PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

A criteria- and case study-based approach to evaluate adaptability in buildings

Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Buildings may become functionally obsolete before they reach the end of their service life due to changing social, economic, and technological contexts. A building may undergo one or more transformations during its service life since decreased utility, vacancy, or demolition are not economically, socially, culturally, or environmentally viable options. Buildings with adaptable capacities offer effective solutions for responding to change and creating a sustainable built environment. The present study sought to clarify concepts related to adaptable architecture and develop a criteria-based evaluation approach to assess adaptability parameters in existing buildings. A criteria set was developed based on the literature to define adaptability strategies and parameters and their interconnected spatial, functional, and structural relationships that facilitated change. The magnitude of potential change was weighted and converted to adaptability scores. The adaptability evaluation criteria set was used to assess the adaptability scores of several architectural examples and the findings indicated that the criteria set could be used as both a quantitative and a qualitative evaluation tool.
Rocznik
Strony
1--32
Opis fizyczny
Bibliogr. 114 poz.
Twórcy
autor
  • Research Assistant; Department of Architecture, Faculty of Architecture and Design, Atatürk University, 25030 Yakutiye, Erzurum, Turkey
  • Associate Prof. Dr.; Department of Architecture, Faculty of Engineering and Architecture, Eskisehir Osmangazi University, 26040 Odunpazari, Eskisehir, Turkey
Bibliografia
  • [1] Kincaid, D. (2002). Adapting Buildings for Changing Uses: Guidelines for Change of Use Refurbishment, Routledge.
  • [2] Russell, P., & Moffatt, S. (2001). Assessing the Adaptability of Buildings: Energy-Related Environmental Impact of Buildings, IEA Annex 31. Retrieved from https://www.iea-ebc.org/Data/publications/EBC_Annex_31_Assessing_Building.pdf
  • [3] Fernandez, J. (2003). Design for change: Part 1: Diversified lifetimes. Arq: Architectural Research Quarterly, 7(2), 169-182.
  • [4] Eguchi, T., Schmidt III, R., Dainty, A., Austin, S., & Gibb, A. (2010). The design of adaptable buildings in Japan, 16th International Conference on Open and Sustainable Building jointly organized by CIB W104-Open Building Implementation and TECNA- LIA, Bilbao, Spain.
  • [5] Schmidt III, R., Eguchi, T., Austin, S., & Gibb, A. (2010). What Is the Meaning of Adaptability in the Building Industry? In Proceedings of the 16th International Conference on Open and Sustainable Buildings, Bilbao, Spain, 17-19 May 2010; 227-236.
  • [6] Geraedts, R. P. (2008). Design for Change; Flexibility Key Performance Indicators, I3CON Conference, Loughborough, May 2008.
  • [7] Heath, T. (2001). Adaptive re-use of offices for residential use: The experiences of London and Toronto, Cities, 18(3), 173-184.
  • [8] Yilmaz, M., & Bakiş, A. (2015). Sustainability in construction sector. Procedia-Social and Behavioral Sciences, 195, 2253-2262.
  • [9] Rem0y, H., & van der Voordt, T. (2014). Adaptive reuse of office buildings into housing: opportunities and risks. Building Research & Information, 42(3), 381-390.
  • [10] Kendall, S. (1999). Open Building: An Approach to Sustainable Architecture. Journal of Urban Technology, 6(3), 1-16.
  • [11] Adaptable Futures. (2021). Retrieved from http://adaptablefutures.com/.
  • [12] Douglas, J. (2006). Building adaptation. 2nd Edition, Butterworth-Heinemann, Oxford, UK.
  • [13] Nakib, F. (2010). Toward an adaptable Architecture guidelines to integrate adaptability in the building, Building a Better World: CIB World Congress 2010, The Lowry, Salford Quays, UK.
  • [14] Manewa, A., Siriwardena, M., Ross, A., & Madanayake, U. (2016). Adaptable buildings for sustainable built environment. Built Environment Project and Asset Management, 6(2).
  • [15] Keymer, M. A. (2000). Design strategies for new and renovation construction that increase the capacity of buildings to accommodate change. Doctoral dissertation, Massachusetts Institute of Technology.
  • [16] Pinder, J., Schmidt, R., & Saker, J. (2013). Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(5), 440-459.
  • [17] MacCreanor, G. (1998). Adaptability. a+ t-Housing and Flexibility, 40-45.
  • [18] Stewart, K. M. (1997). Evaluating End-of-life Strategies for Decommissioned Semiconductor Facilities. Master Thesis, Massachusetts Institute of Technology.
  • [19] Slaughter, E. S. (2001). Design strategies to increase building flexibility. Building Research & Information, 29(3), 208-217.
  • [20] Lemer, A. C. (1996). Infrastructure Obsolescence and Design Service Life, Journal of Infrastructure Systems, 1 (1), 153-161.
  • [21] Graham, P. (2005). Design for adaptability - an introduction to the principles and basic strategies, Environment Design Guide. Centre for a Sustainable Built Environment, UNSW, 1-9.
  • [22] Schnadelbach, H. (2010). Adaptive architecture-a conceptual framework. proceedings of Geelhaar, J., Eckardt, E, Rudolf, B., Zierold, S, and Markert, M. (Eds.), MediaCity: Interaction of Architecture, Media and Social Phenomena, Weimar, Germany, 523-555.
  • [23] Pinder, J. A., Schmidt III, R., Austin, S. A., Gibb, A., & Saker, J. (2017). What is meant by adaptability in buildings? Facilities, 35(1/2), 2-20.
  • [24] Friedman, A., 2002, The Adaptable House: Designing Homes for Change, McGraw-Hill, New York, NY.
  • [25] Schmidt III, R., & Austin, S.A. (2016). Part I-Introduction, Motivating Observations, in Adaptable Architecture: Theory and Practice, New York, Routledge.
  • [26] Gu, P., Hashemian, M., & Nee, A. Y. C. (2004). Adaptable design. CIRP Annals, 53(2), 539-557.
  • [27] Tschumi, B. (1996). Architecture and Disjunction. The MIT Press.
  • [28] Schmidt III, R. (2014). Designing for Adaptability in Architecture. Doctoral Dissertation, School of Civil and Building Engineering, Loughborough University.
  • [29] American Institute of Architects. (2020). Buildings that Last: Design for Adaptability, Deconstruction, and Reuse. Retrieved from https://content.aia.org/sites/default/files/2020-03/ADR-Guide-final_0.pdf
  • [30] Schneider, T., & Till, J. (2005). Flexible housing: opportunities and limits. Arq: Architectural Research Quarterly, 9(2), 157-166.
  • [31] Orhon, A. V. (2016). Adaptive building shells, Developments in Science and Engineering. Efe, R., Matchavariani, L., Yaldir, A., Lévai, L., Eds, 555-567.
  • [32] Askar, R., Bragança, L., & Gervásio, H. (2021). Adaptability of Buildings: A Critical Review on the Concept Evolution, Applied Sciences, 11 (10), 4483.
  • [33] Habraken, N.J. (2008). Design for Flexibility. Building Research & Information, 36(3), 290-296.
  • [34] Carthey, J., Chow, V., Jung, Y-M., & Mills, S. (2011). Flexibility: Beyond the Buzzword - Practical Findings from a Systematic Literature Review. HERD: Health Environments Research & Design Journal, 4(4), 89-108.
  • [35] Barlow, J., Koberle-Gaiser, M., Moss, R., Noble, A., Scher, P., & Stow, D. (2009). Adaptability and innovation in healthcare facilities: Lessons from the past for future developments. London, United Kingdom: The Health and Care Infrastructure Research and Innovation Centre.
  • [36] Groak, S. (1992). The Idea of Building: Thought and Action In The Design And Production Of Buildings. London: E&FN Spon: An.
  • [37] De Paris, S.R., & Lopes, C.N.L. (2018). Housing flexibility problem: Review of recent limitations and solutions. Frontiers of Architectural Research, 7 (1), 80-91.
  • [38] Estaji, H. (2017). A review of flexibility and adaptability in housing design, International Journal of Contemporary Architecture, 4(2), 37-49.
  • [39] Arge, K. (2005). Adaptable office buildings: theory and practice, Facilities, 23(3/4), 119-127.
  • [40] Leaman, A., Bordass, B. and Cassels, S. (1998), Flexibility and Adaptability in Buildings: the ‘Killer’ Variables, Building Use Studies, London.
  • [41] Heidrich, O., Kamara, J., Maltese, S., Re Cecconi, F. and Dejaco, M.C. (2017), A critical review of the developments in building adaptability, International Journal of Building Pathology and Adaptation, 35, 284-303.
  • [42] Seelow, A. M. (2017). Function and Form: Shifts in Modernist Architects’ Design Thinking, Arts, 6(1).
  • [43] Leupen, B. (2004). The Frame and The Generic Space, A New Way Of Looking To Flexibility. Proceedings of the 10th Annual Conference of the CIB W104 Open Building Implementation, September 20-22, 2004, Paris, France.
  • [44] Habraken, N.J. (2019). Supports: An Alternative to Mass Housing. Routledge, New York.
  • [45] Kendall, H., & Teicher, J. (2000). Residential Open Building. 1st Ed., Spon Press, London, UK.
  • [46] Brand, S. (1994). How buildings learn: What happens after they’re built. Viking, New York.
  • [47] Kendall, S. (2017). Four Decades of Open Building Implementation: Realising Individual Agency in Architectural Infrastructures Designed to Last, Architectural Design, 87, 54-63.
  • [48] Deniz, O. S. (2011). Sürdürülebilir yapili çevre için bir tasarim ve yapim yaklasimi: Açik Yapi, Arredamento, 69-77.
  • [49] Kendall, S. (2004). An Open Building Strategy for Achieving Dwelling Unit Autonomy in Multi-Unit Housing. Housing and Society, 31 (1), 89-102.
  • [50] Li, G.P., Li, Z.B., & Li, Y.B. (2019). Open Building as a Design Approach for Adaptability in Chinese Public Housing, World Journal of Engineering and Technology, 7, 598-611.
  • [51] Yingying, J., & Beisi, J. (2011). The Tendency of the “Open Building” Concept in the Post-Industrial Context. Open House International, 36(1), 6-15.
  • [52] van Eldonk, J., & Fassbinder, H. (1990). De paradox van de Nederlandse woningbouw, Eindhoven University of Technology.
  • [53] Fukao, S. (2008). The History of Developments toward Open Building in Japan, in Education for an Open Architecture, Ball State University, College of Architecture and Planning. Retrieved from http://www.irbnet.de/daten/iconda/CIB11014.pdf
  • [54] Schmidt III, R. Eguchi, T., & Austin, S. (2010). Lessons from Japan: A look at Century Housing System, 12th International Dependency and Structure Modelling Conference, 22-23 July 2010, Cambridge, UK.
  • [55] Duffy, F., 1990, Measuring building performance, Facilities, 8(5), 17-20.
  • [56] Slaughter, E. S., Sause, R. S., & Pessiki, S. (1997). Precast Concrete Floor Framing Systems to Accommodate Nonstructural Requirements. Journal of Architectural Engineering, 3 (3), 109-117.
  • [57] Ashbolt, D. A. (2011). Adaptability in architecture: designing for structural and programmable change, University of Cape Town.
  • [58] Abdullah, Y. S., & Al-Alwan, H. A. (2019). Smart material systems and adaptiveness in architecture. Ain Shams Engineering Journal, 10(3), 623-638.
  • [59] Till, J., & Schneider, T. (2005). Flexible housing: the means to the end, arq: Architectural Research Quarterly, 9(3-4), 287-296.
  • [60] Ali, M.M., & Al-Kodmany, K. (2022). Structural Systems for Tall Buildings. Encyclopedia, 2(3), 1260-1286.
  • [61] Stankard, M. (2002). Re-Covering Mies van der Rohe’s Weissenhof: The Ultimate Surface. Journal of Architectural Education, 55(4), 247-256.
  • [62] Perianez, M. (2013). L’habitat évolutif: du mythe aux réalités (1993-2013). Retrieved from http://mpzga.free.fr/habevol/evolutif2013.html.
  • [63] Zivkovic, M., Kekovic, A., & Kondic, S. (2014). The Motives for Application of the Flexible Elements in the Housing Interior. Facta Universitatis Series: Architecture and Civil Engineering, 12(1), 41-51.
  • [64] Komatina, I. (2012). Adaptability Potential in Existing Buildings for Elderly Housing: The Case of Grabergets Sjukhem, Master Thesis, Chalmers University of Technology, Department of Architecture.
  • [65] Davison, N., Gibb, A., Austin, S., Goodier, C., & Warner, P. (2006). The Multispace Adaptable Building Concept and its Extension into Mass Customisation, Adaptables2006-The International Conference On Adaptable Building Structures, TU/e, Eindhoven.
  • [66] Beadle, K., Gibb, A., Austin, S., Fuster, A., & Madden, P. (2008). Adaptable futures: sustainable aspects of adaptable buildings, In the proceedings of ARCOM (Association of Researchers in Construction Management) Twenty-Fourth Annual Conference, 1-3.
  • [67] Gann, D. M., & Barlow, J. (1996). Flexibility in building use: the technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), 55-66.
  • [68] Robertson, B., & Shibar, V. (2002). The Adaptive Enterprise: IT infrastructure strategies to manage, change, and enable growth. 1st Ed., Boston, USA: Intel Press.
  • [69] Verweij, S., & Poleman, W A. (2006). Evaluation of flexibility options in different housing projects, an exploration of possible flexibility for second users in multi-storey housing, Adaptables’ 06. In International Conference on Adaptable Building Structures, 2-39.
  • [70] Geraedts, R. P. (1998) Open Building and Flexibility; an assessment method. Matching demand and supply for flexibility, In 1998 International Symposium on Open Building.
  • [71] Pati, D., Harvey, T., & Cason, C. (2008) Inpatient unit flexibility. Environment and Behaviour, 40 (2), 205-232.
  • [72] Gijsbers, R., Cox, M.G.D.M., Haas, T.C.A. de Kok, P.J.A., & Hulsbergen, H.S. (2009). Development of a membrane roofing system with integrated climate control for community shelters, Proceedings of SASBE 09, 3rd CIB international conference on smart and sustainable built environments, Delft, 1-8.
  • [73] Conejos, S., Langston, C., & Smith, J. (2014). Designing for better building adaptability: A comparison of “adaptSTAR” and ARP models. Habitat International, 41, 85-91.
  • [74] Kincaid, D. (2000). Adaptability potentials for buildings and infrastructure in sustainable cities. Facilities, 18 (3/4), 155-161.
  • [75] Ross, B. E., Chen, D. A., Conejos, S., & Khademi, A. (2016). Enabling adaptable buildings: Results of a preliminary expert survey. Procedia Engineering, 145, 420-427.
  • [76] Blakstad, S.H. (2001). A Strategic Approach to Adaptability in Office Buildings, Doctoral Dissertation, Norwegian University of Science and Technology, Department of Building Technology.
  • [77] Finch, E. (2009). Flexibility as a design aspiration: the facilities management perspective. Ambiente Construído, 9(2), 7-15.
  • [78] Manewa, A., Pasquire, C., Gibb, A., Ross, A., & Siriwardena, M. (2013). Adaptable buildings: striving towards a sustainable future. Proceedings of the People and the Planet 2013: Transforming the Future Conference.
  • [79] Eguchi, T., Schmidt III, R., Dainty, A., Austin, S., & Gibb, A. (2011). The cultivation of adaptability in Japan. Open House International, 36(1), 73-85.
  • [80] Hagy, S., & Balay, P. (2014). Adaptable Design for HSB Living Lab, Design for Sustainable Development.
  • [81] Larssen, A. K., & Bj0rberg, S. (2004). User need/demands (functionality) and adaptability of buildings-a model and tool for evaluation of buildings, Proceedings of the 12th CIB W.
  • [82] CMHC, 2001, Flexhousing: Building Adaptable Housing, Research Division, Canada Mortgage and Housing Corporation.
  • [83] Sutherland, R. J. M. (1984). Durability and design life - the breadth of the subject. Paper presented at Design Life of Buildings, London.
  • [84] Rush, R.D. (1986). The Building Systems Integration Handbook. American Institute of Architects and Butterworth-Heinemann, Boston.
  • [85] Hashemian, M. (2005). Design for Adaptability, Doctoral Dissertation, University of Saskatchewan.
  • [86] Bottom, C., McGreal, S., & Heaney, G. (1998). The Suitability of Premises for Business use: an evaluation of supply demand variations. Property Management, 16(3), 134-144.
  • [87] Ratcliffe, J., & Stubbs, M. (1996). Urban Planning and Real Estate Development. 1st Ed. London, UK: UCL Press.
  • [88] Ritcher, U., & Laubach, A. (2005). The adaptable tall building. Lacer No 5, Germany.
  • [89] Rawlinson, S., & Harrison, I. (2009). Cost model office refurbishment, Building Magazine, 10(3), 48-53.
  • [90] Wilkinson, S.J., James, K., & Reed, R. (2009). Using building adaptation to deliver sustainability in Australia, Structural Survey, 27(1), 46-61.
  • [91] Emmons, P., & Mindrup, M. (2008). Material Models and Immaterial Paradigms in the Rietveld Schroder House, Journal of Architectural Education, 62(2), 44-52.
  • [92] Sveiven, M. (2010). AD Classics: Rietveld Schroder House / Gerrit Rietveld. Retrieved from https://www.archdaily.com/99698/ad-classics-rietveld-schroder-house-gerrit-rietveld
  • [93] Merchant, S., Shi, J., Ru, S., & Ratajczak, N. (2012). An architectural case study of the most famous house of the De Stijl movement, designed by Gerrit Rietveld. Retrieved from
  • http://rietveldschroderhouse.blogspot.com/2012/12/diagrams-in-depth-analysis-of-design-of.html
  • [94] Sunwoo, I. (2006). Taming the Farnsworth House. Thresholds, 66-75.
  • [95] Bilgin, I. (2002). Serbest Plan, Serbest Cephe, Serbest Ev. Retrieved from https://v3.arkitera.com/diya-log.php?action=displaySession&ID=62&aID=631
  • [96] Fu, X. L. (2019). Analysis on the integrated design of architecture and furniture: Taking the Farnsworth House as an example. In Journal of Physics: Conference Series, 1168(3).
  • [97] Bilgin, I. (2002). Farnsworth Evi, Retrieved from https://v3.arkitera.com/diyalog.php?action=displaySession&ID=62&year=&aID=635&cf_chl_jschl_tk__=pmd_4e9db460fa4bcf5bba88ef7e58364d225992a87a-1627466129-0-gqNtZGzNAg2jcnBszQd6
  • [98] Projectos, 2022, Wohnanlage Genter Strasse,1972. Genter Strasse, 80805 - München - Germany. Retrieved from https://proyectos4etsa.wordpress.com/2016/06/21/wohnanlage-genter-strasse1972-genter-strasse-80805-munchen-germany-otto-steidle-and-partner-2
  • [99] Kossak, F., 2011, An architect’s Tagwerk: Notes on Otto Steidle’s work between the urban and the rural, arq: Architectural Research Quarterly, 15(4), 327-340.
  • [100] Ho, K. (2022). Archdiary: Kin Ho’s diary of works - my pursuits in architecture: Wohnanlage Genter Strasse, Otto Steidle & Partners 1972. Retrieved from http://kin-ho.blogspot.com/2009/11/wohnanlage-gen-ter-strasse-otto-steidle.html
  • [101] Ilhan, C. (2008). Tüketici odakli konut arzinda esnek- lik ve yalinlik yaklaşimlari, Doctoral Dissertation, Yildiz Technical University, Istanbul, Turkey.
  • [102] Yakin, O. (2022). Toplu Konut Tasariminda Esneklik ve Degişebilirlik Kavramlari. Online Journal of Art and Design, 10(1).
  • [103] O’Brien, D., & Carrasco, S. (2021). Contested incrementalism: Elemental’s Quinta Monroy settlement fifteen years on, Frontiers of Architectural Research, 10(2), 263-273.
  • [104] Aravena, A., & Iacobelli, A. (2016). Elemental: manual de Vivienda incremental y disen'o participativo [Elemental: incremental housing and participatory design manual]. Ostfildern: Hatje Cantz.
  • [105] Carrasco, S., & O’Brien, D. (2021). Beyond the freedom to build: Long-term outcomes of Elemental’s incremental housing in Quinta Monroy. Revista Brasileira de Gestão Urbana, 13, e20200001.
  • [106] Aravena, A. (2010). Elemental-Interview. Perspecta, 42, 85-89.
  • [107] Marinovic, G.I. (2021). Incremental Housing: A Strategy to Facilitate Households Participation? In the Proceedings of Cities in a Changing World: Questions of Culture, Climate and Design.
  • [108] Hasgül, E. (2016). Incremental housing: A participation process solution for informal housing. A | Z ITU Journal of the Faculty of Architecture, 13 (1), 15-27.
  • [109] Elemental [online]. 2024. Available at: http://www.elementalchile.cl/en/. Accessed: 4th January 2024.
  • [110] de Chile, T., & Verona, I. (2006). ELEMENTAL Program: Rethinking Low-Cost Housing in Chile. PRAXIS: Journal of Writing + Building, 8, 52-57.
  • [111] Granja Bastidas, M. B., & Cuenca Gonzaga, M. E. (2020). The chapters that ELEMENTAL forgot: informal logics for the design of social housing. Estoa Journal of the Faculty of Architecture and Urbanism, 9(18), 139-155.
  • [112] ANA Architecten. 2018. Het Schetsblok Westlandgracht/Arie Kepplerprijs 2018. Available at: https://www.mooinoord-holland.nl/inhoud/uploads/2018/05/Arie-Kepplerprijs_ANA-architecten_Het-schetsblok-A3-1.pdf. Accessed: 4th January 2024.
  • [113] Abdel, H. 2024. The Sketchblock / ANA Architecten. Available at: https://www.archdaily.com/956523/the-sketchblock-ana-architecten. Accessed: 4th January 2024.
  • [114] Openbuilding. 2024. Het Schetsblok & Open Cities. Available at: https://www.openbuilding.co/schetsblok-ana. Accessed: 4th January 2024.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-2302d898-d1c1-4be5-a466-80a08af0da7d
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.