Safe operation of buildings during the winter period

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Purpose: The article presents legal regulations and principles for the safe operation of buildings in winter and proposes a procedure for clearing snow from flat roofs. Findings: The Construction Law regulates the activities involving building design, construction, maintenance, and demolition and defines the operation principles of public administration bodies in these areas. Research limitations/implications: The safety of buildings in the winter requires specialist knowledge and special care on the part of managers, employers, persons managing employees, and employees performing work related to their safe operation. Practical implications: The safe removal of snow from flat roofs requires adequate legal knowledge, skills, training, and experience on the part of employers, managers, and workers. The employer's most important obligations to employees in the case of snow clearance work on flat roofs (tantamount to work at height) include providing them with protective equipment appropriate to their position and tasks, with collective protective equipment. The employer is obliged to ensure that persons who carry out work at height are assisted by other employees who do not carry out such work directly. The employer should also ensure that workers receive instruction, taking into account, in particular, the personal division of work, the sequence of tasks to be performed, and the health and safety rules necessary for the various activities. It is also necessary to establish supervision of work at height. Originality/value: Employees carrying out snow clearing should have a current height examination and hold a valid (current) medical certificate of no contraindication to work at height. The employee must also receive health and safety training prior to working at height, as well as an introduction to the specifics of the job, know the potential hazards and risks, and learn to use the personal protective equipment required for the job properly.
Rocznik
Strony
36--41
Opis fizyczny
Bibliogr. 33 poz., rys., tab.
Twórcy
autor
  • Institute of Safety Engineering of Anthropogenic Objects, Construction Expertise Centre, ul. Obozowa 82A/19, 01-434 Warsaw, Poland
autor
  • Faculty of Civil Engineering and Geodesy, Military University of Technology, ul. gen. Sylwestra Kaliskiego 2, 00-908 Warsaw, Poland
autor
  • Institute of Safety Engineering, Main School of Fire Service, ul. Słowackiego 52/54, 01-629 Warsaw, Poland
Bibliografia
  • [1] Dictionary of the Polish Language, PWN, Warsaw, 1978 (in Polish).
  • [2] A. Baryłka, J. Baryłka, Exploitation process of construction objects, Publishing House of the Building Expertise Center, Warsaw, 2015 (in Polish).
  • [3] Constitution of the Republic of Poland, 1997 (in Polish).
  • [4] Act of 7 July 1994. - Construction Law (in Polish).
  • [5] Chief Labour Inspector's Report 2018 (in Polish).
  • [6] PN-80/B-02010. Loads in static calculations. Snow load. With later changes included in PN-80/B02010/Az1:2006 (in Polish).
  • [7] PN-82/B02000. Structure loads. Valuation Principles (in Polish).
  • [8] GUNB, Communication to building owners and managers in relation to potential winter hazards, 2021 (in Polish).
  • [9] W. Ryżyński, Ways of monitoring snow load and ways of its removal, Flat Roofs 4/9 2010 (in Polish).
  • [10] A. Sobolewski, J. Żurawski, Models of the snow load on roofs, Building Research Institute - Quarterly 2(154) (2010) 3-21 (in Polish).
  • [11] J. Żurawski, A. Sobolewski, Snow load in Poland, ITB, Warsaw, 2009 (in Polish).
  • [12] J.A. Żurawski, A. Sobolewski, Snow load in Poland in the design and diagnostics of structures, Series: Scientific works of the Building Research Institute - Monographs, 2016 (in Polish).
  • [13] A. Szymczak-Graczyk, Snow load and the safety of use of buildings, Research and Teaching Equipment 17/4 (2012) 57-62 (in Polish).
  • [14] Decree of the Council of Ministers of 28.05.1996 on prophylactic meals and drinks (in Polish).
  • [15] Act of 13 September 1996 on Maintaining Cleanliness and Order in Municipalities (in Polish).
  • [16] A. Repelewicz, K. Regulska, Roofs: geometry and construction, Publishing House of the Częstochowa University of Technology, Czestochowa, 2004 (in Polish).
  • [17] PN-89/B-10425. Smoke, flue and ventilation ducts made of brick. Technical requirements and acceptance tests (in Polish).
  • [18] Regulation of the Minister of Infrastructure of 2 September 2004 on the detailed scope and form of the design documentation, technical specifications for the execution and acceptance of construction works and the functional-utility programme (in Polish).
  • [19] Health and safety in roof work, HSG33, Third Edition, HSE Books, UK, 2008.
  • [20] K. Baszczyński, Work safety on roofs, Occupational Safety - Science and Practice 2 (2006) 2-4 (in Polish).
  • [21] K. Baszczyński, Construction, basic requirements and test methods of anchoring devices enabling movement of a worker at workstations at height, Occupational Safety - Science and Practice 2 (2016) 13-17 (in Polish).
  • [22] Managing health and safety in construction. Construction (Design and Management) Regulations 2007, Approved Code of Practice, L144, HSE Books, UK, 2007.
  • [23] J. Obolewicz, Work safety in construction, Unimedia Publishing House, Warsaw, 2012 (in Polish).
  • [24] J. Obolewicz, Demoscopy of safety and health protection of construction enterprises, Published by Publishing House of the Bialystok University of Technology, Białystok, 2018 (in Polish).
  • [25] J. Obolewicz, Operation of building structures in winter - snow removal from flat roofs of buildings, OHS Promoter 12 (2019) 32-37 (in Polish).
  • [26] J. Obolewicz, Shovelling snow from roofs: Safety through prevention or suffering the consequences of accidents?, Work and Health 10 (2011) 18-39 (in Polish).
  • [27] J. Obolewicz, Safe construction buildings in urban construction, Space and Form 34 (2018) 57-68. DOI: https://doi.org/10.21005/pif.2018.34.B-01
  • [28] J. Obolewicz, Maintenance of building structures in winter, Work and Health 1-2 (2014) 8-13 (in Polish).
  • [29] J. Obolewicz, Winter on the construction site, Work and Health 11 (2013) 18-24 (in Polish).
  • [30] PN-EN 13374+A1:2019. Temporary edging protection systems - Product technical description, test methods.
  • [31] PN-EN 795:2012. Protection against falls from a height. Anchor devices
  • [32] Regulation of the Minister of the Economy of 21 December 2005 on the essential requirements for personal protective equipment (in Polish).
  • [33] Act of 26 June 1974 - Labour Code (in Polish).
Uwagi
PL
Opracowanie rekordu ze środków MNiSW, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2024).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-39e26025-45a3-452a-a9b0-fdc9ecde902c
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.