Structural health monitoring system of a concrete cable-stayed bridge

Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
In this paper a system of the Rędziński bridge will be described. The Rędziński bridge is the biggest object along the A8 motorway around the city of Wrocław and the biggest concrete cable-stayed bridge in Poland. For the purposes of the bridge monitoring a system of 222 sensors was installed. Results from the first 5 years of work of the SHM will be presented below.
Rocznik
Strony
69--77
Opis fizyczny
Bibliogr. 6 poz.
Twórcy
  • Wrocław University of Science and Technology, Faculty of Civil Engineering, Wybrzeże Stanisława Wyspiańskiego 27, 50-370 Wrocław, Poland
  • Wrocław University of Science and Technology, Faculty of Civil Engineering, Wybrzeże Stanisława Wyspiańskiego 27, 50-370 Wrocław, Poland
  • Wrocław University of Science and Technology, Faculty of Civil Engineering, Wybrzeże Stanisława Wyspiańskiego 27, 50-370 Wrocław, Poland
Bibliografia
  • [1] Neostrain, SHM Application “Inspector”.
  • [2] Biliszczuk, J., Onysyk, J., Barcik, W., Prabucki, P., Sułkowski, M., szczepański, J., Toczkiewicz, R., Tomiczek, M., Tukendorf, A., Tukendorf, K., AST A. (2011). Rędziński Bridge along the Wrocław Ringroad. Wrocław Bridge Days, Wrocław 24th-25th November 2011, Wrocław: DWE, 203-222.
  • [3] Hawryszków, P., Hildebrand, M. (2012). Installation of the largest stay cable system in Poland - the Rędziński bridge in Wrocław. Proceeding of the 18th IABSE Congress “Innovative Infrastructures - Toward Human Urbanism”. Seoul, Korea.
  • [4] Barcik, W., Sieńko, R., Biliszczuk, J. (2011). SHM System of the Rędziński Bridge in Wrocław, Wrocław Bridge Days, Wrocław 24th-25th November 2011, Wrocław: DWE.
  • [5] Biliszczuk, J., Onysyk J., Teichgraeber, M. (2016). Data analysis of the SHM System of the Rędziński Bridge. 1st Rapport from the period August 2011 - January 2016, Wrocław.
  • [6] Neostrain, Instruction of the SHM Application for the bridge along the Wrocław Ringroad.
Uwagi
PL
Opracowanie rekordu w ramach umowy 509/P-DUN/2018 ze środków MNiSW przeznaczonych na działalność upowszechniającą naukę (2019).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-09a97a04-5b2b-406b-bed0-221a40b86d37
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.