Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Znaleziono wyników: 37
first rewind previous Strona / 2 next fast forward last
Wyszukiwano:
w słowach kluczowych:  CERGOP-2 projekt
help Sortuj według:

help Ogranicz wyniki do:
1
100%
Reports on Geodesy
2006 z. 3/78 51-84
2
100%
Reports on Geodesy
2006 z. 3/78 229-252
3
100%
Reports on Geodesy
2006 z. 3/78 253-265
4
100%
Reports on Geodesy
2006 z. 3/78 227-228
5
100%
Reports on Geodesy
2006 z. 3/78 221-226
6
100%
Reports on Geodesy
2006 z. 4/79 99-102
EN Starting with year 2001 over Romania's territory there have been installed 5 Permanent GPS Stations in municipalities of SUCEAVA, CLUJ, TIMISOARA, SIBIU and BRAILA. As it is already known, a few years ago, BKG has donated to the University of Constructions in Bucharest a Permanent GPS Station which [...]
7
100%
Reports on Geodesy
2006 z. 4/79 253-258
EN The works carried out during the time between the Nice and Sofia Conferences have been presented. They mainly concern the forthcoming installation of the antennas of the two permanent stations, combined processing of two campaigns - BULREF'03 and BULREF'93. Results from test measurements at the sele[...]
8
100%
Reports on Geodesy
2006 z. 4/79 137-144
EN The Central Europe Geodynamics Project (CERGOP) was initiated in 1993 [Fejes et al., 1993] and continued in 1995 as a European Union (EU) supported program. In 2003 the CERGOP-2/Environment Project, the successor of CERGOP, was commenced [Pesec, 2002]. The undertaken work in the CERGOP-2/Environment[...]
9
100%
Reports on Geodesy
2006 z. 3/78 31-40
EN The main objective of CERGOP-2/Environment Work Package was defined in the Project as "Monitoring the CEGRN by regular and systematic GPS measurement, satisfying the strict quality standards set by WP2". The main task in the course of the Project was the organization of the CEGRN epoch observation c[...]
10
100%
Reports on Geodesy
2006 z. 3/78 11-16
11
100%
Reports on Geodesy
2006 z. 3/78 17-29
12
100%
Reports on Geodesy
2006 z. 6/81 5-300
13
88%
Reports on Geodesy
2006 z. 3/78 215-219
14
75%
Reports on Geodesy
2006 z. 3/78 283-286
EN According to the main objectives of Workpackage WP.1O.6 the following events and works were carried out during the CERGOP-2 Project period. The following studies have been carried out by the team of the Workpackage WP. 10.6 within the program "Geodynamics of Northem Carpathians". The first part of o[...]
15
75%
Reports on Geodesy
2006 z. 4/79 399-417
EN Within the Project our group has been responsible ofWP6, which addresses the stability of time series of coordinates of GPS stations used in the project. In addition we have supported WP1, WP4, WP7 and WP10.1, as scheduled. The time series we have analysed result from WP1 and WP5. We have combined n[...]
16
75%
Reports on Geodesy
2006 z. 4/79 419-459
EN The main objective of Work Package 7 (WP7) was modelling of the regional intraplate three-dimensional velocities at the millimetre level on the basis of GPS satellite observations. Subsequently it was anticipated to use the GPS velocity filed for detection of velocity changes and for strain analysis[...]
17
75%
Reports on Geodesy
2006 z. 4/79 381-398
EN In the framework of CERGOP II ASI is involved in the following workpackages: WP.l. Internet based seamless database for environmental studies; WP.3. Periodic determination of the reference frame CEGRN; WP.5. GPS data analysis and the definition of reference frames ; WP.6. Analysis of the long-term c[...]
18
75%
Reports on Geodesy
2006 z. 3/78 85-155
EN Within the Project our group has been responsible of WP6, which addresses the stability of time series of coordinates of GPS stations used in the project. In addition we have supported WP1, WP4, WP7 and WP10.1, as scheduled. The time series we have analysed result from WP1 and WP5. We have combined [...]
19
75%
Reports on Geodesy
2006 z. 4/79 359-366
EN Analysis strategy and results from CEGRN epoch campaign in 2003. Combined product based on individual network solutions by four analysis centres and its comparison with CEGRN 2001 coordinates. Time evolution of coordinates at some long-term observed CEGRN sites during seven epoch campaigns since 199[...]
20
75%
Reports on Geodesy
2006 z. 4/79 245-251
EN The characteristics of the Balkan Peninsula in geodynamic respect are briefly outlined. The necessity, aims, prerequisites, concepts, methodology and stages of geodynamic investigations are presented. The expected results are formulated. The activities performed so far and the obtained results are d[...]
first rewind previous Strona / 2 next fast forward last