SOK Research Project – Bw-1n gallery drilling test using Bolter Miner and exclusive bolting in Polish conditions

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The article presents the SOK Research Project idea, course and final results. The project was oriented onto an implementation of exclusive bolting in one of the Polish underground coal mines, realized with use of a multifunction Bolter Miner. Until starting that project the Jastrzębska Spółka Węglowa S.A. (Jastrzębska Coal Company J.S.C.) has been using different types of other supports (steel arches as gallery / roadway supports). Previous trials of implementing exclusive bolting in the Polish coal mines in the nineties of the XX century were not successful due to different reasons. In the case of the SOK Research Project, after having conducted detailed geological and mining analyses, a part of the Seam 401 in the Budryk Mine was chosen for tests of exclusive bolting with use of JOY 12CM30 Bolter Miner in the gallery drilling operations. Due to previous experience, gained in the process of exclusive bolting in the Upper Silesian Coal Basin conditions, special attention was paid to bolting designing as well as an installation and monitoring. As the SOK Research Project was the first trial in Poland of gallery drilling using exclusive bolting and Bolter Miner, so it was difficult to predict exact costs and final efficiency results. For all the project participants, i.e. the mining crew, engineers, managers and researchers it was an on-job training in the scope of new technology. The SOK Research Project enabled to gain a lot of new experience and knowledge, leading to guidelines and conclusions which can be useful in the following exclusive bolting implementations with Bolter Miner technology.
Czasopismo
Rocznik
Strony
43--53
Opis fizyczny
Bibliogr. 19 poz., rys., wykr., zdj.
Twórcy
autor
  • Mineral and Energy Economy Research Institute of the Polish Academy of Sciences, J. Wybickiego 7A, 31-261 Kraków, Poland
  • KOMAG Institute of Mining Technology, Pszczyńska 37, 44-100 Gliwice, Poland
  • Department of Civil Engineering, Faculty of Engineering, International Islamic University Malaysia, Jalan Gombak 50728, Selangor, Malaysia
  • Department of Civil Engineering, University of Engineering and Technology Peshawar (Bannu Campus), Bannu 28100, Pakistan
Bibliografia
  • [1] Chowaniec W., Domżoł A.: Wdrożenia projektu samodzielnej obudowy kotwowej wyrobiska korytarzowego w JSW S.A. KWK „Budryk” (Komunikat). Bezpieczeństwo Pr. i Ochr. Śr. w Górnictwie 2021, t. 1, s. 15–19. (In Polish) (Implementation of the project of independent rock bolt support for the gallery in JSW S.A. KWK “Budryk” (Statement))
  • [2] Możliwość zastosowania obudowy kotwowej w kopalniach JSW, Główny Instytut Górnictwa, Katowice, 2017
  • [3] Małkowski P.: Obudowa kotwowa wczoraj i dziś w aspekcie obowiązujących przepisów. Bezpieczeństwo Pr. i Ochr. Śr. w Górnictwie 2016, t. 11, s. 3–13. (In Polish) (Bolting supports then and now in the context of applicable regulations)
  • [4] Rak Z., Stasica, J., Burtan, Z.: Skuteczne rozwiązania w systemie wysokiego kotwienia dla wzmacniania obudowy podporowej—Effective solutions in the long rock bolting system for strengthening the standing suport. Zesz. Nauk. Inst. Gospod. Surowcami Miner. I Energią PAN 2017, 101, 101–116. (In Polish)
  • [5] Dyczko A.: Bolter Miner Machine for Driving Roadway Workings – Polish Experience, Monograph, Instytut Techniki Górniczej KOMAG, Gliwice, 2021. ISBN 978-83-65593-26-9. DOI: 10.32056/KOMAG/Monograph2021.2
  • [6] Dyczko A., Kamiński P., Jarosz J., Rak Z., Jasiulek D., Sinka T.: Monitoring of Roof Bolting as an Element of the Project of the Introduction of Roof Bolting in Polish Coal Mines—Case Study. Energies. 2022; 15(1):95. https://doi.org/10.3390/en15010095
  • [7] Majcherczyk T.; Małkowski P.; Niedbalski Z.: Stateczność chodników równoległych w samodzielnej obudowie kotwowej. Przegląd Górniczy 1999, nr 10, s. 16–25. (In Polish)
  • [8] Majcherczyk T., Małkowski, P., Niedbalski Z.: Stand-and-roof-bolting support: An effective way of roadway reinforcement. In Proceedings of the 22nd World Mining Congress & Expo, Istanbul, Turkey, 11–16 September 2011; Eskikaya, S., Ed.; Aydogdu Ofset: Ankara, Turkey, 2011; pp. 279–285.
  • [9] Projekt techniczny drążenia chodnika Bw-1n badawczego w pokładzie 401 w samodzielnej obudowie kotwowej – Faza I, JSW Innowacje, Katowice 2019 (unpublished)
  • [10] Projekt techniczny drążenia chodnika Bw-1n badawczego w pokładzie 401 w samodzielnej obudowie kotwowej – Faza II, JSW Innowacje, Katowice, 2019 (unpublished)
  • [11] Projekt techniczny drążenia chodnika Bw-1n badawczego w pokładzie 401 w samodzielnej obudowie kotwowej – Faza III, JSW Innowacje, Katowice, 2020 (unpublished)
  • [12] Projekt techniczny drążenia chodnika Bw-1n badawczego w pokładzie 401 w samodzielnej obudowie kotwowej – Faza IV, JSW Innowacje, Katowice, 2020 (unpublished)
  • [13] Wykonanie prac badawczych dla wdrożenia samodzielnej obudowy kotwowej w JSW S.A., KWK Budryk. Zadanie 1: Projekt samodzielnej obudowy kotwowej wraz z określeniem sposobu monitoringu. Główny Instytut Górnictwa, Katowice, 2018 (unpublished)
  • [14] Korski J.: Capacity losses factors of fully mechanized longwall complexes. Min. Mach. 2020, No. 3, pp. 12-21, DOI: 10.32056/KOMAG2020.3.2.
  • [15] Rozporządzenie Ministra Energii z dnia 23 listopada 2016 r. w sprawie szczegółowych wymagań dotyczących prowadzenia ruchu w podziemnych zakładach górniczych
  • [16] JM 7253 – Instrukcja obsługi – 12CM30 Bolter Miner – KWK Budryk, Komatsu Mining Corp., 2020
  • [17] Instrukcja obsługi i ekspolatacji kombajnu chodnikowego JOY 12CM30, JSW Innowacje, Katowice, 2019 (unpublished)
  • [18] Projekt B+R „Samodzielna Obudowa Kotwowa”, Raporty nr 1-10 ze świadczenia usług B+R, JSW Innowacje, Katowice, 2019-2020 (unpublished)
  • [19] Projekt samodzielna obudowa kotwowa w KWK Budryk – projekt skrzyżowania w samodzielnej obudowie kotwowej, Główny Instytut Górnictwa, Katowice, 2020 (unpublished)
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu „Społeczna odpowiedzialność nauki” - moduł: Popularyzacja nauki i promocja sportu (2022-2023)
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-5e35e9cc-4fc0-4cf5-a3c0-cfb83d629232
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.