Risk of alterations to project documentation on an example of environmental engineering construction

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Investor bears responsibility for proper preparation of the investment process. One of his tasks is to prepare the project documentation and obtaina building permit. Frequently, during his work, there are situations and events whose impact interferes with the design solutions. Regardless of reasons, alterations to a project constitute a source of cost risk. In each case, the Investor should be prepared for this type of a risk. Exposure to risk should be taken into account in the planning stage of the investment. Also, a model of investment execution should be chosen at this stage. The type of model is associated with the distribution of risk throughout the project. The aim of this paper is to identify events that generate risk related to alterations to Project Documentation in the context of the selection of the investment execution model.
Rocznik
Strony
499--508
Opis fizyczny
Bibliogr. 19 poz., il., tab.
Twórcy
autor
  • Wroclaw University of Environmental and Life Sciences, The Faculty of Environmental Engineering and Geodesy, Wrocław
  • Wroclaw University of Environmental and Life Sciences, The Faculty of Environmental Engineering and Geodesy, Wrocław
Bibliografia
  • 1. Act of 7 July 1994 Building Code (Dz. U. 1994 Nr 89 poz. 414).
  • 2. J. BIZON-GÓRECKA, J. GÓRECKI, Modelling of constructional investment projects in legal aspects [in Polish], Risk management strategies in the enterprise – investment risk, TNOiK Bydgoszcz, 21-32, 2012.
  • 3. E. BONDAR-NOWAKOWSKA, I. RYBKA, Relations of risk event in the construction of sewerage [in Polish], Scientific Review Engineering and Environmental Sciences, nr 54, 285-293, 2011.
  • 4. Conditions of Contract for Construction. For Building and Engineering Works designed by the Employer. General conditions; Guidance for Preparation of Particular Conditions; Forms of Tender FIDiC, 1999.
  • 5. Conditions of Contract for Plant and Design-Build. For Electrical and Mechanical Plant and for Building and Engineering Works Designed by the Contractor. General conditions; Guidance for Preparation of Particular Conditions; Forms of Tender FIDiC, 1999.
  • 6. A. CZEMPLIK, Construction project management with consideration of change order risk [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 45-50, 2012.
  • 7. M. GAERTNER, A. KOŃCZAK, Gaining of know-how in construction project [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 109-114, 2012.
  • 8. O. KAPLIŃSKi, Comments to author’s research [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 171-185, 2012.
  • 9. J. KONIOR, The randomness and fuzziness in replacement and additional construction works [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 187-192, 2012.
  • 10. R. KOZIK, A. LEŚNIAK, E. PLEBANKIEWICZ, K. ZIMA, Accuracy of preliminary assessment of the zero stage costs of constructional object [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 201-207, 2012.
  • 11. J. KULEJEWSKI, J. ZAWISTOWSKI, Method of maximization of the NPV value of the construction in uncertain conditions [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 201-207, 2012.
  • 12. A. LEŚNIAK, E.PLEBANKIEWICZ, K. ZIMA, Design and build procurement system – Contraction selection, Archives of Civil Engineering, LVIII, 4, 2012, 463-476.
  • 13. C. L. PRITCHARD, Risk Management Concepts and Guidance [in Polish], Wig-Press., Warszawa 2001, ss. 346.
  • 14. Project Documentation under the Contract for the Works no. 2000/PL/16/P/PE/022-02 – Construction of sewage systems in regions of Lewin Brzeski and Skarbimierz [in Polish].
  • 15. Project Documentation under the Contract for the Works no. 2000/PL/16/P/PE/022-03 – Construction of sewage systems in regions of Lubsza, Oława and Olszanka [in Polish].
  • 16. I. RYBKA, The influence of the changes to Project documentation on cost and time of building Works [in Polish], Interdisciplinary Problems in Environmental Engineering, OWPWr, 435-442. 2012.
  • 17. I. RYBKA, The influence of the commencement date on the duration of construction with regard to the example of sewage system construction in Wnorów [in Polish], Scientific Review Engineering and Environmental Sciences, nr 55, 46-54, Warszawa 2012.
  • 18. I. RYBKA, E. BONDAR-NOWAKOWSKa, Alterations to project documentation and the concomitant investor risk [in Polish], Archives of the Institute of Civil Engineering, WPP, nr 13, 305-310, 2012.
  • 19. D. SKORUPKA, The method of identification and quantifi cation of construction project risk, Archives of Civil Engineering, LI, 4, 2005, 647-662.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-540c292d-3a95-4bf6-8060-07c12ee6f489
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.