality of construction projects under uncertainty utilizing the program evaluation and review technique. In this study, multi-objective functions are used to decrease total project time and total project cost whilemaximizing overall project quality. For satisfying time-cost-quality trade-off optimization, a multi-objective optimization strategy is required. The non-dominating sorting-II conceptand the crowding distance computation mechanism are combined with the teaching learning-based optimization algorithm to optimize time-cost-quality optimization problems. Non-dominating sorting-II teaching learning-based optimization algorithm is coded in MATLAB to optimize the trade-off between time, cost, and quality optimization problems. In the proposed model, the non-dominating sorting-II approach and crowding distance computationmechanism are responsible for handling objectives effectively and efficiently. Teaching learning-based optimization algorithm’s teacher and learner phases ensure that the searched solution space is explored and exploited. The proposed algorithm is applied to a 13-activity example problem, and the results show that it provides satisfactory results.
Rocznik
Tom
Strony
41--48
Opis fizyczny
Biblogr. 10 poz., rys., tab.
Twórcy
  • Karadeniz Technical University, Turkey
autor
  • Karadeniz Technical University, Turkey
  • Czestochowa University of Technology, Poland
Bibliografia
  • 1.Chinneck, J.W. (2009) Operations research and cyber-infrastructure. Tailoring classifier hyperplanesto general metrics. Springer, 365-387.
  • 2.El Bassuony, M. (2016) Time-cost-quality trade-off analysis for construction projects. Master thesis. School of Sciences and Engineering, American University in Cairo.
  • 3.El-Rayes, K. & Kandil, A. (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), 477-486.
  • 4.Hegazy, T. (2002) Computer-Based Construction Project Management. Ontario, Prentice Hall.
  • 5.Hinze, J. (2004) Construction planning and scheduling, New York, Pearson/Prentice Hall.
  • 6.Patre, A.D. & Ugale, A.B. (2020) Indirect cost in construction project. Aegaeum Journal, 8(5),925-928.
  • 7.Rao, R.V., Savsani, V.J. & Vakharia, D.P. (2011) Teaching-learning-based optimization: a novelmethod for constrained mechanical design optimization problems. Computer-Aided Design, 43(3),303-315.
  • 8.Rao, R.V., Savsani, V.J. & Vakharia, D.P. (2012) Teaching-learning-based optimization: an optimiza-tion method for continuous non-linear large scale problems. Information Sciences, 183(1), 1-15.
  • 9.Vishnu, V., Achu, V., Riyana, M.S. & Jayakrishnan, R. (2018) Time-cost-risk optimization in con-struction work by using ant colony algorithm. International Research Journal of Engineering andTechnology, 5(4), 2298-23.
  • 10.Zhang, H. & Xing, F. (2010) Fuzzy-multi-objective particle swarm optimization for time-cost-qualitytradeoff in construction. Automation in Construction, 19, 1067-1075.
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2022-2023).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-652d1858-9cb9-4ec3-953e-d3beec97830a
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.