PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Changes in aerodynamic parameters for 5-stage steam turbine during warming and gradual start-up to nominal operating parameters

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The results of experiments on the 5-stage steam turbine are presented. The parameters of individual stages as well as the whole turbine are observed during the gradual start-up to nominal operating parameters. The pressures and temperatures are shown at stages in idling, heating up the experimental turbine and during the transition to operating speed. A greater attention is devoted to three selected operational conditions with different processed enthalpy drops. Problems with efficiency and enthalpy drops measurement during warming are described. The attempts to measure flow parameters quickly and without time for heating of turbine casings and other parts are often in the experimental research caused byprice of the survey. This contributionÞs task is to inform about these situations and to avoid confused and untrue results obtained by somewhat hasty measurements due to reduction and optimisation of costs.
Rocznik
Tom
Strony
45--62
Opis fizyczny
Bibliogr. 6 poz., rys., tab.
Twórcy
autor
  • Doosan Škoda Power, s.r.o., Tylova 1/57, 301-28, Plzeň, Czech Republic
autor
  • Doosan Škoda Power, s.r.o., Tylova 1/57, 301-28, Plzeň, Czech Republic
autor
  • University of West Bohemia, Univerzitni 8, 306-14, Plzeň, Czech Republic
Bibliografia
  • [1] Hoznedl M., Bednář L., Miczán M., Tajč L.: Influence of operating parameters on thermodynamic efficiency of experimental turbine with 1000 MW HP part. In: Proc. Conf. Symcom 2014, Lodz 2014, 51–52.
  • [2] Banaszkiewicz M.: Steam turbine start-ups. Transactions IFFM, 126(2014), 169–198.
  • [3] Ehrsam A, Schreier T., Brunner P., Abhishek M.: Steam turbine start-up optimization tool based on ABAQUS and python scripting. In: Proc. Simulia Customer Conference, London 2009.
  • [4] Spelling J., Jöcker M., Martin A.: Thermal modeling of a solar steam turbine with a focus on start-up time reduction. J. Eng. Gas Turb. Power – T. ASME 134(2012), 1, 1013001– 013001-8, DOI:10.1115/1.4004148.
  • [5] Alobaid F., Postler R., Ströhle, Epple B., Kim H.G.: Modeling and investigation startup procedures of a combined cycle power plant. J. Appl. Energy 85(2008), 12, 1173–1189, DOI:10.1016/j.apenergy.2008.03.003.
  • [6] Albert P.: Steam Turbine Thermal Evaluation and Assessment. GE Power Systems, GER4190.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-120554a6-e028-4bde-8495-9529d166f414
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.