Tytuł artykułu
Treść / Zawartość
Pełne teksty:
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
The aim of this post-conference report is to present key-issues delivered by participants of the Project and Process Management sessions (PPM) at the 7th International Conference on Engineering, Project, and Production Management (EPPM 2016). EPPM 2016 was held in Bialystok, Poland in 21-23 September. The format of the EPPM 2016 Conference involved a mixture of keynote speeches, individual presentations on topical issues, and extensive panel discussions. It featured 89 papers in five thematic sessions across the two conference days. Over 115 delegates attended EPPM 2016 from more than 20 countries across Europe, Asia, and the rest of the world.
Słowa kluczowe
Rocznik
Tom
Strony
7--9
Opis fizyczny
Bibliogr. 13 poz.
Twórcy
autor
- Al-Zaytoonah University of Jordan, Faculty of Engineering and Technology, Department of Civil and Infrastructure Engineering, Jordan
autor
- Al-Zaytoonah University of Jordan, Faculty of Engineering and Technology, Department of Civil and Infrastructure Engineering, Jorda
autor
- Bialystok University of Technology, Faculty of Management, Poland
autor
- WSB University in Gdańsk, Department of Information Technology Management, Poland
Bibliografia
- Ahmad, H.S., Bazlamit, I.M., & Ayoush, M.D. (2017). Investigation of Document Management Systems in Small Size Construction Companies in Jordan. Procedia Engineering, 182, 3-9. doi:10.1016/j.proeng.2017.03.101
- Al-Hazim, N., Salem, Z.A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18-24. doi:10.1016/j.proeng.2017.03.105
- Ayessaki, W.Y., & Smallwood, J. (2017). Influencing Workers’ Performance through Health and Safety Interventions. Procedia Engineering, 182, 42-49. doi:10.1016/j.proeng.2017.03.111
- Bazlamit, S.M., Ahmad, H.S., & Al-Suleiman (Obaidat), T.I. (2017). Pavement Maintenance Applications Using Geographic Information Systems. Procedia Engineering, 182, 83-90. doi:10.1016/j.proeng.2017.03.123
- Dumrak, J., Baroudi, B., & Hadjinicolaou, N. (2017). Exploring the Association between Project Management Knowledge Areas and Sustainable Outcomes. Procedia Engineering, 182, 157-164. doi:10.1016/j.proeng.2017.03.152
- Gabryelczyk, R., & Jurczuk, A. (2017). Does Experience Matter? Factors Affecting the Understandability of the Business Process Modelling Notation. Procedia Engineering, 182, 198-205. doi:10.1016/j.proeng.2017.03.164
- Gurcanli, G.E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182, 265-273. doi:10.1016/j.proeng.2017.03.189
- Hadjinicolaou, N., & Dumrak, J. (2017). Investigating Association of Benefits and Barriers in Project Portfolio Management to Project Success. Procedia Engineering, 182, 274-281. doi:10.1016/j.proeng.2017.03.191
- Niazi, G.A., & Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering, 182, 510-517. doi:10.1016/j.proeng.2017.03.145
- Orłowski, C., Ziółkowski, A., & Paciorkiewicz, G. (2017). Quantitative Assessment of the IT Agile Transformation. Procedia Engineering, 182, 524-531. doi: 10.1016/j.proeng.2017.03.147
- Peng, L., & Chua, D.K.H. (2017). Decision Support for Mobile Crane Lifting Plan with Building Information Modelling (BIM). Procedia Engineering, 182, 563-570. doi:10.1016/j.proeng.2017.03.154
- Pimchangthong, D., & Boonjing, V. (2017). Effects of Risk Management Practice on the Success of IT Project. Procedia Engineering, 182, 579-586. doi.org/10.1016/j.proeng.2017.03.158
- Snyman, T., & Smallwood, J. (2017). Improving Productivity in the Business of Construction. Procedia Engineering, 182, 651-657. doi:10.1016/j.proeng.2017.03.175
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-06ac8f97-e15a-43da-93dc-d3ea3fdb1d6b