Multivariate linear regression and CART regression analysis of TBM performance at Abu Hamour phase - I tunnel

Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Analiza wskaźników wydajności drążenia tarczami TBM dla tunelu Abu Hamour - etap I, z zastosowaniem wielorakiej regresji liniowej i regresji CART
Języki publikacji
EN
Abstrakty
EN
The first phase of the Abu Hamour drainage and storm tunnel was completed in early 2017. The 9.5 km long, 3.7 m diameter tunnel was excavated with two Earth Pressure Balance (EPB) Tunnel Boring Machines from Herrenknecht. TBM operation processes were monitored and recorded by Data Acquisition and Evaluation System. The authors coupled collected TBM drive data with available information on rock mass properties, cleansed, completed with secondary variables and aggregated by weeks and shifts. Correlations and descriptive statistics charts were examined. Multivariate Linear Regression and CART regression tree models linking TBM penetration rate (PR), penetration per revolution (PPR) and field penetration index (FPI) with TBM operational and geotechnical characteristics were performed for the conditions of the weak/soft rock of Doha. Both regression methods are interpretable and the data were screened with different computational approaches allowing enriched insight. The primary goal of the analysis was to investigate empirical relations between multiple explanatory and responding variables, to search for best subsets of explanatory variables and to evaluate the strength of linear and non-linear relations. For each of the penetration indices, a predictive model coupling both regression methods was built and validated. The resultant models appeared to be stronger than constituent ones and indicated an opportunity for more accurate and robust TBM performance predictions.
PL
Pierwszy etap budowy systemu odpływowego Abu Hamour został ukończony na początku roku 2017. Tunel o długości 9,5 km i średnicy 3,7 m przeprowadzono z zastosowaniem dwóch maszyn drążących z równoważeniem ciśnienia gruntu (EPB TBM), wyprodukowanych przez Herrenknechta. Przebieg pracy maszyn TBM był monitorowany i zapisywany przez automatyczny system zbierania danych. Autorzy połączyli te dane z dostępnymi informacjami o właściwościach masywu skalnego, oczyścili dane, uzupełnili zmiennymi wtórnymi oraz zagregowali tygodniami i zmianami roboczymi. Zbadano korelacje i statystyki opisowe. Metodami liniowej regresji wielorakiej i regresji CART zbudowano modele łączące wskaźniki wydajności drążenia (PR, PPR, FPI) z ich charakterystykami operacyjnymi oraz charakterystykami geotechnicznymi słabego masywu skalnego rejonu Doha, w którym prowadzono tunel. Obydwie zastosowane metody regresji dają interpretowalne modele oraz stosują odmienne algorytmy obliczeniowe, co pozwala na wzbogacenie wyników. Głównym celem analizy było znalezienie możliwie najlepszych podzbiorów zmiennych objaśniających oraz ocena siły znalezionych związków liniowych i nieliniowych. Dla każdego wskaźnika wydajności zbudowano też model predykcyjny wykorzystujący obydwie metody regresji. Zbudowane w ten sposób modele wynikowe okazały się silniejsze od modeli składowych. To wskazuje drogę możliwej poprawy dokładności i stabilności przewidywań wskaźników wydajności TBM.
Rocznik
Strony
825--841
Opis fizyczny
Bibliogr. 27 poz., rys., tab., wykr.
Twórcy
  • Dept. of Geomechanics, Civil Eng. & Geotechnics; AGH University, Kraków, Poland
  • CDM Smith, Woodbury, NY, USA
  • CDM Smith, Doha, Qatar
Bibliografia
  • [1] Abu Zeid M.M., 1991. Lithostratigraphy and framework of sedimentation of the subsurface Paleogene succession in northern Qatar. Arabian Gulf. N. Jb. Geol. Paliaiont. Mh.: 191-204.
  • [2] Avunduk E. Copur H., Bilgin N., Balci C., Tumac D., 2012. Effect of Some Geotechnical Properties on TBM Performance. Eurock 2012 ISRM International Symposium, 28-30 May 2012, Stockholm, Sweden.
  • [3] Barton N., 2000. TBM Tunneling In Jointed and Faulted Rock. Balkema, Rotterdam, p. 173.
  • [4] Benato A., Oreste P., 2015. Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristics. Int. J. Rock Mech. Min. Sci. 74, 119-127.
  • [5] Bieniawski Z.T., Celada B., Galera J.M., 2007. TBM excavability: prediction and machine-rock interaction. In: Proceedings, Rapid Excavation and Tunneling Conference, pp. 1118-1130.
  • [6] Breiman L., Friedman, J.H., Olshen, R.A., Stone, C.J., 1984. Classification and Regression Trees. Chapman & Hall/CRC.
  • [7] Bruland A., 1998. Prediction model for performance and costs. Norwegian TBM Tunnelling, Publication No. 11. Norwegian Tunnelling Society.
  • [8] Bruland A., 2014. The NTNU prediction model for performance. Norwegian Tunnelling Technology, Publication No. 23. Norwegian Tunnelling Society.
  • [9] Delisio A., Zhao J., 2014. A new model for TBM performance prediction in blocky rock conditions. Tunnel. Undergr. Space Technol. 43, 440-452.
  • [10] Gong Q.M., Zhao J., 2009. Development of a rock mass characteristics model for TBM penetration rate prediction. Int. J. Rock Mech. Mining. Sci. 46 (1), 8-18.
  • [11] Hamidi J.K., Shahriar K., Rezai B., Rostami J., 2010. Performance prediction of hard rock TBM using rock mass rating (RMR) system. Tunn.
  • [12] Hassanpour J., Rostami J., Khamehchiyan M., Bruland A., Tavakoli H.R., 2010. TBM performance analysis in pyroclastic rocks, a case history of Karaj Water Conveyance Tunnel (KWCT). J. Rock Mech. Rock Eng. 4, 427-445.
  • [13] Hassanpour J., Rostami J., Zhao J., 2011. A new hard rock TBM performance prediction model for project planning. Tunnel. Undergr. Space Technol. 26, 595-603.
  • [14] Jain P., Naithani A.K., Singh .TN., 2014. Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps - a case study. Int. J. Rock Mech. Geo. Eng. 6 (1), 36-47.
  • [15] LeBlanc J., 2008. A Fossil Hunting Guide to the Tertiary Formations of Qatar. Middle East. First Edition, March 2008.
  • [16] Maher J.A., 2017. Machine Learning Approach to Predicting and Maximizing Penetration Rates in EPB TBMs. https://src.acm.org, access 2017.
  • [17] NTNU, 1998. Report 1B-98 Hard Rock Tunnel Boring - Advance Rate and Cutter Wear. Department of Civil and Transport Engineering, Trondheim, Norway.
  • [18] Palmstrom A., 1995. RMi, a rock mass characterization system for rock engineering purposes. Chapter 7, Ph.D. thesis, Oslo University, Norway.
  • [19] Pathak A.K., Stypulkowski J.B, Bernardeau F.G., 2015. Super-vision of Engineering Geological Activities during Construction of Abu Hamour Surface and Ground Water Drainage Tunnel Phase-1 Doha, Qatar. [In:] International Conference on Engineering Geology in New Millennium at IIT, New Delhi 27-29 Oct 2015. Special Publication, J. of EG. October 2015, pp. 467-486.
  • [20] Ramezanzadeh A., 2005. Performance analysis and Development of new models for performance prediction of hard rock TBMs in rock mass. Ph.D. thesis, INSA, Lyon, France.
  • [21] Rostami J., 1997. Development of a force estimation model for rock fragmentation with disccutters through theoretical modeling and physical measurement of crushed zone pressure, Ph.D. thesis, Colorado School of Mines, Golden, Colorado, USA, p. 249.
  • [22] Salimi A., Rostami J., Moormann C., Delisio A., 2016. Application of nonlinear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs. Tunn Undergr Space.
  • [23] Stypulkowski J.B., Siyam A.A.F.M., Bernardeau F.G., Al Kuwari N.G., 2013. Abu Hamour Drainage Tunnel. First TBM Mined Tunnel in Doha, Qatar. [In] The First Arabian Tunnelling Conference & Exhibition, Dubai, pp. 300-314.
  • [24] Stypulkowski J.B., Bernardeau F.G., Jakubowski J., 2017. Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The art of tunneling in a new world. [In:] Engineering Challenges for Sustainable Underground Use. GeoMEast 2017. Springer, Cham.
  • [25] Tajduś A., Cała M., Tajduś K., 2012. Geomechanics in underground construction : design and construction of tunnels (in Polish). AGH, Kraków.
  • [26] Tibco Software Inc., 2017. Statistica (data analysis software system), version 13.
  • [27] Yagiz S., 2008. Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn. Undergr. Space Technol. 23 (3), 326-339.
Uwagi
PL
Opracowanie rekordu w ramach umowy 509/P-DUN/2018 ze środków MNiSW przeznaczonych na działalność upowszechniającą naukę (2018)
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-44a87f9e-b589-4268-9247-8edb0fa254ad
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.