PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Analysis of fees for connecting the infrastructure of generally accessible charging stations to networks with rated voltage not higher than 1 kV

Autorzy
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
On 22 February 2018, the Act on electromobility and alternative fuels came into force (Journal of Laws of 2018, item 317). This legal Act sets out the rules for the development and operation of infrastructure for the use of alternative fuels, which is closely related to the development of electromobility. The Act (2011/C81E/17) regulates and defines, among others obligations in the scope of technical requirements for the construction of a charging station and their minimum number in municipalities. This Act was introduced in order to develop electromobility, which in turn is to contribute to the reduction of CO2 emissions [1]. The aim of the paper is to show the relationship between the geographical location of the connection of road charging infrastructure in our country, and the costs of its connection to the low voltage network, understood as the costs of the connection fee, which are paid to the Distribution System Operators. The costs of the connection fee in the case of power supply from low voltage lines cover the actual connection costs of generally available charging stations, i.e. the connection costs, i.e. the network section used to connect the devices or installations or the network of the entity with the connection capacity required by it, with the remaining part of the Distribution System Operators network. The Distribution System Operator also covers the costs of the measurement and settlement system. In addition, the paper indicates the preferential treatment of connecting charging stations, which are defined as reduced costs of connecting them in relation to other objects.
Rocznik
Strony
107--114
Opis fizyczny
Bibliogr. 20 poz.
Bibliografia
  • [1] European Parliament resolution from 6th May 2010 on electric cars (2011/C81E /17), 6th May 2010.
  • [2] Electromobility Development Plan in Poland. Energy to the Future Ministry of Energy, March 16th 2017.
  • [3] Tariff for electricity distribution services for the period to December 31, 2019 for PGE Dystrybucja S.A.
  • [4] Tariff for electricity distribution services for the period to December 31, 2019 for ENEA OPERATOR Sp. z o. o.
  • [5] Tariff for electricity distribution services for the period to December 31, 2019 for TauronDystrybucja S.A.
  • [6] Tariff for electricity distribution services for the period up to December 31, 2019 for Energa-Operator S.A.
  • [7] Electricity tariff for the distribution of electricity innogy Stoen Operator for the period until December 31, 2019 for Energa-Operator S.A.
  • [8] Regulation of the Minister of Economy from 4th May 2007 on detailed conditions for the operation of the power system (Journal of Laws 2007.93.623).
  • [9] Energy Law (Journal of Laws 1997 No. 54 item 348).
  • [10] https://www.ure.gov.pl/pl/urzad/informacje-ogolne/aktualnosci/3553,Przedstawiamy-informacje-dotyczace-charakterystyki-krajowego-rynku-energiielekt.html
  • [11] https://www.enea.pl/pl/grupaenea/o-grupie/informacje-o-enea/otoczenie-rynkowe
  • [12] Generowicz A., Gaska K., Hajduga G. (2018). Multicriteria Analysis of the Waste Management System in a Metropolitan Area. E3S Web of Conferences 2018, 44, 00043. DOI.10.1051/e3sconf/20184400043.
  • [13] Koval V., Mikhno I., Hajduga G., Gaska K. (2019). Economic efficiency of biogas generation from food product waste. E3S Web of Conferences, 100, 00039. DOI: 10.1051/e3sconf/201910000039.
  • [14] Palej P., Qusay H., Kleszcz S., Hanus R., Jaszczur M. (2019). Analysis and optimisation of the hybrid renewable energy system, Polityka Energetyczna - Energy Policy Journal, 22(2), 107-120.
  • [15] Zhang T., Gensler S., Garcia R. (2011). A study of the Diffusion of Alternative Fuel Vehicles: An Agent-Based Modeling Approach, Journal of Product Innovation Management, 28, 152-168.
  • [16] Smol M., &Kulczycka J. (2019). Towards innovations development in the European raw material sector by evolution of the knowledge triangle, Resources Policy 62, 453-462.
  • [17] Gaska K.,&Generowicz A. (2020). SMART Computational Solutions for the Optimization of Selected Technology Processes as an Innovation and Progress in Improving Energy Efficiency of Smart Cities - A Case Study. Energies, 13, 3338, DOI:10.3390/en13133338.
  • [18] Gubanova E., Kupinets L., Deforzh H., Koval, V., Gaska, K. (2019). Recycling of polymer waste in the context of developing circular economy. Architecture Civil Engineering Environment, 12(4), 99-108, DOI: 10.21307/ACEE-2019-055.
  • [19] Gaska K., Generowicz A., Zimoch I., Ciuła J., Siedlarz D., (2018). A GIS based graph oriented algorithmic model for poly-optimization of waste management system, Architecture Civil Engineering Environment, 11(4), 151-159.
  • [20] Kowalski, D.; Kowalska, B.; Bławucki, T.; Suchorab, P.; Gaska, K. (2019). Impact Assessment of Distribution Network Layout on the Reliability of Water Delivery. Water 11, 480. https://doi.org/10.3390/w11030480
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-006e76f9-5bac-47f1-94db-350907812734
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.