Tytuł artykułu

Algorithm of selecting cost estimation methods for ERP software implementation

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The article discusses the problem of selecting estimation methods for cost and implementation time for ERP systems, in case when system modifications are necessary. The authors reviewed the methods available in the literature and characterised the stages of strategic phase in the implementation process. On the basis of the analysis of data range and quality required by each method and the data obtained at different stages, a selection algorithm for each stage was proposed.
Słowa kluczowe
Rocznik
Strony
5--19
Opis fizyczny
Bibliogr. 37 poz., fig.
Twórcy
autor
  • Politechnika Koszalińska, Wydział Elektroniki i Informatyki, ul. Śniadeckich 2, 75-453 Koszalin
autor
  • Politechnika Koszalińska,Wydział Elektroniki i Informatyki, ul. Śniadeckich 2, 75-453 Koszalin
Bibliografia
  • [1] Burns M.: How to select and implement an ERP System [online]. 2005. Available: http://www.180systems.com/ERPWhitePaper.pdf
  • [2] Plecka P.: Selected Methods of Cost Estimation of ERP Systems' Modyfications. Zarządzanie Przedsiębiorstwem, 2013.
  • [3] Sommerville I.: Software Engineering. Pearsom Education Limited, Edingurgh, 2007.
  • [4] Mcconell S.: Software Estimation: Demystifying the Blac Art. Microsoft Press, 2006.
  • [5] Meli R.: Early Function Points: a new estimation method for software project. WSCOM97, Berlin, 1997.
  • [6] Santillo L., Conte M. I Meli R.: Early &Quick Function Point: Sizing More with Less. Metrics 2005, 11 th IEEE Intl Software Metrics Symposium, Como, Italy, 2005.
  • [7] Boehm B., Abts C. I Chulani S.: Software Development Cost Estimation Approaches – A Survey. Annals of Software Engineering, vol. 10, no. 1-4, 2000, p. 177-205.
  • [8] BPMN: Object Management Group [online]. 2013. Available: http://www.bpmn.org
  • [9] Frączkowski K.: Zarządzanie projektem informatycznym. Oficyna Wydawnicza Politechniki Wrocławskiej, Wrocław, 2003.
  • [10] Philips J.: IT Project Management. On Track from Start to Finish. Osborne, 2004.
  • [11] Justynowicz K.: Analiza przedwdrożeniowa coraz popularniejsza [online]. 2007. Available: http://www.bcc.com.pl/akademia-lepszego-biznesu/analiza-przedwdrozeniowa-coraz-popularniejsza.html
  • [12] Allen P., Frost S.: Component-Based Development for Enterprise Systems, Applying the Select Perspective. Cambridge University Press, Cambridge, 1998.
  • [13] Select Business Solution [online]. Available: http://www.selectbs.com
  • [14] ARIS [online]. Available: http://www.softwareag.com
  • [15] Boehm B.: Software Engeneering Ecomonics, Englewood Clifs, New York, 1981.
  • [16] Boehm B. W.: Software Cost Estimation with COCOMO II. Prentice Hall, 2000.
  • [17] Baik J.: COCOMO II, Model Definition Manual, Version 2.1. Center for Software Engineering at the University of Southern California, 2000.
  • 18] Hele J., Parrish A., Dixon B., Snith R.: Enhancing the Cocomo estimation models. Software, IEEE, vol. 17, no. 6, p. 45-49, 2000.
  • 19] Aljahdali S., Sheta A.: Software effort estimation by tuning COOCMO model parameters using differential evolution. Computer Systems and Applications (AICCSA), IEEE/ACS International Conference on, Hammamet, 2010.
  • [20] Fei Z.: f-COCOMO: fuzzy constructive cost model in software engineering,” Fuzzy Systems, 1992., IEEE International Conference on, San Diego, CA, 1992.
  • [21] Satyananda R. C.: An Improved Fuzzy Approach for COCOMO’s Effort Estimation using Gaussian Membership Function. JOURNAL OF SOFTWARE, vol. 4, no. 5, p. 452-459, July 2009.
  • [22] Attarzadeh I.: Improving estimation accuracy of the COCOMO II using an ada-ptive fuzzy logic model. Fuzzy Systems (FUZZ), 2011 IEEE International Conference, Taipei, 2011.
  • [23] Albreht A.: Measuring Application Development Productivity. Proceedings of the Joint SHARE, GUIDE, and IBM Application Development Symposium, Monterey, California, USA, 1997.
  • [24] IFPUG: Function Point Counting Practices: Manual Release 4.1, Westerville, OH: IFPUG, 1999.
  • [25] The QSM Function Points Languages Table [online]. QSM, 2013. Available: http://www.qsm.com/resources/function-point-languages-table
  • [26] International Function Point Users Group [online]. Available: http://www.ifpug.org
  • [27] Stutzke R. D.: Estimation Software-Intensive Systems. Upper Saddle River, New York, Addison-Wesley, 2005.
  • [28] Tausworthe R.: The work breakdown structure in software project management. Journal of Systems and Software, vol. 1, 1984.
  • [29] Norman E., Brotherton S. I Fried R.: Work Breakdown Structures. The Foundation for Project Management Excellence, John Wiley & Sons, 2010.
  • [30] Haugan G.: Effective Work Breakdown Structures. Project Management Institute, 2002.
  • [31] Jorgensen M.: A Review of Studies on Expert Estimation of Software Development Effort. Journal of Systems and Software, vol. 70, no. 1-2, p. 37-60, 2004.
  • [32] Kitchenham B., Pfleeger S. L., Mccoll B., Eagan S.: An empirical study of maintenance and development estimation accuracy. Journal of Systems and Software, vol. 64, no. 1, p. 57-77, 2002.
  • [33] Myers P. L. H. W.: Measures for Excellence. Reliable Software on Time, Within Budget, Englewood Cliffs, NY: Yourdon Press, 1992.
  • [34] Fondahl J. W.: The History of Modern Project Management Precedence Diagramming Methods: Origins and Early Development. Project Management Journal, vol. XVIII., no. 2, 1987.
  • [35] NASA: ISD Wideband Delphi Estimation [online]. 2004. Available: http://software.gsfc.nasa.gov/assetsapproved/PA1.2.1.2.pdf
  • [36] Humphrey W. S.: A Discipline for Software Engineering. Addison Wesley, 1995.
  • [37] Cohn M.: Agile Estimating and Planning. Upper Side River, NY: Prentice Hall PTR, 2005.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-22d345c2-4447-4a1a-9cd7-5f829ee7608f
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.