Research on launching technology of shield tunnel in Ho Chi Minh Metro line 1

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The use of subway tunnel engineering technology has become more professional and refined with the growth of society and the advancement of science and technology. The initial construction process of a subway tunnel shield is the most critical part of the entire engineering system. Shield launching period construction is the most prone to accidents in the shield construction process, directly related to the smooth through the shield tunnel. The line 1 of Ho Chi Minh (HCM) Metro is the first subway line, the full length of 19.7 km, the underground road length of 2.6 km from km 0 + 615 to km 2 + 360, from Ben Thanh market, and then through the Sai Gon river and 14 station (including 3 underground stations and 11 elevated stations), reach Suoi Tien park and is located in Long Binh area station, underground building blocks including Ben Thanh market station to Opera House station interval, Opera House station, Opera House station to Ba Son station interval. This paper selects Shield launching period of Opera House station to Ba Son shaft interval as an example, analyze the key construction technology, construction control parameters and launching considerations of shield machine.
Twórcy
  • Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan, Hubei, P.R. China
autor
  • Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan, Hubei, P.R. China
  • FECON UCC., Hanoi city, Vietnam
  • FECON UCC., Hanoi city, Vietnam
  • FECON UCC., Hanoi city, Vietnam
  • FECON, Hanoi city, Vietnam
Bibliografia
  • 1. Yue Cheng-huan. Construction technology of subway tunnel shield launching [J]. Value engineering, 2020 (2).
  • 2. Liu Ling-yun, Yang De-lei, Guo Hai-zhu. Risk analysis of tunnel shield machine driving-in and driving-out construction process in tunnelling engineering [J]. Cryogenics Construction Technology, 2010(08): 51-53.
  • 3. Qiao Jingshun, Yang Delei, Liu Huawei, et al. Risk analysis of tunnel shield machine driving-in and driving-out construction process in Zhengzhou subway engineering [C]. Chinese perspective on risk analysis and crisis response (RAC-2010), 2010.
  • 4. Liu Jianjun. Risk evaluation and control for construction of shield tunnel engineering in Ningbo rail transit [D]. Zhejiang University of Technology, 2013.
  • 5. Zhao Yunchen. Summarization of shield launching and arrival methods [J]. Modern Tunnelling Technology, 2008, (S1): 86-90.
  • 6. https://en.wikipedia.org/wiki/Ho_Chi_Minh_City_Metro
  • 7. https://www.railway-technology.com/projects/vietnammetro/
  • 8. Roberto González Barquilla. Simulación del Sistema CBTC en la Línea 1 de Metro de Ho Chi Minh, 2011.
  • 9. Nguyen Trung Hieu, Pham Huy Giao, Noppadol Phien-wej. Tunneling induced ground settlements in the first metro line of Ho Chi Minh City, Vietnam. In: Duc Long P., Dung N. (eds) Geotechnics for Sustainable Infrastructure Development, 297-304, 2020.
  • 10. Minoru Kuriki. Design and construction of first bored tunnel under Ho Chi Minh City Metro Line 1 in Vietnam. In: Duc Long P., Dung N. (eds) Geotechnics for Sustainable Infrastructure Development, 221-228, 2020.
  • 11. Nguyen Tang Thanh Binh, Tran Nguyen Hoang Hung. Applying jet grouting to reinforce the metro line no.1 in Ho Chi Minh city, 2013.
  • 12. Hoang-Hung Tran-Nguyen, Binh T.T. Nguyen. Effect of Soilcrete Characteristics on Surface Settlement during Tunneling in Vietnam, 2012.
  • 13. Phan Sy Liem. Using jet grouting to reinforced soid mass surrounding the tunnel and protect the construction foundation in metro line 1, 2017.
  • 14. Nguyen Van Thanh. Numerical analysis on benifit of jet grouting to control ground settlement in tunneling in soft ground of Ho Chi Minh subway line No.1, 2013.
  • 15. ASTM D2166: Standard Test Method for Unconfined Compressive Strength of Cohesive Soil.
  • 16. ASTM D5084: Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter.
  • 17. Zhu Hong-wei. Compare on Reinforce Technology of the End in Ke-Da Shield Section [J]. Road construction machinery and construction mechanization, 2007, 24(008): 50-51.
  • 18. Sun Zhenchuan. The technique of stratum strengthening the End of soft soil section of urban subway shield method tunneling [J]. West - China exploration engineering, 2003 (10): 84-86.
  • 19. Zhenjiang H, Jinfeng L. Application of High-pressure Spraying Pile on Strengthening of Portal Parts on Shield Construction [J]. Construction Technology, 2009.
  • 20. Zhenjiang H, Shanglian L. Soil Strengthening Technology with Tube Well Dewatering in Shield Beginning Segment [J]. Construction Technology, 2009.
  • 21. Yuan Xijun. Precipitation technology for the origin and arrival of the silt-sand stratum Shield [J]. Research on Urban Construction Theory: Electronic Edition, 2013, 000(012):1-4.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-3c4a4f15-d213-4591-bc8d-3be661d9678d
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.