Method of the assessment of the influence of longwall effective working time onto obtained mining output

Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Metoda oceny wpływu efektywnego czasu pracy w ścianie na uzyskiwane wydobycie
Języki publikacji
EN
Abstrakty
EN
Method of the influence of assessment of longwall effective working time onto obtained mining output, has been discussed in the present study. Mean flow rate of the winning stream being also considered as directional factor of linear function describing relation between daily output and effective mining in the longwall face, has been determined. Such relation – presented also graphically in form of the diagram – determines significance and influence of the effective working time onto obtained mining output. This relation should be considered as motivation in particular for supervisory personnel, as it shows advantages resulting from elongation of this time, as well as it shows possible loses of the daily output in a case, when the effective working time in given longwall face was shortened.
PL
Treścią pracy jest metoda oceny wpływu efektywnego czasu pracy w ścianie na uzyskiwane wydobycie. Wyznaczane jest średnie natężenie strugi urobku, będące jednocześnie współczynnikiem kierunkowym funkcji liniowej, opisującej zależność wydobycia zmianowego od efektywnego czasu pracy w przodku. W ten sposób wyznaczona zależność – prezentowana także graficznie w formie wykresu – zwraca uwagę na znaczenie i wpływ efektywnego czasu pracy na uzyskiwane wydobycie. Powinna działać motywacyjnie (w szczególności chodzi o pracowników dozoru ruchu), gdyż pokazuje korzyści wynikające ze zwiększenia długości tego czasu, ale także pokazuje możliwości strat w wydobyciu zmianowym, jeśliby efektywny czas pracy w danym przodku ścianowym uległ skróceniu.
Rocznik
Strony
967--977
Opis fizyczny
Bibliogr. 7 poz., rys., wykr.
Twórcy
  • AGH University of Science and Technology, Faculty of Mining and Geoengineering, Al. A. Mickiewicza 30, 30-059 Kraków, Poland
autor
  • AGH University of Science and Technology, Faculty of Mining and Geoengineering, Al. A. Mickiewicza 30, 30-059 Kraków, Poland
autor
  • AGH University of Science and Technology, Faculty of Mining and Geoengineering, Al. A. Mickiewicza 30, 30-059 Kraków, Poland
Bibliografia
  • [1] Snopkowski R., 2000. Boundary conditions for elementary functions of probability densities for the production process realized in longwalls. Arch. Min. Sci., Vol. 45, No 4, p. 501-510.
  • [2] Snopkowski R., 2002. Longwall output plan considered in probability aspect. Arch. Min. Sci., Vol. 47, No 3, p. 413-420.
  • [3] Snopkowski R., 2005. The use of the Stochastic Simulation for Identyfication of the Function of Output Probability Density. Arch. Min. Sci., Vol.50, No 4, p. 497-504.
  • [4] Snopkowski R., 2009. Stochastic model of the longwall face excavation using two-way shearer mining technology. Arch. Min. Sci., Vol. 54, No 3, p. 573-585.
  • [5] Snopkowski R., Napieraj A., 2012. Method of the production cycle duration time modeling within hard coal longwall faces. Arch. Min. Sci., Vol. 57, No 3, p. 573-585.
  • [6] Snopkowski R., Sukiennik M., 2012. Selection of the longwall face crew with respect to stochastic character of the production process – part 1 – procedural description. Arch. Min. Sci., Vol. 57, No 4, p. 1071-1088.
  • [7] Snopkowski R., Sukiennik M., 2013. Longwall face crew selection with respect to stochastic character of the production process – part 2 – calculation example. Arch. Min. Sci., Vol. 58, No 1, p. 227-240.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-4b3d99ff-3760-48fc-a9e8-13e3e673cc82
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.