EN
Cost estimation in the pre-design phase both for the contractor as well as the investor is an important aspect from the point of view of budget planning for a construction project. Constantly growing commercial market, especially the one of public utility constructions, makes the contractor, at the stage of development the design concept, initially estimate the cost of the facade, e.g. office buildings, commercial buildings, etc., which are most often implemented in the form of aluminum-glass facades or ventilated elevations. The valuation of facade systems is of an individual calculation nature, which makes the process complicated, time-consuming, and requiring a high cost estimation work. The authors suggest using a model for estimating the cost of facade systems with the use of statistical methods based on multiple and stepwise regression. The data base used to form statistical models is the result of quantitative-qualitative research of the design and cost documentation of completed public facilities. Basing on the obtained information, the factors that shape the costs of construction façade systems were identified; which then constitute the input variables to the suggested cost estimation models.
PL
Celem artykułu jest próba oszacowania kosztów wykonania systemów elewacyjnych obiektów użyteczności publicznej z wykorzystaniem modeli matematycznych, a w szczególności regresji wielorakiej oraz regresji krokowej postępującej. Dane użyte do budowy funkcji regresji zostały opracowane przez autorów na podstawie analizy dokumentacji projektowych, wykonawczych i kosztorysowych obiektów użyteczności publicznej. Opracowano bazę danych zawierającą główne czynniki wpływające na kształtowanie się kosztów wykonania systemów elewacyjnych obiektów użyteczności publicznej. Systemy elewacyjne realizowane były w formie fasad aluminiowo-szklanych oraz elewacji wentylowanych.
Rocznik
Strony
81--95
Opis fizyczny
Bibliogr. 21 poz., il., tab.
Twórcy
  • Cracow University of Technology, Faculty of Civil Engineering, Institute of Construction Management, Cracow, Poland
  • Cracow University of Technology, Faculty of Civil Engineering, Institute of Construction Management, Cracow, Poland
  • Cracow University of Technology, Faculty of Civil Engineering, Institute of Construction Management, Cracow, Poland
Bibliografia
  • 1. D. A. Aczel, “Statystyka w Zarządzaniu”, Wydawnictwo Naukowe PWN, 2017.
  • 2. S.L. Chan, M.Park, “Project cost estimation using principal component regression, Construction Management and Economics, 2005.
  • 3. E. Gatnar, M. Walesiak, “Metody statystycznej analizy wielowymiarowej w badaniach marketingowych” Wydawnictwo Akademii Ekonomicznej we Wrocławiu, 2004.
  • 4. B. Hoła, “Identification and evaluation of processes in a construction enterprise”, Archives of Civil and Mechanical Engineering, Vol.15, No. 2, 419-426, 2015.
  • 5. B. Hoła, M. Szóstak, “Analysis of the state of the accident rate in the construction industry in European Union countries”, Archives of Civil Engineering, Vol. 61, No. 4, 19-34, 2015.
  • 6. M. Juszczyk, A. Leśniak, K. Zima, “ANN Based Approach for Estimation of Construction Costs of Sports Fields”. Complexity, 1-11. DOI:10.1155/2018/7952434, 2018.
  • 7. O. Kapliński, “Innovative solutions in construction industry”, Review of 2016-2018 events and trends. Engineering Structures and Technologies, Vol. 10, No. 1, 27-33, 2018.
  • 8. T. Kasprowicz, “Inżynieria przedsięwzięć budowlanych. W O. Kapliński (red.), Metody i modele badań w Inżynierii Przedsięwzięć Budowlanych”, PAN KILiW, IPPT, 2007.
  • 9. G.H. Kim, S.H. An, K.I. Kang, “Comparison of construction cost estimating models based on regression analysis, neural networks, and case – based reasoning, Building and Environment, 2004.
  • 10. R. Konarsk, “Modele równań strukturalnych”, Wydawnictwo PWN, 2009.
  • 11. R. Kozik, A. Leśniak, E. Plebankiewicz, K. Zima, “Dokładność wstępnych oszacowań kosztów stanu surowego obiektu kubaturowego”, Archives of Institute of Civil Engineering, Vol. 13, 201-207, 2012.
  • 12. A. Leśniak. M. Górka, “Evaluation of selected lightweight curtain wall solution using multi criteria analysis”, AIP Publishing, Vol. 1978, No. 1, 240003, 2018.
  • 13. A. Leśniak, M. Górka, D. Wieczorek, “Identification of factors shaping tender prices for lightweight curtain walls”, Scientific review – Engineering and Environmental Sciences, DOI 10.22630/PNIKS.2019.28.2.16, 2019.
  • 14. A. Leśniak, M. Juszczyk, “Prediction of site overhead costs with the use of artificial neural network based model”, Archives of Civil and Mechanical Engineering, Vol. 18, No. 3, 973-982, DOI:10.1016/j.acme.2018.01.014, 2018.
  • 15. A. Leśniak, K. Zima, “Cost calculation of construction projects including sustainability factors using the Case Based Reasoning [CBR] method, Sustainability, Vol. 10, No. 5, 1608. DOI: 10.3390/su10051608, 2018.
  • 16. D. Lowe, M. Emsley, A. Harding, “Predicting Construction Cost Using Multiple Regression Techniques”, Journal of Construction Engineering and Management, 2006.
  • 17. G. S. Maddala, “Ekonometria”, Wydawnictwo Naukowe PWN, 2006.
  • 18. PN-EN 13830(2005). Ściana osłonowa – Norma wyrobu.
  • 19. S.M. Trost, G.D. Oberlender, “Predicting accuracy of early cost estimates using factor analysis and multivariate regression”, Journal of Construction Engineering and Management, 2003.
  • 20. E. Urbańska-Galewska, D. Kowalski, “Lekka obudowa. Część 4 - Układy konstrukcyjne”, Builder, Vol. 20, 106-110, 2016.
  • 21. D. Wieczorek, E. Plebankiewicz, K. Zima, “Model estimation of the whole life cost of a building with respect to risk factors. Technological and Economic Development of Economy, Vol. 25, No. 1, 20-38, 2019.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2020).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-1f1d2e72-a5cd-4247-874e-4c2cfe480f16
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.