Narzędzia help

Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
first previous next last
cannonical link button

http://yadda.icm.edu.pl:80/baztech/element/bwmeta1.element.baztech-article-BPW6-0015-0007

Czasopismo

Journal of KONBiN

Tytuł artykułu

Optimized planning and scheduling of pressure equipment inspections at comah establishments

Autorzy Bragatto, P.A.  Gnoni, M.G.  Vallerotonda, M.R. 
Treść / Zawartość http://www.journal.itwl.pl/
Warianty tytułu
Języki publikacji EN
Abstrakty
EN In a process establishment, where the legislation on the control of major accidents hazard (COMAH) is enforced, the operator's duties include the implementation of a Safety Management System, which addresses all the procedures significant for safety. A critical issue of the SMS is the planning and the scheduling of mechanical integrity inspections on pressure equipment. This is due to high number of components - including pipes, unfired and fired vessels, pumps and valves, - which could require different technical and organization procedures for testing or inspection. Usually, mechanical integrity inspections may request higher resource use than other safety related activities. The paper presents a model for inspection planning and scheduling, in order to integrate safety issues with other technical and economical issues.
Słowa kluczowe
EN inspection optimization   mechanical integrity   safety management system   major accident hazard  
Wydawca Wydawnictwo Instytutu Technicznego Wojsk Lotniczych
Czasopismo Journal of KONBiN
Rocznik 2008
Tom No. 3 (6)
Strony 127--136
Opis fizyczny Bibliogr. 10 poz.
Twórcy
autor Bragatto, P.A.
autor Gnoni, M.G.
autor Vallerotonda, M.R.
  • ISPESL, National Institute for Prevenzione e Safety at Work Research Center I- 00040 Monteporzio C. (Roma) ITALY
Bibliografia
1. ASME. 1991. Risk-Based Inspection-Development Of Guidelines- General Document, Centre for Research and Technology Development, CTRD, Vol. 20-1, American Society of Mechanical Engineers.
2. API. 2002. API Recommended Practice 580 Risk Based Inspection, American Petroleum Institute, Washington DC First Edition.
3. Ablitt, C., Speck, J. Experiences in implementing Risk-based Inspection, in 3rd MENDT- Middle East Nondesctructive Testing Conference, (November 2005), Bahrain.
4. Bragatto, P. Pittiglio, P. Geraci, D. Pichini, E. 2006 Inspections on Safety Management Systems and Integrity Controls at "Seveso" Facilities Safety and Reliability for Managing Risk ISBN 0-415-41620-5 Taylor & Francis Group, London, UK pp. 1163-1169
5. Chang, M., Chang, R., Shu, C., Lin, K. 2005. "Application of risk based inspection in refinery and processing piping", Journal of Loss Prevention in the Process Industries, Vol. 18, pp. 397-402.
6. Dey, P. K., 2001. "A risk-based model for inspection and maintenance of crosscountry petroleum pipeline", Journal of Quality in Maintenance Engineering, Vol. 7, N°1, pp. 25-41.
7. Kallen, M. J., van NoortWijk, J. M., 2005. "Optimal maintenece decisions under imperfect inspection", Reliability engineering and System safety, Vol.90, pp177-185
8. Khan, F. I., Haddara, M. H., "Risk-basd maintenacnce of ethylene oxide production facilities", Journal of Hazardous Materials, Vol.108, 2004, pp. 147-159.
9. Higgs, P. A., Parkin, R. Jackson, M. AlHabaibeh, A. Zorriassatine, F. Coy, J., 2004. A Survey On Condition Monitoring Systems In Industry Proceedings of ESDA Manchester, UK, pp 19-22.
10. Italian Ministerial Decree n. 329 — 1th December 2004, Regolamento recante norme per la messa in servizio ed utilizzazione delle attrezzature a pressione e degli insiemi. In Italian
Kolekcja BazTech
Identyfikator YADDA bwmeta1.element.baztech-article-BPW6-0015-0007
Identyfikatory