PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Identification of Risk Factors in Water Supply and Sewage Projects

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
An investment project as an undertaking for the future, more or less foreseeable, is a priori encumbered with the possibility of occurrence of disturbances. In recent years there have appeared significant changes in the scope of execution of construction projects, connected with the investment execution time, manner of financing, investors, and the environment in which the given project is executed. That fact determines the need, or even the necessity, to conduct the research into the issues of risk assessment and its utilitarian aspects. That problem applies also to construction projects, including water supply and sewage projects. An example of the project with all kinds of threats characteristic of such types of investments is the project entitled “Complex protection of the underground waters in the Kielce agglomeration.” The risk factors result from the complexity and specificity of that type of projects. The presented article is an introduction to the discussion on the issues of assessing the risk of execution of water supply and sewage projects. The intention of the authors was to present the specificity of that type of projects and the general identification of the risk factors accompanying them. Keywords: risk management, project management, construction management, civil engineering.
Słowa kluczowe
Rocznik
Strony
97--104
Opis fizyczny
Bibliogr. 19 poz., rys., tab.
Twórcy
autor
  • Jan Kochanowski University, Poland
autor
  • The Polish Academy of Sciences, Poland
autor
  • The International University of Logistics and Transport in Wroclaw, Poland
Bibliografia
  • [1] Arn, D., Friedrich U. (1994). „Gemeideverbindungen in der Agglomeration“. Zurich.
  • [2] Directive, (1991). Council Directive 91/271/EEC of 21 May 1991 concerning urban wastewater treatment.
  • [3] Gładysz, B., Kuchta, D., Skorupka, D., & Duchaczek, A. (2015). Fuzzy analysis of project duration in situations of risk. In proceedings of the international conference on numerical analysis and applied mathematics 2014 (ICNAAM-2014) (Vol. 1648, p. 600003). AIP Publishing.
  • [4] Hashemi, H., Mousavi, S., Tavakkoli-Moghaddam, R., and Gholipour, Y. (2013). ”Compromise Ranking Approach with Bootstrap Confidence Intervals for Risk Assessment in Port Management Projects.” Journal of Management Engineering, 29(4), 334–344.
  • [5] Kapliński, O., Janusz, L. (2006). “Three phases of multifactor modelling of construction processes”, Journal of Civil Engineering and Management, 12(2), 127-134
  • [6] Kasprowicz, T. (2000), “Cost-time scheduling of construction works execution”, J. Infrastructure Planning and Management, 660 (IV-49).
  • [7] Knight, F. H. (1921). “Risk, Uncertainty and Profit”, University of Boston Press, Boston.
  • [8] Legal Act, (1994). The Act of 7 July 1994 on Construction Law (Official Journal of Laws 1994 No. 89 item 414) [in Polish].
  • [9] Legal Act, (2001). The Act of 18 July 2001 on Water resources law (Official Journal of Laws 2001 No. 115 item 1229) [in Polish].
  • [10] Połoński, M. (2006). “The analysis of the reliability of realization cost and investments, time-limits in Warsow”. Electronic Journal of Polish Agricultural Universities Topic Civil Engineering, 9(4), #10.
  • [11] Pfeffer, J. (1956). “Insurance and Economic Theory”, Irvin Inc., Homewood, Illinois.
  • [12] Presentation (2012). Kielce Waterworks. Presentation “Project I and II + VIII Competition” April 2012. [In Polish]
  • [13] Sean, T., Regan (2003). “Risk Management Implementation and Analysis”, 2003 AACE International Transaction, (CSC.10.1– CSC.10.7), The Association for the Advancement of Cost Engineering, USA, Orlando
  • [14] Skorupka, D. (2006). “Modelling of risk in the building projects”, Operations Research and Decisions, Wroclaw University of Technology, 3, 133- 143
  • [15] Skorupka, D. (2008). “Identification and initial risk assessment of construction projects in Poland”. Journal of Management in Engineering, 24 (3), 120-127.
  • [16] Skorupka, D. (2012). “Method of Construction Projects Risk Assessment. Mocra”, LAP LAMBERT Academic Publishing GmbH & Co. KG, Saarbrűsken, Germany.
  • [17] Skorupka, D., Korona J. (2014), “Water-sewage management in the agglomeration of Kielce - the evolution of concept”, Research Papers of Wrocław University of Economics, 353, 292-300, [In Polish]
  • [18] Sobotka, A., Czarnigowska, A. (2005). “Analysis of supply system models for planning construction project logistics”, Journal of Civil Engineering and Management, 11(1), 73-82
  • [19] Willet, A.H. (1951). “The Economic Theory of Risk Insurance”, University of Pennsylvania Press, Philadelphia.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-3cc75346-c3a4-4fc1-8ed9-fd307795c84b
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.