PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Analysis of Horizontal Well Operation at the Zhanazhol Deposit

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The need for accelerated economic growth sets the task of increasing efficiency and improving the quality of drilling for the oil industry. This task includes both quantitative growth, i.e. an increase in the speed of drilling, and improvement of the quality of drilling operations themselves. One of the most important factors of quality improvement is the drilling of directional and, particularly, horizontal wells strictly according to the project. This paper provides a brief analysis of the operation of horizontal wells at the Zhanazhol deposit. It also presents studies on the statistics of the effective length of horizontal well sections.
Rocznik
Strony
25--32
Opis fizyczny
Bibliogr. 20 poz., rys., tab.
Twórcy
  • LLP “Technopark Zerek”, Aktobe, Brothers Zhubanovy Str., 302/a, Republic of Kazakhstan
  • Kazakhstan University of Innovative and Telecommunication Systems, Uralsk, Republic of Kazakhstan
autor
  • West Kazakhstan Agrarian Technical University, Uralsk, Republic of Kazakhstan
autor
  • West Kazakhstan State University, Uralsk, Republic of Kazakhstan
autor
  • West Kazakhstan State University, Uralsk, Republic of Kazakhstan
autor
  • Kazakhstan University of Innovative and Telecommunication Systems, Uralsk, Republic of Kazakhstan
autor
  • West Kazakhstan Agrarian Technical University, Uralsk, Republic of Kazakhstan
Bibliografia
  • 1. Aldamzharov N.N. 2001. Construction of horizontal wells at the Zhanazhol deposit. V International Symposium on Drilling Wells in Complicated Conditions, St. Petersburg, 11–15 June 2001, 5–6.
  • 2. Aldamzharov N.N. 2003. Design of the technology of multilateral wells at the Zhanazhol deposit. Oil and Gas Business, Aktobe, pp. 189.
  • 3. Aliyev Z.S. et al. 2001. The rationale and choice of the optimal design of horizontal gas wells. Moscow, pp. 51.
  • 4. Basniyev K.S. and Aliyev Z.S. 1999. Methods for calculating the flow rates of horizontal, directional and multihole gas wells. Moscow.
  • 5. Churnykh V.V. 1999. Evaluation of the productivity of multilateral wells in various sidetracking schemes. Moscow, RSU of Oil and Gas – Neftyanoye Khozyaystvo, 9.
  • 6. Creation and implementation of a multifunctional technological complex for the construction of directional and horizontal holes. 2000. “OAO NPO Drilling Engineering” – VNIIBT. Moscow, pp. 48.
  • 7. Eliyashevsky I.V. et al. 1982. Typical tasks and calculations in drilling. 2nd ed. Moscow, Nedra.
  • 8. Grigoryan A.M. 1969. Reservoir drilling by multihole and horizontal wells. Moscow: Nedra, pp. 123.
  • 9. Grigoryan A.M. 1998. Multilateral wells are the near future of the oil industry. Moscow: Neftyanoye Khozyaystvo, 11, 2–12.
  • 10. Instruction for directional well drilling. 1966. Moscow: VNIIBT, 31, pp. 174.
  • 11. Kuliyev Yu.M. 1986. Improving the technology of directional well drilling by developing and implementing a rational profile of effective bottomhole assembly. Doctoral dissertation. Baku. Azerbaijan State Oil and Industrial University, pp. 165.
  • 12. Nikitin B.A. el al. 1999. Determination of the productivity of horizontal gas wells and reservoir parameters from the results of hydrodynamic studies at stationary modes. Moscow, OAO Gazprom.
  • 13. Oganov A.S. et al. 1999. Current state and prospects for drilling directional and horizontal wells with large hole deviations from the vertical. Moscow, OAO VNIIOENG, pp. 35.
  • 14. Oganov A.S. et al. 2001. Multihole well drilling: Development, problems and successes. Moscow, OAO VNIIOENG, pp. 4–31.
  • 15. Oganov G.S. 1999. On the issue of choosing the type of wells and the methods of underreaming of the oil and gas deposit. OAO NPO “Drilling Engineering”. Moscow, Scientific and Technical Journal, 10, 32.
  • 16. Oganov S.A. Gasanov I.Z., Kuliyev Yu.M. and Tsybulsky I.S. 1979. Determination of the diameter and length of the stabilizer to ensure conditions to prevent its touching the upper side of hole. Scientific works of Azerbaijan State Oil and Industrial University, 3, 21–23.
  • 17. Shamanov S.A. 2001. Drilling and completion of horizontal wells. Moscow, LLC “Nedra – Biznestsentr”.
  • 18. Technology “TOBUS”. 1997. Moscow.
  • 19. Woods G. and Lubinski A. 1960. Well deviation during drilling. Trans. from English. Moscow: Gostoptekhizdat, pp. 161.
  • 20. Zainullin A.I. 1995. Forecasting of optimal parameters for oil horizontal wells. Moscow, VNIIOENG, Drilling of wells onshore and offshore, 10, 61.
Uwagi
Opracowanie rekordu w ramach umowy 509/P-DUN/2018 ze środków MNiSW przeznaczonych na działalność upowszechniającą naukę (2018).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-581138b6-0553-4f82-89c8-408e47704c01
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.