PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Concept of using the BIM technology to support the defect management process

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Koncepcja wykorzystania technologii BIM do wspomagania procesu zarządzania usterkami
Języki publikacji
EN
Abstrakty
EN
Hundreds or even thousands of defects can be found during the building acceptance, hence the need for solutions which will facilitate the defect management, including identification, costing and repair. The aim of the paper is to present the possible use of BIM to support the defect management process during the acceptance of apartments in multifamily residential buildings. The paper presents a concept of quality control support application called MWBIM (Map of Knowledge BIM) which will collect data about discovered construction defects, their recording and servicing with the BIM technology. MWBIM will run based on Building Information Modelling (BIM), Augmented Reality (AR), Case-Based Reasoning (CBR) and maps of knowledge. There are three phases in the operation of the application: preparatory phase (planning the order of acceptance meetings and elements to be checked), acceptance phase (data collection and assigning them to the building information model) and the reporting phase (reports generation, assigning defects to contractors, follow-up of repair status). The intended uses of the application are mainly personnel involved in the acceptance of apartments.
PL
Jednym z etapów cyklu życia budynku jest jego budowa, której zwieńczeniem jest odbiór. Podczas odbioru budynków może być wykryte setki, a nawet tysiące usterek budowlanych, dlatego powstała potrzeba opracowania rozwiązań, które ułatwią zarządzanie nimi, w tym identyfikację, wycenę i naprawę. Celem artykułu jest prezentacja możliwości wykorzystania technologii BIM do wspomagania procesu zarządzania usterkami na etapie odbioru lokali mieszkalnych w wielorodzinnych budynkach mieszkalnych. Celem badań naukowych autora jest opracowanie aplikacji wspomagającej kontrolę jakości wykonanych robót budowlanych, która ma służyć zbieraniu danych o wykrytych usterkach budowlanych, ich rejestracji i obsłudze za pomocą technologii BIM. MWBIM będzie działać w oparciu o modelowanie informacji o budynku (BIM - Building Information Modeling), rozszerzoną rzeczywistość (AR - Augmented Reality), wnioskowanie z przypadków (CBR - Case-Based Reasoning) oraz mapy wiedzy. Nieodłącznym elementem aplikacji MWBIM jest baza danych, w której są zbierane wszystkie dane ze spotkań odbiorowych lokali mieszkalnych, zarówno bieżących jak i odbytych wcześniej. W bazie będą zapisane informacje dotyczące odebranych mieszkań (lokalizacja, piętro, kształt, powierzchnia mieszkania i pokoi, liczba pokoi, funkcjonalność pokoi, liczba okien i drzwi, obecność ogródka/loggi/tarasu/balkonu, itp.) oraz usterek budowlanych, które zostały w nich wykryte (lokalizacja, typ, istotność, koszt i czas naprawy). MWBIM będzie składać się z kilku modułów powiązanych z trzema fazami inspekcji: fazy przygotowania, odbioru i raportowania.
Twórcy
  • Cracow University of Technology, Faculty of Civil Engineering, Division of Management in Civil Engineering (L-7), Cracow, Poland
Bibliografia
  • [1] E. Plebankiewicz, K. Zima, J. Malara, S. Biel, "A procedure of repairing housing defects in development investments", MATEC Web of Conferences 262: 07010, 2019. https://doi.org/10.1051/matecconf/201926207010
  • [2] C. Eastman, "The Use of Computers Instead of Drawings in Building Design", AIA Journal 63: 46-50, 1975.
  • [3] R. Aish, "Building modelling the key to integrated construction CAD", Guildhall, Bath, 1986.
  • [4] G.A. van Nederveen, F.P. Tolman, "Modelling multiple views on buildings", Automation in Construction 1: 215-224, 1992.
  • [5] J. Laiserin, "The BIM page", Laiserin Letter: 2003.
  • [6] J. Laiserin, "Comparing Pommes and Naranjas", Laiserin Letter: 2002.
  • [7] Z. Liu, Y. Lu, L.C. Peh, "A review and scientometric analysis of Global Building Information Modeling (BIM) Research in the Architecture, Engineering and Construction (AEC) industry", Buildings 9: 2019. https://doi.org/10.3390/buildings9100210
  • [8] O. Kapliński, "Innovative solutions in construction industry. Review of 2016-2018 events and trends.", Engineering Structures and Technologies: 2018. https://doi.org/10.3846/est.2018.1469
  • [9] M. Abel, "Przygotowanie do projektowania infrastruktury w BIM - cz. I", Inżynier Budownictwa 9: 76-79, 2015.
  • [10] BuildingSmart Polska [on-line] https://buildingsmart.org.pl/.
  • [11] A. Tomana, "BIM innowacyjna technologia w budownictwie: podstawy, standardy, narzędzia", Wydawnictwo Witold Sadecki Seiton, Kraków, 2015.
  • [12] T. Davenport, L. Prusak, "Working Knowledge: How Organizations Manage What They Know", Harvard Business School Press, Boston, 1998.
  • [13] A. Baborski, "Efektywne zarządzanie a sztuczna inteligencja", Akademia Ekonomiczna im. Oskara Langego Wrocław, 1994.
  • [14] D. Jemielniak, A. Koźmiński, "Zarządzanie wiedzą", Wolters Kluwer, Warszawa, 2011.
  • [15] W. M. Grudzewski, I. Hejduk, "Zarządzanie wiedzą w przedsiębiorstwach", Wydaw. Difin S.A., Warszawa, 2004.
  • [16] S. Kim, E. Suh, H. Hwang, "Building the knowledge map: An industrial case study", Journal of Knowledge Management 7: 34-45, 2003. https://doi.org/10.1108/13673270310477270
  • [17] M.H. Lee, H.P. Tserng, "The Knowledge Map Apply to Junior Engineer in Construction Industry", Proceedings of 23rd International Symposium on Automation and Robotics in Construction 2006: 746-750, 2006.
  • [18] M.N. Wexler, "The who, what and why of knowledge mapping", Journal of Knowledge Management 5: 249-264, 2001. https://doi.org/10.1108/EUM0000000005868
  • [19] Y.M. Cheng, "Application of BIM on Documenting Construction Defects", International Journal of Engineering and Technology 9: 392-397, 2018. http://doi.org/10.7763/IJET.2017.V9.1005
  • [20] C.S. Park, D.Y. Lee, O.S. Kwon, X. Wang, "A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template", Automation in Construction 33: 61-71, 2013. https://doi.org/10.1016/j.autcon.2012.09.010
  • [21] J.Y. Lee, O.S. Kwon, J.S. Choi, C.S. Park, "A study on construction defect management using augmented reality technology" 2012 International Conference on Information Science and Applications, ICISA 2012. http://doi.org/10.1109/ICISA.2012.6220933
  • [22] H. Kim, J. Kim, "A case-based reasoning model for retrieving window replacement costs through industry foundation class", Applied Sciences 9: 2019. http://doi.org/10.3390/app9224728
  • [23] M. Mirshokraei, C.I. De Gaetani, F. Migliaccio, "A web-based BIM-AR quality management system for structural elements", Applied Sciences 9: 2019. https://doi.org/10.3390/app9193984
  • [24] Y.C. Lin, J.X. Chang, Y.C. Su, "Developing construction defect management system using BIM technology in quality inspection", Journal of Civil Engineering and Management 22: 903-914, 2016. https://doi.org/10.3846/13923730.2014.928362
  • [25] M. Januszka, M. Salamak, "Technologie BIM i poszerzonej rzeczywistości w inspekcji obiektów mostowych", Mosty 5: 28-35, 2016.
  • [26] J. Ratajczak, M. Riedl, D.T. Matt, "BIM-based and AR application combined with location-based management system for the improvement of the construction performance", Buildings 9: 2019. https://doi.org/10.3390/buildings9050118
  • [27] K. Zima, S. Biel, "The Concept of Method of Detecting and Analyzing Construction Defects in Residential Buildings", Archives of Civil Engineering 65: 81-95, 2019. http://doi.org/10.2478/ace-2019-0048
  • [28] A. Leśniak, K. Zima, "Cost calculation of construction projects including sustainability factors using the Case Based Reasoning (CBR) method", Sustainability 10: 2018. https://doi.org/10.3390/su10051608
  • [29] Z. Walczak, A. Szymczak-Graczyk, N. Walczak, "BIM jako narzędzie przyszłości w projektowaniu i rewitalizacji obiektów budowlanych", Przegląd Budowlany 1: 20-26, 2017.
  • [30] E. Plebankiewicz, K. Zima, J. Malara, S. Biel, "Analiza statystyczna usterek w budynkach mieszkalnych", Materiały Budowlane 10: 45-48, 2018. http://doi.org/10.15199/33.2018.10.12
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-61b054a3-a630-4ef1-b00e-6eb84fd10ee0
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.