Tytuł artykułu
Autorzy
Treść / Zawartość
Pełne teksty:
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
It has been found that the area where one can look for significant reserves in the procurement logistics is a rational management of the stock of raw materials. Currently, the main purpose of projects which increase the efficiency of inventory management is to rationalise all the activities in this area, taking into account and minimising at the same time the total inventory costs. The paper presents a method for optimising the inventory level of raw materials under a foundry plant conditions using two different control models. The first model is based on the estimate of an optimal level of the minimum emergency stock of raw materials, giving information about the need for an order to be placed immediately and about the optimal size of consignments ordered after the minimum emergency level has occurred. The second model is based on the estimate of a maximum inventory level of raw materials and an optimal order cycle. Optimisation of the presented models has been based on the previously done selection and use of rational methods for forecasting the time series of the delivery of a chosen auxiliary material (ceramic filters) to a casting plant, including forecasting a mean size of the delivered batch of products and its standard deviation.
Czasopismo
Rocznik
Tom
Strony
97--100
Opis fizyczny
Bibliogr. 4 poz., rys., wykr.
Twórcy
autor
- Department of Materials Technology, Silesian University of Technology, Krasińskiego 8, 40-019 Katowice, Poland
autor
- Department of Computer Science and Management, Silesian University of Technology, Krasińskiego 8, 40-019 Katowice, Poland
autor
- Department of Materials Technology, Silesian University of Technology, Krasińskiego 8, 40-019 Katowice, Poland
autor
- Department of Computer Science and Management, Silesian University of Technology, Krasińskiego 8, 40-019 Katowice, Poland
autor
- Centrostal Górnośląski Sp. z o.o., Stalowa 1, 40-610 Katowice, Poland
Bibliografia
- [1] Szymszal, J., Gajdzik, B., Piątkowski, J. (2011). Logistics in a company. Selected qualitative and quantitative methods for use in the steel industry. Gliwice: Silesian University of Technology.
- [2] Bentkowski, J., Radziejowska, G. (2011). Procurement logistics in an enterprise. Gliwice: Silesian University of Technology.
- [3] Szymszal, J., Gierek, A., Piątkowski, J. & Pucka, A. (2005). Using the ABC and XYZ classification to optimise foundry production. Archives of Foundry Engineering. 5(17), 313-318.
- [4] Szymszal, J., Gajdzik, B., Piątkowski, J. & Kliś, J.(2012). Optimization of inventory management in foundry in term of an economic order quantity. Metallurgy. 51(2), 281-284.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-15ccb495-bf9a-4da8-b1f4-16a341956f9f