A numerical example of total production maintenance and robust scheduling application for a production system efficiency increasing

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
In the paper, the proposition of application of two methodologies: the predictive scheduling and Total Productive Maintenance - TPM to increase efficiency of a production system is presented. In this paper, an example of problem of predicting a time of a bottle neck failure is presented. Using the Statistica program, histograms that show the graphical relationship of a number of observations and failure-free times of the bottle neck for historical periods are created. The fitting of the histograms to the theoretical distributions: normal, exponential, gamma and Weibull using appropriate tests (for example the Kolmogorov-Smirnov test for normal distribution) is researched. After finding distribution and setting parameters for historical periods, for the next scheduling horizon values of parameters are extrapolated using the regression method in the Statistica program. For the bottle neck various reliability characteristics are computed. Having the Mean Time To Failure (MTTF) and Mean Time of Repair (MTTR) of the bottle neck, robust schedule is generated. At the time of the predicted failure, preventive actions and technical survey of the machine are scheduled. The production system is modeled in the simulation program - Enterprise Dynamics 8.1.
Rocznik
Strony
62--79
Opis fizyczny
Bibliogr. 5 poz., tab., rys.
Twórcy
autor
  • Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Poland
autor
  • Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Poland
Bibliografia
  • [1] PAPROCKA I., KEMPA W., Modeling and simulation of the production system in order to obtain a stable schedule,, Part I, (in print).
  • [2] PAPROCKA I., SKOŁUD B., 2012, Robust scheduling, a production scheduling model of failures, article accepted for printing in materials of International Conference on Mechatronics and Computational Mechanics, ICMCM.
  • [3] SKOŁUD B., 2006, Operational management. Production in small and medium-sized enterprises, Silesian University of Technology, Gliwice, (in Polish).
  • [4] WOSIK I, SKOŁUD B., 2011, Predictive scheduling based on knowledge acquired from frequency of machine work disturbance, Journal of Machine Engineering, 11/1-2, 54-67.
  • [5] Online Manual on Statistics, http://www.statsoft.pl/textbook/stathome.htm
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-3a5fbab2-8297-44e5-864a-5a12da574073
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.