Application of the theory of constraints for project management

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The large variability of internal and external factors is a serious problem hampering production management. To meet the standards and at the same time ensure the viability of production it is necessary to quickly respond to problems that arise during production processes, and to adequately correct plans. Measures taken in the management of madetoorder production are frequently single and unique, and therefore resemble the features of project management. The paper discusses the project management method derived from the theory of constraints – CCPM. The paper describes an original algorithm for CCPM implementation and presents the results of success CCPM implementation in a company from the Wielkopolska region. The implementation of CCPM resulted in improved timeliness of order delivery, improved communication and standardization of processes related to order delivery.
Twórcy
  • Poznan University of Technology, Chair of Management and Production Engineering, Piotrowo 3, 60-965 Poznan, Poland
autor
  • Poznan University of Technology, Chair of Management and Production Engineering, Poland
Bibliografia
  • [1] Santos A.S., Varela M.L.R., Putnik G.D., Alternative Approaches Analysis for Scheduling in an Extended Manufacturing Environment, IEEE Conference: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC 2014), pp. 97–102, 2014.
  • [2] Vieira G., Reis L., Varela M.L.R., Machado J., Trojanowska J., Integrated Platform for Real-time Control and Production and Productivity Monitoring and Analysis, Romanian Review Precision Mechanics, Optics and Mechatronics, 50, 119–127, 2016.
  • [3] Varela M.L.R., Putnik G.D., Technologies Integration for Distributed Manufacturing Scheduling in a Virtual Enterprise, [in:] 1st International Conference on Virtual and Networked Organizations Emergent Technologies and Tools (ViNOrg 2011), Communications in Computer and Information Science, Putnik, GD; Cruz-Cunha, MM [Ed.], 248, 337– 347, 2012.
  • [4] Kujawińska A., Vogt K., Wachowiak F., Ergonomics as Significant Factor of Sustainable Production, [in:] Technology management for sustainable production and logistics, Golinska P., Kawa A. [Eds.], pp. 193– 203, 2015, DOI: 10.1007/978-3-642-33935-6 10.
  • [5] Weiss Z., Diakun J., Dostatni E., Design management in virtual intranet environment, [in:] International Conference on Cybernetics and Information Technologies, Systems and Applications and 10th International Conference on Information Systems Analysis and Synthesis, Aguilar J., Ferrer J., et al. [Eds.], Orlando, Vol. 3, Proceedings, pp. 253–256, 2004.
  • [6] Sabahudin J., Diering M., Brdarevic S., Opinions of the consultants and certification houses regarding the quality factors and achieved effects of the introduced quality system, Tehnicki Vjesnik-Technical Gazette, 19, 2, 211–220, 2012.
  • [7] A Guide to the Project Management Body of Knowledge, PMI, USA 2012.
  • [8] Cox J.F., Schleier J.G., Theory of Constraints. Handbook, McGraw-Hill Companies, US, 2010.
  • [9] Kastor A., Sirakoulis K., The effectiveness of resource levelling tools for resource constraint project scheduling problem, International Journal of Project Management, 27, 5, 493–500, 2009.
  • [10] Hall N.G., Project management: Recent developments and research opportunities, Journal of Systems Science and Systems Engineering, 21, 2, 129– 143, 2012.
  • [11] Goldratt E.M., Critical Chain, Great Barrington, MA: North River Press, 1997.
  • [12] Trojanowska J., Koliński A., Kolińska K., Using of Throughout Accounting in Manufacturing Companies – case studies, Management and Production Engineering Review, 2, 1, 58–65, 2011.
  • [13] Trojanowska J., Pająk E., Using the Theory of Constraints to Production Processes Improvement, Proceedings of the 7th International Conference of DAAAM Baltic Industrial Engineering, Kyttner R. [Ed.], Tallin, Estonia, 1, 322–327, 2010.
  • [14] Hamrol A., Strategies and practices of efficient operation. LEAN SIX SIGMA and other [in Polish], PWN, Warsaw, 2015.
  • [15] Şimşita Z.T., Sebla Günayb N.S., Vayvayc Ö., Theory of Constraints: a Literature Review, 10th International Strategic Management Conference 2014, Procedia – Social and Behavioral Sciences, 150, 930– 936, 2014.
  • [16] Dettmer H.W., Goldratt’s Theory of Constraints: a Systems Approach to Continuous Improvement, ASQ Quality Press, Milwaukee, WS, 1997.
  • [17] Goldratt E.M., Cox J., The Goal: Excellence In Manufacturing, North River Press, New York, 1984.
  • [18] Dugdale D., Jones C.T., Throughput Accounting: Transforming Practices?, The British Accounting Review, 30, 3, 203–220, 1998.
  • [19] Woeppel M.J., The manufacturer’s guide to implementing the theory of constraints, St. Lucie Press, Boca Raton, Florida, 2001.
  • [20] Cyplik P., Adamczak M., Hadaś Ł., Critical chain project management and drum-buffer-rope tools integration in construction industry – case study, LogForum, 8, 1, 29–37, 2012.
  • [21] Goldratt E.M., The Goldratt Webcast Series: Critical Chain Project Management, Roelofarendsveen, The Netherlands: Goldratt Marketing Group, 2008.
  • [22] Watson K.J., Blackstone J.H., Gardiner S.C., The evolution of a management philosophy: the theory of constraints, Journal of Operations Management, 25, 387–402, 2007.
  • [23] Steyn H., Nicholas J.M., Project Management for Business, Engineering and Technology, Reed Elsevier India private limited, pp. 240–269, 2008.
  • [24] Ravalji J.M., Deshpande V.A., Comparative Study of Alternatives for 50% Rule in Critical Chain Project Management, Vivek A Deshpande, International Conference on Design, Manufacturing and Mechatronics Organized by KJEI’s Trinity College of Engineering and Research, Pune, 9–10 January, 2014.
  • [25] Rozenes S., Vitner G., Spraggett S., Project control: Literature review, Project Management Journal, 37, 4, 5–14, 2006.
  • [26] Patrick F.S., Critical chain scheduling and buffer management: getting out from between Parkinson’s rock and Murphy’s hard place, pp. 1–6, 1998, http://www.focusedperformance.com/articles/ccpm.html, accessed July 31, 2016.
  • [27] Goldratt E.M., Eshkoli I., BrownLeer J., Isn’t It Obvious?, Revised Edition, The North River Press, USA, 2009.
  • [28] Geekie A., Steyn H., Buffer sizing for the critical chain Project management metod, The South African Journal of Industrial Engineering, 19, 1, 73–88, 2008.
  • [29] Leach L.P., Critical chain project management, 2nd edition, Artech House, Inc., Norwood MA, 2005.
  • [30] Łopatowska J., Application of the Theory of Constraints to scheduling tasks in single and multiproject environment [in Polish], Logistyka, 2, 1–15, 2009.
  • [31] Arrais-Castro A., Varela M., Putnik G., Ribeiro R., Dargam F., Collaborative negotiation platform using a dynamic multi-criteria decision model, International Journal of Decision Support System Technology, 7, 1, 1–14, 2015, DOI: 10.4018/ijdsst.2015010101.
  • [32] Diering M., Hamrol A., Kujawińska A., Measurement system analysis Combined with Shewhart’s Approach, Key Engineering Materials, Vol. 637, pp. 7–11, 2015, c Trans Tech Publications, Switzerland, DOI: 10.4028/www.scientific.net/KEM.637.7.
  • [33] Kujawińska A., Rogalewicz M., Diering M., Application of expectation maximization method for purchase decision-making support in welding branch, Management and Production Engineering Review, 7, 2, 29–33, 2016, DOI: 10.1515/mper-2016-0014.
  • [34] Kujawińska A., Rogalewicz M., Diering M., Hamrol A., Statistical Approach to Making Decisions in Manufacturing Process of Floorboard, [in:] Rocha Á., Correia A., Adeli H., Reis L., Costanzo S. [Eds.], Recent Advances in Information Systems and Technologies. WorldCIST, Advances in Intelligent Systems and Computing, Springer, 571, 499–508, 2017.
  • [35] Bożek M., Kujawińska A., Rogalewicz M., Diering M., Gościniak P., Hamrol A., Improvement of catheter quality inspection process, MATEC Web of Conferences 121, 05002, 2017, 8th International Conference on Manufacturing Science and Education – Trends in New Industrial Revolution, DOI: https://doi.org/10.1051/matecconf/201712105002.
  • [36] Leão C.P., Soares F.O., Machado J.M., Seabra E., Rodrigues H., Design and development of an industrial network laboratory, International Journal of Emerging Technologies in Learning (Special Issue) 6, 2, 21–26, 2011, DOI: 10.3991/ijet.v6iS1.1615.
  • [37] Silva M., Pereira F., Soares F., Leão C.P., Machado J., Carvalho V., An overview of industrial communication networks, Mechanisms and Machine Science, 24, 933–940, 2015, DOI: 10.1007/978-3-319-09411- 3 97.
  • [38] Vieira G., Varela M., Putnik G., Machado J., An integrated framework for supporting fuzzy decisionmaking in networked manufacturing environments, Romanian Review Precision Mechanics, Optics and Mechatronics, 48, 85–91, 2015.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-3868c700-aeac-459e-90ae-3846b77aac94
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.