Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
In the paper the problem of production orders sequencing in a mixed-model production system is considered. The authors present the design of the system and production orders, manufactured in the system. Model of the system consists of an input buffer and an assembly line with a given number of stations. The system is presented in a simplified manner, which provides the ability to compare it (under certain assumptions) with a real system. A virtual model of the mixed-model production system has been created. The main objective is to verify the correct operation of the prepared simulation model and the possibility of generating of input data and acquisition of output data in a mixed-model production system. The question is whether such model can be used to simulate the operation of a mixed-model production system in a manner that represents the outcome of a real system.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
45--51
Opis fizyczny
Bibliogr. 11 poz., rys.
Twórcy
autor
- Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Poland
autor
- Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Poland
Bibliografia
- [1] KRENCZYK D., 2002, The Concept of Distributed Control Procedure in Multiassortment Repetitive Production Systems. Proceedings of the International Conference TOOLS 2002, Kocovce, Slovakia, 2002.
- [2] KRENCZYK D., 2006, Automatic generation of production systems models for the computer simulation, Komputerowo Zintegrowane Zarządzanie. t. II, Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją, Opole, 26-35 (in Polish).
- [3] REIFUR B., 2007, Solving Hybrid Assembly Line Balancing Problem using Genetic Algorithm, Technologia i automatyzacja montaŜu, 2-3, 14-18, (in Polish).
- [4] KACZMARCZYK W., 2009, Proportional lots sizing and scheduling with long processing times, Automatyka, 13/2, 315-323, (in Polish).
- [5] MAGIERA M., 2008, Method of assembly scheduling for just in time production systems, Przegląd Mechaniczny 12, 33-37, (in Polish).
- [6] HAQ A., JAYPRAKASH J., RENGARAJAN K., 2006, A hybrid genethic algorithm approach to mixed-modelassembly line balancing, The International Journal of Advanced Manufacturing Technology, Volume 28, Numbers 3-4, 337-341.
- [7] GRZECHCA W., 2007, Re-balance of assembly line. Biuletyn WAT, LVI, 305-315, (in Polish).
- [8] GRZECHCA W., 2011, Two – criterion assembly line balancing problem, Logistyka 2, 199-210, (in Polish).
- [9] GOKCEN H., AGPAK K., BENZER R., 2006, Balancing of parallel assembly lines, International Journal of Production Economics, 103, 600-609.
- [10] ZEMCZAK M., 2011, Case study: Production orders scheduling in multiversion and multiassortment production systems – Part I, Selected Engineering Problems Seminary, Gliwice, 379-384.
- [11] UCHROŃSKI M., 2011, Scheduling algorithms for flexible manufacturing systems – a review, Komputerowo Zintegrowane Zarządzanie, Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją, Opole, 455-461, (in Polish).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-4454d46e-1697-4583-ab94-26072e1123b7