Possibility of using military engineer equipment to cross terrain obstacles
Konferencja
XXIII Seminarium "Współczesne metody budowy, wzmacniania i przebudowy mostów" (04.-05.06.2013 ; Rosnówko, Polska)
Języki publikacji
Abstrakty
The paper presents functional breakdown of bridging equipment and the ensuing capabilities of employing such equipment by the military and civilian populations. This dual use concerns not only foldable bridges, but also assault bridges, in particular when additional elements which are inserted between treadways are used. The method of crossing narrow obstacles, such as antitank ditches or damaged culverts, as well as broad water obstacles is described. The various applications of different bridging constructions are presented basing on the examples of the Iraqi and Afghani military conflicts. In the civil and logistic support applications foldable and pontoon bridges prevail, whereas over broad, large rivers bridges such as floating variants of the Mabey Logistic Support Bridge - pontoon-based Mabey Floating Bridge - can be most often encountered.
Czasopismo
Rocznik
Tom
Strony
69--78
Opis fizyczny
Bibliogr. 9 poz., rys., tab.
Bibliografia
- 1. NO-54-A200: 2011, Mosty wojskowe. Terminologia. Klasyfikacja.
- 2. COMBINED ARMS GAP-CROSSING OPERATIONS FM 3-90.12/MCWP 3-17.1 (FM 90-13) July 2008.
- 3. Ciszewski T., Kamyk Z, Mańko Z., Zniszczenie dróg i obiektów mostowych w Kotlinie Kłodzkiej w wyniku fali powodziowej, Inżynieria i Budownictwo nr 1/1998, s. 17-19.
- 4. Marines reinforce bridge strength. http://www.marines.mil/units/marforpac/imef/1stmardiv/ PublishingImages/2006/060315-m-81120-bridge1.jpg.
- 5. Tigris River Bridge repaired in less than three days. Multi-National Corps Iraq Public Affairs http://www.dvidshub.net/image/66188/tigris-river-bridge-repaired-less-than-three-days.
- 6. Martin G.F., Johnson D.E.: Victory Sappers: V Corps Engineers in Operation Iraqi Freedom Part 1: The Attack to Baghdad and Beyond ... Engineer The Professional Bulletin for Army Engineers, July-September 2003, pp. 4-12.
- 7. Rofkahr T.: 420th Engineers Bridge the Gaps in Afghanistan’s Busy Highway 1. THE BRIDGE Fall 2008 p. 6.
- 8. Fisher M.: Strategic Afghan bridge rebuilt in co-ordinated allied effort. Canwest News Service March 11, 2010.
- 9. Milligan R.: 1437th MRBC Bridging In Iraq. Engineer The Professional Bulletin for Army Engineers, January-March 2004 pp. 40-41.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-08040659-d6ce-47b8-a369-0cff4618d504