Tytuł artykułu
Autorzy
Treść / Zawartość
Pełne teksty:
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
The article presents the construction of an inter-level shaft between levels II lower and level III and equipping it with a transport system. The purpose of the project was to provide transport of loose materials and long items from level III to level II lower, which was necessary to secure the mining excavations. Before the investment, only a limited amount of materials could be transported manually by means of ramps.
Słowa kluczowe
Wydawca
Rocznik
Tom
Strony
33--38
Opis fizyczny
Bibliogr. 4 poz., rys., zdj.
Twórcy
autor
- Kopalnia Soli "Wieliczka" S.A., ul. Daniłowicza 10, 32-020 Wieliczka, Poland
autor
- Kopalnia Soli "Wieliczka" S.A., ul. Daniłowicza 10, 32-020 Wieliczka, Poland
autor
- KAZ Serwis sp. z o.o., ul. Jasna 31B, 44-122 Gliwice, Poland
Bibliografia
- [1] Project no. KDT 16/KAZ-05: Starting material transport in the Schwind shaft from level III to level II lower [unpublished].
- [2] Operation and maintenance documentation no. KDT 14/KAZ-13/2: Low-speed drum winch KAZ-WWB 30, 2015 [unpublished].
- [3] Technical design of the shaft and facilities from level II upper to level II lower. Project no. 31022, 2018 [unpublished].
- [4] Zuski Z., Gregorek K.: Advantages of composites shaft reinforcement, School of Underground Exploitation, Krakow 2020.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2020).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-2ba58634-bc01-4d25-978d-a5054ee3fda4