Validity and reliability testing of the questionnaire used to finalize criteria for the evaluation of the contractor’s performance

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The paper aims to determine the criteria and sub-criteria for evaluating the contractor’s performance and finalize a master list of the criteria and sub-criteria to be used for evaluating contractor’s performance with their respective weights. The method is incorporated in the framework proposed for the evaluation of the contractor’s performance during the execution phase. An exploratory study has been opted, using a structured, close-ended multiple-choice questionnaire survey approach. The questionnaire survey was conducted in two phases, i.e. validation survey, and reliability survey. Fifteen experts responded to the validation survey, and thirty experts to the reliability survey. The experts were from Government and public sectors in India, working at various senior levels. The weights of criteria and sub-criteria were calculated from data collected in the survey, relative importance was calculated through the relative importance index and criteria were ranked. The paper provides criteria and sub-criteria which were finalized through a questionnaire survey by classification of criteria identified in literature and tender review. The respective weights were finalized, which can be measured while evaluating contractors’ performance. The weights assigned to criteria through the survey are; health and safety is 13.19%, followed by finance 11.93%, time 11.93%, quality 13.38%, client satisfaction 12.42%, environmental safety 12.32%, productivity 12.51% and regulation 12.32%. The paper provides the criteria and sub-criteria with their weights needed for evaluating the performance of contractors during the project execution phase. This research can lead to a culture of continuous measurement of performance for the satisfactory completion of projects.
Twórcy
  • Civil and Environmental Engineering Department, Veermata Jijabai Technological Institute, Mumbai, India
autor
  • Civil and Environmental Engineering Department, Veermata Jijabai Technological Institute, Mumbai, India
Bibliografia
  • [1] A. Noorizadeh, A. Peltokorpi, and N.K. Avkiran, “Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions”, Journal of Construction Engineering and Management, vol. 145, no. 4, art. no. 04019007, 2019, doi: 10.1061/(ASCE)CO.1943-7862.0001616.
  • [2] A. Elyamany and M. Abdelrahman, “Contractor Performance Evaluation for the Best Value of Superpave Projects”, Journal of Construction Engineering and Management, vol. 136, no. 5, pp. 606-614, 2010, doi: 10.1061/(ASCE)CO.1943-7862.0000158.
  • [3] K.Z.M. Arof, S. Ismail, and A.L. Saleh, “Contractor’s Performance Appraisal System in the Malaysian Construction Industry: Current Practice, Perception, and Understanding”, International Journal of Engineering and Technology, vol. 7, no. 3.9, pp. 46-51, 2018, doi: 10.14419/ijet.v7i3.9.15272.
  • [4] K. Gunasekara, S. Perera, M. Hardie, and X. Jin, “A Contractor-Centric Construction Performance Model Using Non-Price Measures”, Buildings, vol. 11, no. 8, 2021, doi: 10.3390/buildings11080375.
  • [5] K. Goepel, “Implementation of an Online Software Tool for the Analytic Hierarchy Process (AHP-OS)”, International Journal of the Analytic Hierarchy Process, vol. 10, no. 3, 2018, doi: 10.13033/ijahp.v10i3.590.
  • [6] C.R. Kothari, Research methodology methods and technique. New Delhi, India: New Age International (P) Ltd. Publishers, 2004.
  • [7] W.C. Hong, “Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach”, Journal of Construction Engineering and Management, vol. 130, no. 5, pp. 691-698, 2004, doi: 10.1061/(ASCE)0733-9364(2004)130:5(691).
  • [8] N.A. Jasim, “Evaluation of Contractors Performance in Iraqi Construction Projects Using Multiple Criteria Complex Proportional Assessment Method (COPRAS)”, IOP Conference Series: Materials Science and Engineering, vol. 1076, art. no. 012106, 2021, doi: 10.1088/1757-899X/1076/1/012106.
  • [9] C.-H. Ko, M.-Y. Cheng, and T.-K. Wu, “Evaluating sub-contractors performance using EFNIM”, Automation in Construction, vol. 16, no. 4, pp. 525-530, 2007, doi: 10.1016/j.autcon.2006.09.005.
  • [10] F.G. Pratico and M. Giunta, “LCC -based appraisal of ballasted and slab tracks: limits and potential”, The Baltic Journal of Road and Bridge Engineering, vol. 13, no. 4, pp. 475-499, 2018, doi: 10.7250/bjrbe.2018-13.429.
  • [11] F. Yasamis-Speroni, D.-E. Lee, and D. Arditi, “Evaluating the Quality Performance of Pavement Contractors”, Journal of Construction Engineering and Management, vol. 138, no. 10, pp. 1114-1124, 2012, doi: 10.1061/(ASCE)CO.1943-7862.0000539.
  • [12] G. Arslan, S. Kivrak, M.T. Birgonul, and I. Dikmen, “Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES)”, Automation in Construction, vol. 17, no. 4, pp. 480-488, 2008, doi: 10.1016/j.autcon.2007.08.004.
  • [13] M. Creuza and L. Hazin, “Model for Contractor Performance Evaluation in Construction Industry”, in 2016 IEEE International Conference on Systems, Man, and Cybernetics. Budapest: IEEE, 2016, doi: 10.1109/SMC.2016.7844636.
  • [14] A. Mahmoudi and S.A. Javed, “Performance Evaluation of Construction Sub-contractors using Ordinal Priority Approach”, Evaluation and Program Planning, vol. 91, 2022, doi: 10.1016/j.evalprogplan.2021.102022.
  • [15] M.M.A.A. Oda, B.A. Tayeh, S.A. Alhammadi, and Y.I.A. Aisheh, “Key indicators for evaluating the performance of construction companies from the perspective of owners and consultants”, Results in Engineering, vol. 15, 2022, doi: 10.1016/j.rineng.2022.100596.
  • [16] J. Fuller, C.J. Brown, and R. Crowley, “Performance-Based Maintenance Contracting in Florida: Evaluation by Surveys, Statistics, and Content Analysis”, Journal of Construction Engineering and Management, vol. 144, no. 2, 2018, doi: 10.1061/(ASCE)CO.1943-7862.0001429.
  • [17] J.C. Mosley and A.A. Bubshait, “Performance Evaluation of International Contractors in Saudi Arabia”, Journal of Professional Issues in Engineering Education and Practice, vol. 142, no. 1, art. no. 04015007, 2016, doi: 10.1061/(ASCE)EI.1943-5541.0000254.
  • [18] K.C. Iyer and K.N. Jha, “Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects”, Journal of Construction Engineering and Management, vol. 132, no. 8, pp. 871-881, 2006, doi: 10.1061/(ASCE)0733-9364(2006)132:8(871).
  • [19] K.N. Jha and K.C. Iyer, “Commitment, coordination, competence, and the iron triangle”, International Journal of Project Management, vol. 25, no. 5, pp. 527-540, 2007, doi: 10.1016/j.ijproman.2006.11.009.
  • [20] M. Radujković, M.S. Klepo, and M. Bosch-Rekveldt, “Breakdown of Engineering Projects’ Success Criteria”, Journal of Construction Engineering and Management, vol. 147, no. 11, art. no. 04021144, 2021, doi: 10.1061/(ASCE)CO.1943-7862.0002168.
  • [21] O.A. Bolarinwa, “Principles and Methods of Validity and Reliability Testing of Questionnaires Used in Social and Health Science Researches”, Niger Postgrad Medical Journal, vol. 22, no. 4, pp. 195-201, 2015, doi: 10.4103/1117-1936.173959.
  • [22] P.A. Wondimu, O.J. Klakegg, J. Lohne, and O. Lædre, “Experiences with Best-Value Procurement in Norway and the Netherlands”, Journal of Construction Engineering and Management, vol. 146, no. 5, art. no. 05020001, 2020, doi: 10.1061/(ASCE)CO.1943-7862.0001814.
  • [23] Q. He, T. Wang, A.P.C. Chan, and J. Xu, “Developing a List of Key Performance Indicators for Benchmarking the Success of Construction Megaprojects”, Journal of Construction Engineering and Management, vol. 147, no. 2, art. no. 04020164, 2021, doi: 10.1061/(ASCE)CO.1943-7862.0001957.
  • [24] S. Kar and K.N. Jha, “Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences”, Journal of Construction Engineering and Management, vol. 146, no. 9, art. no. 05020011, 2020, doi: 10.1061/(ASCE)CO.1943-7862.0001906.
  • [25] S. Maturana, L.F. Alarcón, P. Gazmuri, and M. Vrsalovic, “On-Site Subcontractor Evaluation Method Based on Lean Principles and Partnering Practices”, Journal of Management in Engineering, vol. 23, no. 2, pp. 67-74, 2007, doi: 10.1061/(ASCE)0742-597X(2007)23:2(67).
  • [26] Y. Wen-Der, C. Hsien-Kuan, H. Yuan-Yu, C. Shao-Tsai, and W. Kwo-Wuu, “Pre-tendering Decision Model for Contractor Selection of Public Procurement Projects”, Journal of Construction Engineering and Management, vol. 146, no. 11, art. no. 04020126, 2020, doi: 10.1061/(ASCE)CO.1943-7862.0001923.
  • [27] Y.N. Labib, W. B. Lotfallah, A. S. Hanna, and N.W. Boulos, “Development and Application of Performance Index for Comparative Assessment of Public Capital Projects”, Journal of Construction Engineering and Management, vol. 147, no. 2, art. no. 04020175, 2021, doi: 10.1061/(ASCE)CO.1943-7862.0001992.
  • [28] Z. Jin, F. Deng, H. Li, and M. Skitmore, “Practical Framework for Measuring Performance of International Construction Firms”, Journal of Construction Engineering and Management, vol. 139, no. 9, pp. 1154-1167, 2013, doi: 10.1061/(ASCE)CO.1943-7862.0000718.
  • [29] N.Q. Toan and D.T. Hai, “Assessment of factors influencing on the success of public-private partnerships infrastructure projects in Vietnam”, Archives of Civil Engineering, vol. 69, no. 1, pp. 343-365, 2023, doi: 10.24425/ace.2023.144177.
  • [30] P. Trtílek and T. Hanák, “The importance of criteria used in performance measurement systems in Czech construction companies”, Archives of Civil Engineering, vol. 68, no. 4, pp. 481-492, 2022, doi: 10.24425/ace.2022.143050.
  • [31] V.S. Nguyen, H.H. Nguyen, D.A. Nguyen, and D.T. Hai, “Delay factors in the construction of irrigation and hydropower projects in Vietnam”, Archives of Civil Engineering, vol. 69, no. 1, pp. 5-20, 2023, doi: 10.24425/ace.2023.144156.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2024).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-4e1abea7-3e9f-4d81-9cab-ad8959ab63aa
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.