The efficiency of a boiter miner - requirements and constraints

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Efektywność kombajnu chodnikowego typu Boiter Miner - wymagania i ograniczenia
Języki publikacji
EN
Abstrakty
EN
This paper presents an analysis of the requirements and constraints concerning the efficiency of the application of coal roadway development systems with bolt roof supports by means of specialized mining, loading and bolting machines. In some cases, machines of this type can achieve very good roadway development results measured with the daily/weekly/monthly advancing of the face. An attempt was made to indicate the requirements to be met in order to achieve the expected results, as well as the factors limiting the obtained results of gateroad development operations.
PL
W artykule przeprowadzono analizę wymagań i ograniczeń efektywności stosowania systemów drążenia chodników w węglu z obudową kotwową za pomocą wyspecjalizowanych maszyn urabiająco-ładująco-kotwiących. Maszyny tego typu uzyskują w niektórych przypadkach bardzo dobre wyniki drążenia mierzone dobowym/tygodniowym, miesięcznym postępem przodka. Podjęto próbę wskazania wymagań, których wypełnienie przyczynia się do uzyskania oczekiwanych wyników oraz czynników ograniczających uzyskane efekty drążenia.
Wydawca
Rocznik
Strony
37--44
Opis fizyczny
Bibliogr. 29 poz., rys., zdj.
Twórcy
autor
  • Famur S.A. ul. Armii Krajowej 51, 40-698 Katowice, Poland
Bibliografia
  • [1] Barczak T.M.: The History and Future of Longwall Mining in the United States, U.S. Department of the Interior, Bureau of Mines, 1992.
  • [2] Peng S.S.: Longwall Mining, 3rd Edition, CRC Press/Balkema, Leiden 2020.
  • [3] www.coalage.com/features/faster-roadway-development/[12.11.2020].
  • [4] Przybyła H., Chmiela A.: Technika i organizacja w robotach przygotowawczych, Wydawnictwo Politechniki Śląskiej, Gliwice 2002.
  • [5] Zając E.: Organizacja produkcji w kopalni w kopalni węgla kamiennego, Śląskie Wydawnictwo Techniczne, Katowice 1994.
  • [6] ACARP: Final Report: Australian Roadway Development – Current Practises, Australian Coal Association Research Program, 17 October 2005.
  • [7] Baafi E., Gray G., Porter I., Rojas O.: The Modelling of Roadway Development to Support Longwall Mining, Australian Coal Association Research Program (ACARP). Simulation Modelling Services Pty Ltd, School of Civil, Mining and Environmental Engineering University of Wollongong, November 2009, http://www.undergroundcoal.com.au/roadway/pdf/roadsim_final_report.pdf [11.01.2019].
  • [8] Banarjee S.: Performance evaluation of continuous miner based underground operation: An OEE based approach, “New Trends of Production Engineering” 2019, 2, 1: 596–603.
  • [9] Kizil M.S., McAllister A., Pascoe R.: Simulation of Development in Longwall Coal Mines, [in:] 11th Underground Coal Operators Conference, University of Wollongong & Australiasian Institute of Mining and Metallurgy, 2011: 91–98.
  • [10] Leeming J., Flook S., Altounyan P.: Bolter miners for longwall development, “Gluckauf” 2001, 137, 11: 633–638.
  • [11] Ma P., Qian D., Zhang N., Shimada H., Pan D., Huang K.: Application of bolter miner rapid excavation technology in deep underground roadway in inner Mongolia: A case study, “Sustainability” 2020, 12, 7, art. no. 2588.
  • [12] Singh R.D.: Principles and practices of modern coal mining, New Age International Publishers, New Delhi 1997.
  • [13] Van Duin S., Donnelly P., Oxley I.: Automated bolting and mesh handling on a continuous miner, [in:] Final Report ACARP PROJECT C17018 – Stage 1, University of Wollongong, Wollongong (NSW, Australia) 2011.
  • [14] Wang H.: Present Status and Development of Mine Roadway Heading Technology and Equipment in China Coal Mine, “Journal of Coal Science and Technology” 2010, 38, 1: 57–62.
  • [15] Zhang D.: Development status and key technology of intelligent rapid driving technology in coal seam roadway, “Journal of Coal Engineering” 2018, 50, 5: 56–59.
  • [16] Wallman D.: Results of the First Trail Single Entry at Ellalong Colliery, ACIRL Report No. PR82.1 1982.
  • [17] Gao D., Liu Y., Luo W.: The Application of Speedy Drivage System in Daliuta Coal Mine, “IOP Conference Series: Materials Science and Engineering” 2019, 490, 062073, https://iopscience.iop.org/article/10.1088/1757-899X/490/6/062073/ pdf [10.12.2019].
  • [18] Korski J.: Zastosowanie kombajnów typu Bolter Miner w warunkach polskich kopalń – uwarunkowania i ograniczenia, “Inżynieria Górnicza” 2018, 4: 40–48.
  • [19] Korski J: Tymczasowe obudowy zmechanizowane w drążeniu wyrobisk korytarzowych, [in:] D. Prostański, B. Polnik (red.): Innowacyjne techniki i technologie dla górnictwa: bezpieczeństwo – efektywność – niezawodność, Instytut Techniki Górniczej KOMAG, Gliwice 2020.
  • [20] Lesiecki W., Regulski W.: Urabianie złóż. Część 3. Urabianie kombajnami, Wydawnictwo “Śląsk”, Katowice 1957 (“Górnictwo”, t. 5).
  • [21] Ward B., Down M.: Gateroad Development in Thick Seams Using the Joy Sump Shearer, [in:] N. Aziz, B. Kininmonth, eds., Proceedings of the 1998 Coal Operators’ Conference, Mining Engineering, University of Wollongong, 18–20 February 1998, https://ro.uow.edu.au/coal/274 [20.12.2020].
  • [22] CAT, https://www.cat.com/en_US/by-industry/mining/underground-mining.html [20.12.2020]
  • [23] KOMATSU, www.mining.komatsu/underground-mining/room-pillar-entry-development [27.11.2020].
  • [24] SANDVIK, www.rocktechnology.sandvik/en/products/mechanical-cutting-equipment/ [27.07.2018].
  • [25] Klich A. (red.): Maszyny i urządzenia dla inżynierii budownictwa podziemnego. Wyrobiska korytarzowe i szybowe w górnictwie, “Śląsk” Sp. z o.o., Wydawnictwo Naukowe, Katowice 1999.
  • [26] Kotwica K., Klich A.: Maszyny i urządzenia do drążenia wyrobisk korytarzowych i tunelowych, Instytut Techniki Górniczej KOMAG, Gliwice 2011.
  • [27] Price D.: Demonstration of continuous cutting/bolting/rib-bolting development machine (the Voest-Alpine ABM 20 Bolter Miner), “Australia’s Journal of Coal Mining Technology and Research” 1992, 35: 3–12.
  • [28] Korski J., Tobor-Osadnik K., Wyganowska M.: Internal Client and Efficiency in the Mining Process. World Multidisciplinary Earth Sciences Symposium (WMESS 2018) IOP Conference Series: Earth and Environmental Science 2019, 221, DOI: 10.1088/1755-1315/221/1/012102.
  • [29] Korski J.: Czy podejście procesowe może podnieść efektywność polskiego górnictwa węgla kamiennego?, [in:] Materiały konferencyjne XXVI Szkoły Eksploatacji Podziemnej, Kraków 22–24.02.2017
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-0962e38f-6938-4bb8-bdb8-9cfc71489104
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.