Research on reinforced concrete structure design of urban buildings by using BIM technology

Autorzy
Treść / Zawartość
Identyfikatory
Języki publikacji
EN
Abstrakty
EN
In order to improve the application of BIM technology in reinforced concrete structure design. Methods: This paper takes the housing project in District A of Guangzhou as the research object, and uses BIM technology to design the precast part of the reinforced concrete structure in the C household, including the deepening design of the reinforced concrete structure, production management of the precast components, tracking, address data modeling, hoisting and deployment, etc., which penetrates into all aspects of the design of the reinforced concrete structure. It was found that after the application of BIM technology, the construction period was reduced from the originally established 13 days per floor to 7 days per floor, and the on-site construction errors were reduced, the construction efficiency and construction quality were improved, and the project was successfully completed. It can be seen that the application of BIM technology in the design of reinforced concrete structures in urban buildings can shorten the construction period and ensure the construction quality at the same time. It is a favorable means to promote the development of urban construction industry and should be actively promoted.
Rocznik
Strony
71--83
Opis fizyczny
Bibliogr. 18 poz., il., tab.
Twórcy
autor
  • Department of Construction Engineering and Art Design, Suzhou Vocational Institute of Industrial Technology, Jiangsu, China
Bibliografia
  • [1] R. Kontrimovicius, L. Ustinovicius, C. Miedziałowski, and M. Vaišnoras, “The initial prototype BIM system for the optimization of integrated construction processes”, Archives of Civil Engineering, vol. 68, no. 3, pp. 617-631, 2022, doi: 10.24425/ace.2022.141906.
  • [2] A.N. Haddad, A.B. Silva, A.W.A. Hammad, M. Najjar, E.G. Vazquez, and V.W. Tam, “An integrated approach of building information modelling and life cycle assessment (BIM-LCA) for gas and solar water heating systems”, International Journal of Construction Management, vol. 23, no. 14, pp. 1-17, 2023,doi: 10.24425/ace.2022.141906.
  • [3] A.B. Mohammed, “Process Map for Accessing Automatization of Life Cycle Assessment Utilizing Building Information Modeling”, Journal of Architectural Engineering, vol. 29, no. 3, 2023, doi: 10.1061/JAEIED.AEENG-1449.
  • [4] N.H.K. Anuar, N. Ishak, and N.S. Shohime, “The Integration of Critical Risk with Building Information Modelling (BIM) Application Strategies in Building Refurbishment Project Lifecycle”, IOP Conference Series: Earth and Environmental Science, vol. 1238, no. 1, pp. 1-9, 2023, doi: 10.1088/1755-1315/1238/1/012004.
  • [5] P. Peng, “Application of Building Information Model BIM technology in intelligent civil engineering”, Integrated Circuit Applications, vol. 40, no. 8, pp. 212-213, 2023.
  • [6] Y. Bai, “The application of BIM technology in construction project management”, Real Estate World, vol. 2023, no. 16, pp. 106-108, 2023.
  • [7] C.Y. Zhang, “Design of building engineering information Model based on BIM technology”, Electronic Technology, vol. 52, no. 07, pp. 78-80, 2019.
  • [8] Q. Zhang, “Application of BIM Information Technology in Building engineering Design”, Electronic Technology, vol. 52, no. 07, pp. 121-123, 2023.
  • [9] L.N. An, “BIM Modeling Analysis Based on Quantitative durability of Reinforced Concrete Structures”, The Comprehensive Utilization of Fly Ash, vol. 37, no. 02, pp. 135-140, 2023.
  • [10] Z.T. Wu, “Research on joint assembly method and application of prefabricated reinforced concrete and wood mixed structures based on BIM technology”, Northwest University for Nationalities, Gansu Province, China, 2021.
  • [11] L.R. Xiao, W.Y. Zhou, and J.H. Gao, “BIM design method and analysis for prefabricated structure of a reinforced concrete dormitory building”, Shanxi Architecture, vol. 45, no. 07, pp. 57-60, 2019.
  • [12] J. Wang, “An image encryption algorithm based on block scrambling and Mixed chaos”, Changjiang Information and Communication, vol. 34, no. 10, pp. 64-66, 2021.
  • [13] Q.Q. Wang, X.Z. Yang, and Y.P. Lin, “Research on BIM structure model generation method based on Layer Automatic Recognition algorithm”, Civil Engineering Information Technology, vol. 14, no. 03, pp. 80-88, 2022.
  • [14] Q. Wang, and M. Qi, “Research on Fuzzy Low quality optical Character Recognition Technology”, Proceedings of the 14th National Conference on Signal and Intelligent Information Processing and Application, vol. 2021, pp. 223-226, 2021.
  • [15] Y.J. Chen, “Research on the application of Revit Secondary Development in BIM Forward Design of Subway cable laying”, Building Energy Efficiency (Chinese and English), vol. 51, no. 07, pp. 139-144, 2019.
  • [16] S.L. Zhang, H.Z. Zhang, and J. Li, “Differences between Revit and AutoCAD and 3dsMAX in nuclear power plant design”, Water Supply and Drainage, vol. 53, no. S2, pp. 175-177, 2017.
  • [17] J.S. Yao, and Z.W. Hou, “Application practice of BIM and AR in the operation and maintenance of existing hospitals: Practice and exploration of information transformation of existing buildings in the old hospital district of Huashan Hospital Affiliated to Fudan University”, Chinese Hospital Architecture and Equipment, vol. 24, no. 07, pp. 59-63, 2019.
  • [18] L.J. Hou, W. Li, J.F. Zhang, Z.Y. Wang, Z.Q. Yuan, and Y. Xiang, “Reinforcement calculation technology for BIM model of ship lock engineering based on Revit secondary development”, Port & Waterway Engineering, vol. 2022, no. 11, pp. 197-201+221, 2022.
Identyfikator YADDA
bwmeta1.element.baztech-4b786dfe-786f-4221-a9d7-4662a62b082d