PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Research on project cost control of construction engineering contracting enterprises based on owner satisfaction in China

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The profit margin of construction enterprises has been continuously declining over the past few years, and the competition for contracts among construction enterprises turns out to be increasingly fierce. Construction contracting enterprises should consider the profitability of the construction contracting enterprise and its ability to continuously obtain orders when setting cost budget targets for project management departments. Thus, a dual objective decision-making model is built in this study, minimizing overall construction costs and maximizing owner satisfaction to clarify the contracting conditions of the project management department and facilitate decision-making optimization of cost and owner satisfaction goals. Moreover, the actual effect of the proposed model method is verified through case calculations. As indicated by the results, under the premise of maximizing owner satisfaction, the model optimization cost is lower than the actual cost that has already occurred. Furthermore, it conforms to the goal of maximizing owner satisfaction while fulfilling the goal of minimizing engineering costs.
Rocznik
Strony
635--647
Opis fizyczny
Bibliogr. 34 poz., rys., tab.
Twórcy
autor
  • School of Civil Engineering and Architecture, Anyang Normal University, Anyang 455000, China
Bibliografia
  • [1] B.-G. Hwang, M. Shan, L. Zhu, and W.-C. Lim, “Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons”, International Journal of Construction Management, vol. 20, no. 5, pp. 437–449, 2020, doi: 10.1080/15623599.2018.1484976.
  • [2] T.C. Keng and W.M.A.W. Adzhar, “Construction cost control for road projects in the context of Malaysian contractors”, Journal of Architecture, Planning and Construction Management, vol. 12, no. 2, pp. 85–97, 2022, doi: 10.31436/japcm.v12i2.722.
  • [3] R.P. Akhil and B.B. Das, “Cost reduction techniques on mep projects”, in Sustainable construction and building materials. Springer, 2019, pp. 495–517.
  • [4] B. Perera, C. Perera, and C. Jayalath, “Contractor’s perspective on key performance indicators of cost control in Asian, Middle Eastern, and European construction projects”, International Journal of Construction Education and Research, vol. 18, no. 3, pp. 217–233, 2022, doi: 10.1080/15578771.2020.1842567.
  • [5] A.Y. Bahaudin, E.M. Elias, H. Dahalan, and R. Jamaluddin, “Construction cost control: A review of practices in Malaysia”, in Proceedings of the The 3rd International Conference on Technology and Operation Management (ICTOM), Bandung, Indonesia. 2012, pp. 4–6, doi: 10.13140/RG.2.1.3951.8560.
  • [6] Y. Olawale and M. Sun, “Construction project control in the UK: Current practice, existing problems and recommendations for future improvement”, International Journal of Project Management, vol. 33, no. 3, pp. 623–637, 2015, doi: 10.1016/j.ijproman.2014.10.003.
  • [7] S.N. Malkanthi, A.G.D. Premalal, and R.K.P.C.B. Mudalige, “Impact of cost control techniques on cost overruns in construction projects”, Engineer: Journal of the Institution of Engineers, Sri Lanka, vol. 50, no. 4, 2017, doi: 10.4038/engineer.v50i4.7275.
  • [8] Y.A. Olawale and M. Sun, “Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice”, Construction Management and Economics, vol. 28, no. 5, pp. 509–526, 2010, doi: 10.1080/01446191003674519.
  • [9] A. Ashworth and S. Perera, Cost studies of buildings. Routledge, 2015.
  • [10] N. Ostojic-Škomrlj and M. Radujković, “S-curve modelling in early phases of construction projects”, Građevinar, vol. 64, no. 08, pp. 674–654, 2012, doi: 10.14256/JCE.714.2012.
  • [11] R.N. Cardozo, “An experimental study of customer effort, expectation, and satisfaction”, Journal of Marketing Research, vol. 2, no. 3, pp. 244–249, 1965.
  • [12] W.F. Maloney, “Construction product/service and customer satisfaction”, Journal of Construction Engineering and Management, vol. 128, no. 6, pp. 522–529, 2002, doi: 10.1061/(ASCE)0733-9364(2002)128:6(522).
  • [13] W.F. Maloney, “Labor-management cooperation and customer satisfaction”, Journal of Construction Engineering and Management, vol. 129, no. 2, pp. 165–172, 2003, doi: 10.1061/(ASCE)0733-9364(2003)129:2(165).
  • [14] H. Dingxuan andW. Jian, “Experienti al anal ysis on custo mer satisf acti on of constructi on enterprise”, Industrial Engineering and Management, vol. 62, no. 1, pp. 68–72, 2007, doi: 10.19495/j.cnki.1007-5429.2007.01.015.
  • [15] J.-B. Yang and S.-C. Peng, “Development of a customer satisfaction evaluation model for construction project management”, Building and Environment, vol. 43, no. 4, pp. 458–468, 2008, doi: 10.1016/j.buildenv.2006.07.044.
  • [16] S. Kärnä, J.M. Junnonen, and V.M. Sorvala, “Modelling structure of customer satisfaction with construction”, Journal of Facilities Management, vol. 7, no. 2, pp. 111–127, 2009, doi: 10.1108/14725960910952505.
  • [17] L. Fuzhou and X. Peng, “Competitiveness evaluation of construction enterprises based on customers’ satisfaction”, Journal of Engineering Management, vol. 24, no. 2, pp. 215–219, 2010, doi: 10.3969/j.issn.1674-8859.2010.02.022.
  • [18] L. Panyan, “Research of customer relationship management in construction enterprise”, M.A. thesis, Tianjin University, Tianjin, 2010.
  • [19] W. Weidong and W. Shujun, “Customers’ satisfaction degree evaluation of construction firms based on entropy method”, Journal of Engineering Management, vol. 25, no. 5, pp. 591–594, 2011, doi: 10.3969/j.issn.1674-8859.2011.05.024.
  • [20] D.B. Ashley, C. S. Lurie, and E. J. Jaselskis, “Determinants of construction project success”, Project Management Journal, vol. 18, no. 2, pp. 69–79, 1987.
  • [21] A. M. M. Liu and A. Walker, “Evaluation of project outcomes”, Construction Management and Economics, vol. 16, no. 2, pp. 209–219, 1998, doi: 10.1080/014461998372493.
  • [22] Ž. M. Torbica and R. C. Stroh, “Customer satisfaction in home building”, Journal of Construction Engineering and Management, vol. 127, no. 1, pp. 82–86, 2001, doi: 10.1061/(ASCE)0733-9364(2001)127:1(82).
  • [23] S. Korkmaz, D. Riley, and M. Horman, “Piloting evaluation metrics for sustainable high-performance building project delivery”, Journal of Construction Engineering and Management, vol. 136, no. 8, pp. 877–885, 2010, doi: 10.1061/(ASCE)CO.1943-7862.0000195.
  • [24] B.-G. Hwang and X. Zhao, “Review of global performance measurement and benchmarking initiatives”, International Journal of Construction Management, vol. 15, no. 4, pp. 265–275, 2015, doi: 10.1080/15623599.2015.1083410.
  • [25] S. M. Ahmed and R. Kangari, “Analysis of client-satisfaction factors in construction industry”, Journal of Management in Engineering, vol. 11, no. 2, pp. 36–44, 1995, doi: 10.1061/(ASCE)0742-597X(1995)11:2(36).
  • [26] A. N. Farini and A. Nugroho, “Analysis of price fairness toward work quality and user satisfaction for architectural network”, MATEC Web of Conferences, vol. 258, 2019, doi: 10.1051/matecconf/201925802023.
  • [27] J. Choi, S. Yun, F. Leite, and S. P. Mulva, “Team integration and owner satisfaction: Comparing integrated project delivery with construction management at risk in health care projects”, Journal of Management in Engineering, vol. 35, no. 1, 2019, doi: 10.1061/(asce)me.1943-5479.0000654.
  • [28] K. Kawesittisankhun and J. Pongpeng, “Social sustainability: Satisfying owners and communities by multilevel strategies of contractors”, Sustainability, vol. 12, no. 5, 2020, doi: 10.3390/su12052131.
  • [29] G. Ngowtanasuwan, “Factor analysis of service quality of provincial contractors to owner satisfaction in construction projects in Thailand”, IOP Conference Series: Materials Science and Engineering, vol. 829, no. 1, art. no. 012014, 2020, doi: 10.1088/1757-899X/829/1/012014.
  • [30] L. Liang, “Research on influence factors of customer satisfaction in epc project”, M.A. thesis, Tianjin University, Tianjin, 2018.
  • [31] J.-H. Cho and B.-S. Kim, “Determining via the kano model the importance of quality characteristics in construction management”, KSCE Journal of Civil Engineering, vol. 26, no. 6, pp. 2555–2566, 2022, doi: 10.1007/s12205-022-1830-6.
  • [32] J. Sobieraj, D. Metelski, and P. Nowak, “PMBoK vs. PRINCE2 in the context of Polish construction projects: Structural equation modelling approach”, Archives of Civil Engineering, vol. 67, no. 2, pp. 551–579, 2021, doi: 10.24425/ace.2021.137185.
  • [33] M. Mingxing, “Analysis of factors affecting cost of prefabricated houses and research on control measures”, M.A. thesis, North China University of Technology, 2022.
  • [34] M.F. Hasan and S.R. Mohammed, “Factors affecting time and cost trade-off in multiple construction projects”, Archives of Civil Engineering, vol. 68, no. 2, pp. 549–561, 2022, doi: 10.24425/ace.2022.140658.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2024).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-35e5951d-60d7-4e09-988b-cd02ca974ceb
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.